Read Microsoft PowerPoint - Presentation Geoconsult ZT GmbH MERGED.ppt [Compatibility Mode] text version

Austria Showcase

Austrian Railway Technology

Dr. Friedrich Prinzl Bangkok 8th June 2011

GEOCONSULT

GEOCONSULT

An Engineering & Consultancy Group in the disciplines of civil, structural and geotechnical engineering, soil & rock mechanics, geology, environmental & mining engineering Private Independent International More than 35 years of experience More than 2000 projects in over 50 countries Approx. 400 employees Offices in: Argentina, Austria, Chile, Germany, India, Mexico, Romania, Singapore, Slovak Republic, Taiwan, USA

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

2

Organisation GC Group

GEOCONSULT

Geoconsult Holding ZT GmbH Salzburg, Austria

Geoconsult Wien ZT GmbH Vienna, Austria

Geoconsult spol.sro Bratislava, Slovak Republic

Geoconsult AS PTE LTD Singapore

GC Buenos Aires S.A. Buenos Aires, Argentina

Geoconsult India Pvt. Ltd. Gurgaon, India

Geoconsult ZT GmbH Salzburg, Austria

GC Latinoamerica Ltda Santiago de Chile, Chile

GC Sao Paulo Sao Paulo, Brazil

GC Deutschland Freilassing, Germany

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

3

Areas

Geotechnics & Tunnelling Structural Engineering Geology & Hydrogeology

GEOCONSULT

Water & Environment Transportation & Infrastructure Instrumentation & Data Management

Services:

Investigation Programs Feasibility Studies General Project Studies Preliminary Design Tender Design Tender Documents Detailed Design Cost Estimating Environmental impact statements & assessments Bid evaluation Project management Construction supervision Geotechnical Instrumentation & Monitoring Quality control Technical assistance Expert opinion Training programs Public participation model Interpretation of Geotechnical Data

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

4

Selected References Railway

HSR Munich ­ Verona, Brenner Northern Access Corridor, Austria HSR Cologne ­ Frankfurt, Germany

Tunnels Dernbach, Deesener Wald, Hellenberg

GEOCONSULT

HSR Stuttgart ­ Ulm, Germany

Stuttgart 21, Wendlingen ­ Ulm (Contract PA2.1 "Alpvorlandtunnel")

HSR Lahore ­ Rawalpindi, Pakistan HSR Taipei ­ Kaoshiung, Taiwan

C230, C240, C260

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

5

Selected References Railway

Brenner Base Tunnel, Austria/Italy Koralm Base Tunnel, Austria Semmering Base Tunnel, Austria Lyon ­ Torino Base Tunnel, France/Italy Udhampur ­ Srinagar ­ Baramula Railway Pir Panjal Tunnel, India Lowari Rail Tunnel Project, Pakistan Ferrocarril Transandino Central, Argentina/Chile

GEOCONSULT

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

6

Selected Railway Projects

HSR Graz ­ Klagenfurt, Austria

incl. Koralm Base Tunnel

Length: 32.8 km, excavation: TBM, partly NATM Excavation area: 77 ­ 95 m2, max. overburden: 1,250 m; Lead consultant Services for Main Tunnel & Exploration Measures:

Feasibility and route selection studies Preliminary design and project Environmental Impact Assessment incl.cost estimates on probabilistic data base, risk analysis, public relations procedure Hydrogeological investigation, mapping and monitoring incl. analysis & data processing Preparation of tender documents & tender design Detailed design Geotechnical services on site Construction management

GEOCONSULT

49°

12°

14° Czech

Republic

16°

Germany

48°

Linz

St. Pölten

Slovakia

Vienn a E isenstadt

S alz burg Breg en z Innsbruck 47°

Austria

Graz Klagenfurt

Hungaria

Switzerland

Italy Slovenia

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

7

Selected Railway Projects

HSR Munich ­ Verona, Austria

Brenner Northern Access Corridor Section Kundl/Radfeld ­ Baumkirchen

Entire route: approx. 41 km Section length with GC involvement: approx. 27 km; incl. tunnels, troughs and underground sections

GEOCONSULT

49°

12°

14° Czech

Republic

16°

Germany

48°

Linz

Slovakia

St. Pölten

S alz burg Breg en z Innsbruck 47°

Austria

Graz Klagenfurt

Vienn a E isenstadt

Hungaria

Switzerland

Italy Slovenia

Services:

Preliminary project, public inquiry, Tender design and preparation of tender documents, detailed design, geotechnical services on site, construction supervision

Mined tunnels:

Brixlegg (7,420 m), Jenbach (4,793 m) and Stans/Terfens (8,500 m)

Cut & Cover tunnels and troughs:

Radfeld (appr. 790 m), Brixlegg East (appr. 1,600 m), Brixlegg West (River Inn crossing ­ appr. 1,800 m), Münster (approx. 1,200 m)

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

8

Selected Railway Projects

HSR Taipei ­ Kaoshiung, Taiwan

Construction Lots C230, C240, C260

C230: 8 tunnels, total length appr. 6 km C240: 11 tunnels, total length appr. 6 km C260: 7 tunnels, appr. 9 km; Geology: Soft rock; mined tunnels: NATM, pipe roof Services: C230 & C240:

BOT Tender preparation for the Client, Detailed Design for Mined Tunnels and C&C, Geological Mapping of Alignment and Portal Areas, Geotechnical Services during Construction, Design of Standard Cross-Sections, Geological and Geotechnical Training

GEOCONSULT

C260:

BOT Tender preparation for the Client, Geological Mapping of Alignment and Portal Areas, CICE for Design (Contractor's Independent Checking Engineer)

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

9

Selected References Subway Systems

Bochum, Germany (Contract 3/1, First application of side

galleries and temporary invert)

GEOCONSULT

Munich, Germany (Contract Section of NATM in cohesionsless

soils; Line 5/9, Contract Section 2, ground treatment)

Essen, Düsseldorf, Frankfurt, Duisburg, Germany Pittsburgh, USA (Introduction of NATM to USA) Atlanta, Washington, USA Sao Paulo, Brazil (Introduction of NATM to Brazil) Rio de Janeiro, Brazil Barcelona, Spain Seoul, South Korea Busan, South Korea (Contract 1-9 and 1-3, Introduction

of NATM to Korea)

Seoul

Hongkong, China (MRT Hongkong, Introduction of

NATM to Hongkong)

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

Singapore

10

Selected References Subway Systems

Caracas, Venezuela Singapore (Contract 105, Introduction of NATM to Singapore) Vienna, Austria (U3/10, U3/9, U3/4, U6/3, U3/14) Athen, Greece Taipei, Taiwan (Introduction of NATM to Taiwan) Ankara, Istanbul, Turkey London Jubilee Line Extension, Great Britain Genova, Rome, Italy Bangkok, Thailand Porto, Portugal Santiago de Chile, Chile New Delhi, India Budapest, Hungary Perth, Australia Dubai, United Arab Emirates

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

GEOCONSULT

Washington

Bangkok

11

Selected Projects Subway

Metro Santiago de Chile

Participation in Lines 2, 4, 5 in several sections of the system, either for design services (all phases) and for construction supervision or technical assistance Length: more than 60 km of running tunnels Stations: more than 25 stations with excavation cross sections from 160 ­ 180 m2 (partly C&C, partly mined) Examples of Geoconsult's Services:

Extension of Line 2 from station Dorsal at Avenida Recoletta to Avenida Americo Vespuci Structures: Mined station (NATM) including access and platform tunnels; cross section area: 125 ­ 150 m2; various emergency exits and ventilation shafts, single track running tunnel: 2.7 km; cross section area: 50 ­ 66 m2 Services: General project, tender design and documents, detailed design, construction supervision.

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

GEOCONSULT

12

Selected Projects Subway

MRT Singapore

North East Line, Contract 704 & 706 and Circle Line, Contract 822, 825, 854, 855, 856 Downtown Line, Contract C905, C916, C917, C918, C919, C921 Details NEL C704:

Bored tunnels (EPB shield), single track, two tubes, inner diameter: 5.8 m Length (C704): 2 x 2,5 km, 2 x 1,5 km

GEOCONSULT

Geoconsult's Services

Geotechnical assessment, evaluation of available data, assessment of design parameters as well as recommendations for construction, Detailed design, Design of bored tunnel precast concrete lining, Design of steel segments for bored tunnels at cross passage openings, Temporary support and permanent lining of cross passages and pump sumps, Assessment of surface settlements, Assessment of building damages

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

13

Selected Projects Subway

Metro New Delhi

Metro Delhi, Line 2, Contract MC1B (Chawri Bazaar Station) Details: Metro Delhi Airport Link NATM C6 Package

2-tracked Metro Tunnel in hard and soft rock (quarzite and alluvium: sandy to clayiy silt) Velocity: 135 km/h, low overburden (~15 m), NATM tunnel length: approx. 2300m, Cross section: ~85m² Cut and Cover tunnel length: appr. 300m, Cross section: ~85m², low overburden: 1,5 ­ 20 m 4 NATM start shafts ­ 2 constructed as ventilation shafts.

GEOCONSULT

Geoconsult Services:

tender design, detailed design of double track running tunnel (excavation and support by NATM), ventilation shaft and building, interim NATM access shaft, cut and cover section, ramp section, preparation of geotechnical interpretative report, design coordination, advise during construction on site, geotechnical interpretation and evaluation of monitoring results

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

14

Geotechnical Monitoring

GEOCONSULT

Instrumentation, Data Management & Geotechnical Monitoring

Survey, customized underground & surface monitoring programms, steering systems for TBM, tunnel scanner, installation & monitoring of instruments, collecting, surveying & analyzing measurements, data acquisition, data management

Selected References

Metro de Santiago, Santiago, Chile

Extension of Lines 5 and 2, 6 km NATM tunnel excavation D-displacement monitoring, precise levelling, geotechnical instrumentation and automatic data acquisition system during river undercrossing

Taiwan High Speed Rail C240, Miaoli, Taiwan

11 tunnels, total length of 7.4 km; Optical 3D displacement measurements, geotechnical instrumentation (Extensometers with electrical displacement transducers, electrical radial pressure cells and strainmeters)

Penstock Kaprun, HPP Glockner-Kaprun, Austria

New penstock: 870 m long 45°inclined shaft and 450 m long shallow tunnel; tunnel surveying of the TBM excavation, networks measurement and azimuth determinations by using the Gyromat 2000

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

15

Selected References Thailand

Metro Bangkok Blue Line, Northern Section

Design and Construction of Stations and Running Tunnels between Tiam Ruam Mit and Bang Sue. The scope of works included the detailed design for the twin bore running tunnels, cross passages and intervention shafts Project period: 1997 ­ 2000

GEOCONSULT

M:\Firmen Praesentationen\Geoconsult\Spezielle Praesentationen\WKO Austrian Railway Technology Bangkok.ppt

16

Thank you for your attention!

Information

Microsoft PowerPoint - Presentation Geoconsult ZT GmbH MERGED.ppt [Compatibility Mode]

17 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

148976