ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

TABLE OF CONTENTS

SECTION I 1.1 1.2 1.3 1.4 SECTION II 2.1 2.2 2.3 2.4 SECTION III 3.1 3.2 SECTION IV 4.1 4.2 4.3 4.4 4.5 SECTION V 5.1 5.2

GENERAL INFORMATION Message from G.M. Services Organization Contact Information RESOUCE INFORMATION Summary of Key Personnel - Office Staff Summary of Manpower ­ Labor Summary of Equipments Resume of Key Personnel PROJECT REFERENCES Heavy Industrial Plant Projects Civil, Building, and Architectural Projects TECHNICAL POLICIES, PROCEDURES, AND PLANS Project Execution & Management Statement Quality Assurance Statement Quality Assurance Policy & Procedure Health & Safety Statement Health and Safety Policy & Procedure CERTIFICATE INFORMATION Commercial Registration Chamber of Commerce 90 91 81 82 84 87 87 67 74 9 11 12 14 3 4 6 7

SECTION VI

REFERENCE DOCUMENTS

Page 1 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION I GENERAL INFORMATION

Page 2 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

Dear Customers,

Thank you for taking your valuable time to read our PreQualification Documents. We hope that you may find all the necessary information to discover that Alfa Al-Khaleej Est. is suitable company for your valuable project. For past several months, the collapse of United States economy had negative effect on global economy; however, the Kingdom of Saudi Arabia seems impervious to economical downfall of the global giant. Inside sources indicate that Saudi Arabia economy will be on the rise, which indicates that there will be continuous rollout of big projects. With discovery of new oil fields and gas fields on regular basis, the economical outlook in the Kingdom of Saudi Arabia is prospective. We have included in this document, just about every aspect of our company to inform you, guide you, and most importantly, demonstrate to you how we have grown from small General Contractor Company to medium size General Contractor Company with good reputation. To us, number of men working for us, amount of profit that we made, and numbers of equipments we have are not important. We strongly believe in customer satisfaction and building strong relationship with our customers and maintaining that relationship. That is the legacy that keeps us running and that is the main reason for our growth. We have experienced and qualified managers for each department. We have Engineers of all discipline, Planners, Schedulers, QA/QC Inspectors, Safety Engineers, Material Engineers, and Draftsman. Our key personnel and engineers are conversant with Saudi Aramco Engineering Standards (SAES's), related international standards in construction, QA/QC procedures and Safety requirements as most of them worked previously in Saudi Aramco projects.

Page 3 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

We have skilled laborers of all different field and we have highly qualified Foremen to manage these Labors. In addition; if necessary, we have available visas to hire additional manpower of any category, to back-up our existing manpower resources. With the qualities of our staff, labors, and available resources and materials, we can accomplish any project on time within budget and at high level of quality and safety. Our mission is to complete the project right on time and right on budget with quality that would provide 100% satisfaction to our clients. We look forward to working with you in near future.

Sincerely,

General Manager: H.J. LEE

Page 4 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

1.2 SERVICES

CIVIL WORK Site preparation, Temporary Facilities, Civil Structure such as Tank Foundation, Dike Wall, Box Culvert, Pipe Rack, Pipe Sleeper and Support, Equipment and Machinery Foundation, Drain Pit, Pipe Anchor, Water & Sewer Storage Tank, Storm Collection Pit and Ponds, all kinds of Pavement, including Security Fence and Gates.

BUILDING WORK Construction of Building Foundation, Concrete Structure, and Steel Structure for Residential, Commercial and Industrial Building including necessary Finishing Works such as Masonry, Stone and Tile Fixtures, Carpentry Works for Ceiling, Partition, Decoration, Door and Windows, and etc.

ELECTRICAL, INSTRUMENTATION, AND TELE-COMMUNICATION WORK Electrical works associated to buildings, Low & High Voltage Power Cable Installation, Transformer, Switchgear, area Lightings, and Fire Alarm System and etc. Installation of Instrumentation Control Cables including control panels and system for all fields as demanded. Installation of Fiber Optic, Telephone Cables, Communication Tower Construction & Repair, and any work associated with above works are our specialty.

H.V.A.C. & MECHANICAL WORK Mechanical works associated to building construction such as Sanitary Fixture, Water Supply Line, Drainage Line, HVAC works and infra utilities such as Drainage & Sewer Line, Fire Hydrant Line, Water Distribution System, Irrigation System, Lift Station, and etc.

Page 5 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

1.3 ORGANIZATION

Page 6 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

1.4 CONTACT INFORMATION

COMPANY COMMERCIAL REGISTRATION DATE OF ISSUE PLACE OF ISSUE ADRESS

: Abdullah Al Shaikh Est. : 2051027095 : 25/10/1423 : Dammam : P.O. Box 31591 Al Khobar 31952

PHONE NUMBER FAX NUMBER BUSINESS HOURS

: (03) 867-8338 : (03) 896-2112 : 8:00 AM ­ 1:00PM 2:00 PM ­ 7:00 PM

CONTACT PERSON

: Hyung Jae Lee, General Manager [email protected] (050) 547-8061

CONTACT PERSON

: Daniel Lee, Project Director [email protected] (053) 513-7506

Page 7 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION II RESOURCE INFORMATION

Page 8 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

2.1 SUMMARY OF KEY PERSONNEL ­ OFFICE STAFF

NO TRADE HEAD OFFICE STAFF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 GENERAL MANAGER ADMIN. DIRECTOR SECRETARY PERSONNEL GOVT' RELATION ACCOUNTANT PROCUREMENT ENGINEER LOCAL PURCHASER OPERATION MANAGER QA / QC ENGINEER SAFETY OFFICER SAFETY OFFICER SCHEDULING ENGINEER COST CONTROL ENGINEER AUTO CAD ENGINEER SENIOR CIVIL ENGINEER SENIOR ELECTRICAL ENGINEER SENOIR MECHANICAL ENGINEER KOREA KSA INDIA PAKISTAN KSA INDIA INDIA PHILIPPHINE PHILIPPHINE PHILIPPHINE PHILIPPHINE INDIA PHILIPPHINE PHILIPPHINE PHILIPPHINE PHILIPPHINE PHILIPPHINE KOREA NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO 1 1 1 1 2 2 1 1 1 3 3 7 1 1 1 4 1 1 NATIONALITY UNIT Q'TY

TOTAL FOR HEAD OFFICE STAFF

33

Page 9 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

NO

TRADE SITE OFFICE STAFF

NATIONALITY

UNIT

Q'TY

19 20 21 22 23 24 25 26 27 28 29 30 31 32

PROJECT MANAGER SITE MANAGER CONSTRUCTION MANAGER QA / QC CONTROL ENGINEER CIVIL SECTION ELECTRICAL SECTION SAFETY SUPERVISOR SAFETY SUPERVISOR SITE CIVIL ENGINEER SITE CIVIL ENGINEER ELECTRICAL ENGINEER MECHANICAL ENGINEER SITE ADMIN / ACCOUNTANT KOREAN SUPERVISOR

PHILIPPHINE PHILIPPHINE KOREAN PHILIPPHINE PHILIPPHINE PHILIPPHINE PHILIPPHINE INDIA PHILIPPHINE INDIA PHILIPPHINE PHILIPPHINE PHILIPPHINE KOREA

NO NO NO NO NO NO NO NO NO NO NO NO NO NO

1 1 1 2 2 1 1 1 2 2 1 2 1 2

TOTAL FOR SITE STAFFS

20

NO INDIRECT STAFF 1 2 3 4 5

TRADE

NATIONALITY

UNIT

Q'TY

TIME KEEPER / CAMP BOSS WARE HOUSE CONTROL WORK SHOP SUPERVISOR OFFICE BOY OFFICE DRIVER

INDIA PHILIPPHINE PHILIPPHINE PAKISTAN PAKISTAN

NO NO NO NO NO

1 1 1 1 2

TOTAL FOR INDIRECT

6

Page 10 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

2.2 SUMMARY OF MANPOWER ­ LABOR

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 CIVIL SUPERVISOR BUILDING SUPERVISOR CIVIL & CARPENTRY FOREMAN ELECTRICAL FOREMAN MECHANICAL FOREMAN CIVIL FOREMAN / LEADMAN CARPENTER - FORM WORKS STEEL FIXER MASON / PLASTERER PAINTER TILE SETTER FINISHING CARPENTER SURVEYOR RIGGER / TOWER ERECTION ELECTRICIAN PLUMBER LABOR WELDER STEEL FABRICATOR EQUIPMENT OPERATOR SCAFFOLDER HEAVY DUTY DRIVER DRIVER MECHANIC MECHANIC HELPER STORE KEEPER CAMP CLEANING COOK NURSE 1 1 1 2 1 1 2 1 5 1 15 7 4 4 11 5 1 1 6 5 51 12 1 2 1 23 2 3 2 23 3 1 1 125 1 3 2 82 1 3 5 1 1 9 11 5 6 1 8 18 18 14 3 2 15 19 13 6 13 6 5 9 3 5 3 1 1 4 211 76 71 1 TRADE PHILLIPPINE 1 PAKISTAN INDIA 1 NEPAL BANGLADESH RENTAL TOTAL 2 0 1 0 1 23 271 129 112 20 0 2 3 5 10 6 253 7 0 15 54 32 24 4 0 2 3 2

TOTAL FOR CONSTRUCTION

39

121

114

171

19

981

Page 11 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

2.3 SUMMARY OF EQUIPMENTS

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DESCRIPTION HEAVY EQUIPMENT Pay Loader Excavator Loader Backhoe Uni loader Dump truck Boom truck Water tanker Low bed trailer Roller Compactor Air Compresser Jack Hammer HD High Bed Trailer Hollow Block HD Cutter Drum Vibratory Soil Compactor DESCRIPTION LIGHT EQUIPMENT Rammer Compactor Plate compactor Roller Compactor Elec. Generator Elec. Generator Elec. Generator Elec. Generator Elec. Generator Elec. Generator Concrete Mixer Concrete Mixer Concrete Vibrator Concrete Vibrator Table saw Pipe Bending Machine Pipe Tread Machine Electric Cable Detector Jet wash Machine Water Trolly Trolly for Light weight Bar Bending Machine Grounding Testor Level Total Station DUMEC DUMEC DUMEC MODEL CATERPILLER POCLAINE JCB JCB MERCEDEZ MERCEDEZ MERCEDEZ DUMEC INGASOLAND INGASOLAND CAPACITY 966 0.75 m3 UNIT No No No No No No No No No No No No No No UNIT No No No No No No No No No No No No No No No No No No No No No No No No Q'TY 1 1 2 2 2 3 3 1 1 2 2 1 1 1 Q'TY 8 6 1 2 2 2 1 1 5 1 1 10 6 4 1 1 1 1 2 2 1 2 4 2

16 m3 7 ton Lifting 180000 lts. 10 ton 125 cfm

Volvo SD-100DC MODEL CAPACITY

1 ton 25 kw 15 kw 10 kw 120kw 75 kw 3kw - 5 kw 2 bagger 1 bagger 2" 1 1/2 "

SOKKIA SOKKIA

Page 12 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

NO VEHICLE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Cadillac Escalade Trail Blazer Santa FE Trajet Van Coaster Bus Coaster Bus Bus Bus Pickup (Twin Cabin) Pickup (Twin Cabin) Pickup (Twin Cabin) Pickup (Twin Cabin) Pickup (Twin Cabin) Cadillac Chevrolet Hyundai Hyundai Hyundai Toyota Nissan AshokLeyland International Nissan KIA ISUZU Mazda Ford No No No No No No No No No No No No No No 1 2 5 1 4 1 1 2 10 1 1 2 2 2 DESCRIPTION MODEL CAPACITY UNIT Q'TY

12 seat 25 seat 25 seat 55 seat 55 seat

Page 13 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

2.4 RESUME OF KEY PERSONNEL

This section comprised of our key personnel resumes.

Page 14 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: HANIBAL GERONIMO Operation Manager. NATIONALITY: YEARS WITH COMPANY: Philippines 4 Year

EDUCATION NAME OF INSTITUTION GRADUATE : UNDERGRADUATE: TECHNICAL: FEATI University Manila, Philippines B.S. Civil. Engineering / 1989 DEGREE / CERTIFICATE

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh Est. Operation Manager. - Civil AAC - JUBAIL FROM: Dec. 2005. TO: Till date

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · Operation Manager of Company organization Responsible for operating manpower & equipment requirements for all projects Monitor progress schedule for all project. Review technical and commercial proposal prior to submittals to clients.

COMPANY: POSITION: PROJECT:

Al Awsat Trading & Contracting Co. Site Manager. Planning & Scheduler.

FROM:

Oct. 2002

TO:

Nov. 2005

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · Site Manager for Building, Civil works of R.O. Plant ­ Abqaiq / Inside Aramco under F.M.Q. Planning & Scheduling Engineer for Civil works of EPIC 3 New LPG Tank project / Masaeed ­ Qatar, Under Sam Sung Corp. Co., Site Engineer for STC GSME5 AND E6 Project under NOKIA- Western Region, Construction of New GSM Sites, BTS Swap, BSC expansion BTS expansion.

COMPANY: POSITION: PROJECT:

Lucent Tech. Int'l. Inc. Riyadh, K.S.A. Site Supervisor.

FROM:

July. 1997.

TO:

Sept. 2002

Page 15 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Site Supervisor for TEP6 outside Plant Project under taking monitoring & supervise fiber optic cable laying done by various subcontractors. A. De Vera Corporation Valenzuela, Metro Manila, Phils. Production & Fabrication Engineer. FROM: Oct. 1994. TO: July. 1997

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Production/Fabrication Engineer for Electro Mechanical & Structural Steel Structures Projects Masada Consolidated Works Caloocan City, Philippines Project Engineer. FROM: Jan. 1990 TO: Sept. 1994

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · SKILLS · Computer literate: Microsoft Project 2000, Microsoft Office, AutoCAD 2007. Project Engineer for various building construction projects

Page 16 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Peter D. Gaffud Civil Engineer NATIONALITY: YEARS WITH COMPANY: Philippines 2 Years

EDUCATION NAME OF INSTITUTION GRADUATE : UNDERGRADUATE: TECHNICAL: Far Eastern University, Manila B.S. Civil Engineering / 1981 DEGREE / CERTIFICATE

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh Est Site Engineer FROM: July. 2007 TO: Present

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · Responsible for the supervision of construction of GIS Building, Substation Building & Blackstart Emergency Generator Building under Energy & Power Company, Aramco Project, Shaybah, K.S.A. Supervision for Civil Works of GOSP 3 Modification under Sunchang & Al Shaikh Co. Ltd., Aramco Project, Abqaiq, K.S.A. COMPANY: POSITION: PROJECT: Saudi Electric Co. (SEC-SOA), Jisan, K.S.A. Building Maintenance Specialist. FROM: Apr. 2001 TO: Aug. 2003.

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · Execute and implement maintenance of project both preventive & corrective. Prepare and submit program plans including required reports. Responsible in the management and mobilization of equipments and manpower.

COMPANY: POSITION: PROJECT:

Steel System Eng'g of the Phils, Pasig, Phil. Detailer and Fitchecker.

FROM:

Apr. 1989

TO:

Mar. 2000

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Perform detailing functions according to its design and specification.

Page 17 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT: A. De Guia Construction, Isabela, Philippines Quality Control Inspector (Civil). FROM: Feb 1997 TO: April 2001

BRIEF DESCRIPTION OF RESPONSIBILITIES: · QA/QC for various vertical & horizontal construction projects.

COMPANY: POSITION: PROJECT:

Goodwill Eng'g. Project Ltd., Singapore Site Supervisor.

FROM:

Oct. 1993

TO:

Oct. 1995

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · Supervision of vertical construction particularly in structural civil works, Plumbing & Sanitary. Represent the company in official capacity especially during project inspection, coordination to the consultant and subcontractors.

COMPANY: POSITION: PROJECT:

Lucky Cement Corporation. Ilan Shien, Taiwan Production Staff

FROM:

Jun. 1981

TO:

May 1984

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · Responsible for manpower handling in the operation and maintenance of rotary packing machines. Supervise the upgrading of production facilities relative to structural and civil works. Cagayan Valley Const. Corp. Supervising Civil Engineer. FROM: Jun. 1981 TO: May 1984

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Responsible in the management & supervision of vertical and horizontal projects. National Irrigation Administration, Isabela, Phils. FROM: Jun. 1981 TO: May 1984.

COMPANY:

POSITION: PROJECT:

Engineer Assistant "B".

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Supervision of lot survey for irrigation project facilities construction.

Page 18 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· Supervise of pre-construction and construction of irrigation facilities such as irrigation canals, canal structures, cofferdams, catch dams, farm ditches and road works.

SKILLS · Computer literate: Microsoft Office XP

Page 19 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: June Molina Domingo Site Manager / QA/QC Engr. NATIONALITY: YEARS WITH COMPANY: Philippines 3 Years

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Saint Mary's University, N. Viscaya, Phils. DEGREE / CERTIFICATE B.S. Civil Engineering / 1986 .

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh Est. Site Managaer / QA/QC Inspector. FROM: July. 2006 TO: Present

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Site Manager and QC/ Inspector for building works and civil works of GIS Building, Substation Building & Black start Emergency Generator Building under Energy & Power Company, Aramco Project, and Shaybah K.S.A. · · Site Manager for Temporary Facilities for Hyundai Heavy Industries at Marafiq, Jubail, K.S.A. Approved Aramco QA/QC Inspector (Civil) SAP # 70004616

COMPANY: POSITION: PROJECT:

Al Awsat Trading & Contracting Co, K.S.A. Site Manager, QA/QC Inspector, Site Engineer.

FROM:

Oct. 1997

TO:

July. 2006

BRIEF DESCRIPTION OF RESPONSIBILITIES: · QA/QC Inspector for the Building Works of Replace Water Treatment Facilities under Faizal Qhatani Sons, Aramco Project, Abqaiq Plant, K.S.A. · · · · QA/QC Inspector for Civil works of EPIC of 3 LPG Tanks & Conversion of 2 nos. of Butane Tanks under Samsung Engineering and Qatar Petroleum, NGL Terminal, Messaeed Industrial City, Qatar Site Engineer & QA/QC Engineer for Saudi Telecom GSM E5 & E6 under NOKIA Western Region, construction of GSM new builds sites & expansion projects. Quantity Surveyor 200K, 300K, JDMW, NCE, 500K Extension of TEP6 GSM Project under House of Invention Int'l. And Lucent Technologies Int'l., Saudi Arabia. Site Engineer for Saudi Telecom 300K, 500K WLL, JDMW TEP6 GSM Project under Abdullah Said Bugshan Bros. and Lucent Technologies Int'l. Saudi Arabia

COMPANY:

Dimson Manila Incorporated, Manila, Phil.

FROM:

June 1988

TO:

Sept. 1997

Page 20 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

POSITION: PROJECT: Project Engineer, Quantity Engineer, Bridge Engineer, Quantity Engineer & Surveyor.

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Project Engineer for the construction of dam, irrigation facilities spillway of Lagunlong SWIM Project under Department of Public Works & Highways, Philippines. · Quantity Engineer for Baco ­ San Teodoro Road Project, Phase 2 under the Department of Public Works & Highways (Region 4B), Philippines. · Field Engineer for the Road const. of Abra de Ilog ­ Puerto Galera Road Project (USAID ­ US Aid for International Development Project) under Department of Public Works & Highways, Philippines. · Bridge Engineer for the construction segmental type pre-stress bridge of Laoag ­ Allacapan Road Project Package 1 Segment 15 (Philippine ­ Japan Highway Loan Project) under Public Works & Highways, Philippines. · Surveyor for the Kiangan ­ Antipolo Road Project (TRIP Package 10A) under Public Works & Highways, Philippines.

SKILLS · Computer literate: Microsoft Office XP

Page 21 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Joseph A. Dicen Site Manager / QA/QC Engr. NATIONALITY: YEARS WITH COMPANY: Philippines 3 Year

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: Angeles University, Pampanga, Phils. DEGREE / CERTIFICATE B.S. Civil Engineering / 1985

TECHNICAL:

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh Est. QA/QC Manager Ma'aden Phosphate Power & Desalination Project ­ Ras Al Zawr FROM: Feb. 2009 TO: Present

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · · Attend Weekly Meeting for Client & Contractor Check & Review necessary documents for RFI (Request for Inspection) & conduct inspections with the Client & Contractor Inspector Prepare Daily & Weekly QC/QA Report Prepare & Compile of Quality Related Document Prepare & Issuing Non-Conformance Certificate (NCR) to Contractor as Violation for Quality Procedures, Design & Specification Checking & Ensuring the Machine & Equipment (i.e. Surveying Instruments, FDT (Troxler) Machine, and Compression Machine) are all calibrated. Prepare & Submit Materials for Approval as per the Design & Specification. Prepare & Submit Method of Statement or Work Procedure for Approval to Contractor & Client. Ensuring that all works & materials as per the Approved Design & Specification.

COMPANY: POSITION: PROJECT:

Abdullah Al Shaikh Est. QA/QC Supervisor AAC-Ethylene Amines Project - Jubail

FROM:

Oct. 2008

TO:

Feb 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · Attend Weekly Meeting for Client & Contractor Check & Review necessary documents for RFI (Request for Inspection) & conduct inspections with the AAC (Client) Inspector & Contractor (HEC) Inspector Prepare Daily & Weekly QC/QA Report Prepare & Compile of Quality Related Document

Page 22 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · Prepare & Issuing Non-Conformance Certificate (NCR) to Contractor as Violation for Quality Procedures, Design & Specification Checking & Ensuring the Machine & Equipment (i.e. Surveying Instruments, FDT (Troxler) Machine, Compression Machine) are all calibrated

COMPANY: POSITION: PROJECT:

Abdullah Al Shaikh Est. Site Managaer / QA/QC Inspector.

FROM:

Aug. 2006

TO:

Sep. 2008

250 MBCD Crude Expansion Overhead Transmission Line (115KV); GOSP-2, GOSP-2 to GOSP-4

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Site Manager and QC/ Inspector for Transmission Tower foundation of 250MBCD Crude Expansion O/H Transmision Line Expansion Project under Energy & Power Company, Aramco Project, Shaybah, K.S.A. · · · · · · · · · · Site Manager for Temporary Facilities for Hyundai Heavy Industries at Shaybah, K.S.A. Approved Aramco QA/QC Inspector (Civil) Attend Weekly Meeting for Client & Contractor Prepare necessary documents for RFI (Request for Inspection) & conduct inspections with the Client (Aramco) Inspector (PID; Project Inspection Div.) & Site Superintendent (Aramco) (PMT; Project Mgt. Team) Prepare Daily & Weekly Progress Report Supervise all activities related to Civil Works Prepare & Compile of Quality Related Documents Initiating/Closing RFI for Saudi Aramco E-Log-In (QMIS) Prepare & Issuing Non-Conformance Certificate (NCR) to Contractor as Violation for Quality Procedures, Design & Specification Checking Coordinates & Elev. (By using Total Station Surveying Instruments)

COMPANY: POSITION: PROJECT:

Al Awsat Trading & Contracting Co, K.S.A. Site Manager, QA/QC Inspector, Site Engineer.

FROM:

Apr 1998

TO:

July. 2006

BRIEF DESCRIPTION OF RESPONSIBILITIES: · QA/QC Inspector & Structural Engineer for Civil works of EPIC of 3 LPG Tanks & Conversion of 2 nos. of Butane Tanks under Samsung Engineering and Qatar Petroleum, NGL Terminal, Messaeed Industrial City, Qatar · Site Engineer & QA/QC Engineer for Saudi Telecom GSM E5 & E6 under NOKIA Western Region, construction of GSM new builds sites & expansion projects. · · Quantity Surveyor 200K, 300K, JDMW, NCE, 500K Extension of TEP6 GSM Project under House of Invention Int'l. And Lucent Technologies Int'l., Saudi Arabia. Site Engineer for Saudi Telecom 300K, 500K WLL, JDMW TEP6 GSM Project under Abdullah Said Bugshan Bros. and Lucent Technologies Int'l. Saudi Arabia

Page 23 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT:

AGL Realty & Dev't., Cabanatuan, Phil Asst. Project Engineer/ QC Inspector

FROM:

Apr. 1996

TO:

March1998

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · Project monitoring & supervision including material take off for housing projects. Project Monitoring, Surveillance /Supervision Prepare Daily & Weekly Accomplishment Report Surveying, Lay-out & Prepare Estimates Quantities of Materials Supervise all activities related to Civil Works Prepare & Compile of Quality Related Documents Attend Weekly Meeting

Arrange & prepare necessary equipment & manpower COMPANY: POSITION: PROJECT: ASTRA Company Ltd., K.S.A. Water Treatment Plant & Irrigation Supervisor FROM: Mar. 1994 TO: March1996

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · Supervision & monitoring installation of irrigation water pipelines & programming irrigation controller (Drip & Sprinklers). Supervision & Monitoring for Water Treatment Plant and Irrigation Installation & Repair of Water Pipelines. Prepare Daily & Weekly Report Checking & Programming Irrigation Controller (Drip & Sprinkler) Checking & Prepare Materials needed.

COMPANY: POSITION: PROJECT:

J.P. Aquino & Bros., Tarlac City, Phils Field Engineer

FROM:

Dec. 1991

TO:

Mar. 1994

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · Supervision & monitoring of vertical construction projects. Surveying, Lay-out, Monitoring & Supervision Scheduling of Activities. Prepare Daily & Weekly Accomplishment Report Preparing Cost & Materials Estimates Prepare Drawing & Other related to Civil Engineering Works

Page 24 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT: O.C. Pineda Const., Tarlac City, Phils Field Engineer FROM: Feb. 1987 TO: Sep. 1991

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Supervision & monitoring of vertical & horizontal construction projects including cost estimates. Preparing Cost & Materials Estimates Prepare Drawing, Surveying & Lay-out. Preparation & Submission of Daily & Weekly Progress Report Monitoring & Supervision.

SKILLS · Computer literate: Microsoft Office XP

Page 25 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Robert R. Dela Cruz Site Engineer. NATIONALITY: YEARS WITH COMPANY: Filipino 1 Year

EDUCATION NAME OF INSTITUTION POST GRADUATE : UNDERGRADUATE: TECHNICAL: Tarlac State University Holy Angel University, DEGREE / CERTIFICATE Masters in Public Administration B.S. Civil Engineering / 1987

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh. Site Engineer FROM: Aug. 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Supervise all activities related to Civil Works Project Monitoring & Supervision. Attend Weekly Meeting Arrange & prepare necessary equipment & manpower Prepare Daily & Weekly Accomplishment Report

COMPANY: POSITION: PROJECT:

Department of Agrarian Reform. Engineer II

FROM:

Aug. 1999

TO:

Jul. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Supervise construction and installation of infrastructure projects such as roads, bridges, irrigation systems, water works and water supply, drainage and sewage, buildings, settlers' houses, parks and all other related civil works in agrarian reform areas. Inspect and checks construction of infrastructure projects undertaken by contract work to insure that construction materials used are in accordance with approved plans and specifications Prepare development plan for the farm to market road. Shall maintain close coordination with DPWH, check and confirm detailed field survey results conducted by DPWH. Monitor and evaluate the status / progress of implementation of FMR development component of the province Ensure the prompt and accurate submission of required reports as may be deem necessary. Carry out validation and site inspection of proposed sub-projects as submitted by the LGUs and provide advice and recommendations.

· · · · · ·

Page 26 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· When required and as a result of site validation, assist the LGUs on the surveys needed, procedures for undertaking preengineering works, preparation of engineering plans, detailed estimates, program of works, specifications, standard work items as required by the project. Assist DAR-CPO in providing the LGU technical staff and design criteria and the requirements in preparation of plans and other documents. Review all necessary documents submitted by LGUs, carry out appropriate actions and provide recommendations for smooth processing. Conduct regular supervision and monitoring of all on-going projects implemented by LGU Participate in the conduct of pre-final and final inspection of all implemented and completed sub-projects and submit findings to the LGU and CPO

· · · ·

COMPANY: POSITION: PROJECT:

Mainang resettlement site. Govt. Tarlac Site Engineer / Site Manager

FROM:

Apr. 1993.

TO:

Jul. 1999

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Responsibility to direct and control the operational management of the resettlement site. Oversees and coordinates the activity and various programs of the government agencies and non-government organizations involved in providing assistance and livelihood for the community. Recommends and make decisions on important matters affecting the interest and welfare of the settlers. Assist in the planning, implementation and administration of government infrastructure projects. Insures that all government buildings facilities and equipments are properly utilized, maintained and secured. Makata Foundation Inc. Project coordinator FROM: Mar. 1991 TO: Mar. 1993

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · Responsibility to oversee the overall Operation of the project Coordinate and transact business with concerned GOs, NGOs and Pos. Coordinates the activities of the field staff, prepare and submit periodic reports to the Project Director Prepare weekly forecast and plan of work for the project , execute the project according to plan, specifications and schedule Conduct meeting with co-staff if necessary and perform other duties that maybe assigned by higher authorities. Responsible in supervising all projects undertaken by Administration and by contract. Ensure that all projects were done according to the approved plans and specifications. Conduct regular site inspection of infrastructure within the municipality to ensure that all buildings / structures has the necessary permits and clearances before construction take place.

SKILLS · · Computer Literate Can adjust easily to changes in work environment.

Page 27 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: John L. Canlas Safety Supervisor NATIONALITY: YEARS WITH COMPANY: Filipino 1 Year

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Holy Angel University, DEGREE / CERTIFICATE B.S. Mechanical Engineering / 2000

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Est Safety Officer FROM: Aug. 2008 TO: Aug. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · ·

Monitors the implementation of the requirements of Safety Management Plan and arrange continuous and formal daily safety monitoring to ensure compliance and effectiveness. To liaise with and support Area Engineers/Superintendents/Supervisors to promote safety awareness in their area of responsibility. Monitoring the implementation of completed Risk Assessments. Responsible in issuing detailed weekly/monthly safety reports including all accident/incident, hazards and nearmisses observed, manpower, man hours worked and submit to concerned personnel. Involved in ensuring safety discrepancy logbook is posted in each work areas, its location can be easily noticed/accessed and supervisors review the logbooks on regular basis to take the necessary corrective action. Preparing, submitting daily / weekly / monthly safety report Conduct Toolbox meeting on daily / weekly basis. Attend client's safety meetings. Trust International Paper Corporation Health & Safety, Projects and Equipment Coordinator FROM: Apr. 2001 TO: Jul. 2008

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · Responsible for implementing Standard Operation Procedure (SOP) related to proper wearing of Personal Protective Equipment (PPE). Responsible for issuing gloves, dust mask, spectacles and other PPE's. Accomplishes "incident Reports", "Accident Reports" for any critical incidents.

Page 28 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · Responsible for following-through of all reported critical incidents pertaining to completion and cost-effectiveness of implemented corrective / preventive actions. Shall closely monitor all hot works and elevated works Recommends issuance of "notice of corrective action" to any crew who is deviating from any SOP's pertaining to Health and Safety To monitor all corrective / preventive action are follow

COMPANY: POSITION: PROJECT:

Golden Cane Furniture Manufacturing Corp. Tube Mill Engineer

FROM:

Oct. 1998

TO:

Mar. 2001

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · · In-charge for Tube-Mill Machinery and Equipments. Responsible for all the supply needed in operation including machining and motor rewinding. Safety Engineer Assure good quality of tubes and pipes. Ensure that all tubes production is carried out as per specification. Repair and maintenance of Tube Mill Machines Mechanical Parts. To keep records of output, stocks and delivered tubes. To maintain working area neat and clean Co-operator of Tube Mill Machines.

· To ensure that all equipments and machineries are in good condition. Responsible for all the scheduling of manpower and their respective tasks

SKILLS · · · Excellent in oral & written communication, Computer literate- MS Office Proficiency in operating light and heavy duty vehicles (forklift, pay loader) and equipment.

Page 29 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Darwin Macapagal Campo Material Procurement Engineer NATIONALITY: YEARS WITH COMPANY: Filipino 1 Year

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: University of East Manila DEGREE / CERTIFICATE B.S. in Electronics & communication Engineering TECHNICAL:

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al Shaikh Est. Material Control & Admin Supervisor FROM: Sep. 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · ·

Monitor daily output of the production line to ensure 100% plan achievement. Monitors and control construction materials and equipments. Make monthly forecast on material requirements based on the monthly plan. Submit required documents for material review and approval. Ensure that all materials used in the site are within specifications. Control manpower and logistics. Control project petty cash.

Make monthly report for manpower accommodation. COMPANY: POSITION: PROJECT: Sanyo Semiconductor manufacturing Phils. Sales Consultant FROM: Oct. 2001 TO: Aug. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · ·

Monitor daily output of the production line to ensure 100% plan achievement. Closely monitor machine uptime to ensure required output per machine is attained. Ensure that manpower can support the daily output requirement. Ensure compliance by manufacturing personnel to procedures and ISO2001:2000 and QS9000 standards Ensure the availability of materials of the process. Communicate with the support groups like MED and QA/QC regarding process improvement and material availability. Prepare 3 months plan of testing process based on 3 months projection of customer. Monitor OTP (One Year Target and Plans) of subordinates, ensure accomplishment of monthly activities.

Page 30 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT: Amertron Inc. Clark Branch Product line Manager ­ Opto coupler line FROM: Jul. 2000 TO: Oct. 2001

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · ·

Monitor daily output of the production line from DB to testing process to ensure 100% delivery performance. Closely monitor machine uptime / downtime to ensure required output per machine is attained. Ensure that manpower can support the daily output requirement. Ensure compliance by production, maintenance and engineering personnel. Ensure the availability of materials from front end to back end of the process. Directly communicate with the customer for both production and process quality improvement. Attends to complain addressed by the customer from the products being produced. Communicate with the other departments such as QC/QA group for process improvement. Implement action plans directed towards yield and process efficiency improvement. Regular monitoring of process yield. Conducts failure analysis on customer complaints. Ensure compliance by production personnel. Al-Awsat Network System Product line Manager ­ Opto coupler line FROM: Nov. 1998 TO: May. 2000

COMPANY: POSITION:

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · Assist and coordinate with GSM Engineering in planning and implementation. Receives and arrange shipping schedule of GSM containerized cell sites. Extract and update information from FDED Final Detailed Engineering Design for site configuration and BSS requirement as per MSC. · · · · · · · SKILLS · Computer literate Attend to queries and problems encountered on site. Be able to balance manpower requirement for OSI/ISI jobs. Make an assessment of the job as per priority and make sure that all jobs are on record. Follow-up necessary documents such as floor plan and cell sites configuration. Suggest floor layout modification to accommodate proposed equipment for expansion. Ensure that installation group can meet the sites needed delivery date. Submit daily shipping report to all concerned personnel.

Page 31 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Aravindanakshan Nair Safety Supervisor NATIONALITY: YEARS WITH COMPANY: Indian 1 Year

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Kerala University Larsen & tubro DEGREE / CERTIFICATE Pre Degree Diploma in Welding Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Supervisor FROM: Sep. 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · ·

Promote client health, safety and environments through awareness and monitor compliance with said requirements. Conduct safety orientation for new employees. Development, Implementation, Enforcement and Administration of Safety Hazards, requirement in accordance to the project standard. Attend daily project progress meeting in regard to note client safety related and provide feedback on corrective / preventive action implementation of issue previously noted. Participate in walk through audits within the boundaries of company activities. Behavior Monitoring. Involvement through application in compliance of review of completed JSA Documents. Hazard identification and Risk Assessment. Maintain a complete and up-to-date record of safety inspection reports/competent/authorized personnel, rigging certifications, heavy equipment third party inspection certificates, safety statistic and other required documents in the project.

· · · · · ·

Stop any activity immediately on detection of any standard act, condition or potential hazard that would or could cause harm to an employee. Waste management (Disposal and Segregation). See that mandatory safety and security rules and regulations of the company are being onserves and implemented. Assist the manager in implementation of the regional HSE Policies and Procedures. Provide professional advice to the local team on the existing and new HSE initiatives. Manage all HSE system and programs.

Page 32 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · ·

Monitor and track the HSE training imparted to the operating personnel. Responsible for the maintaining necessary records for compliance with permits and preparing appropriate environmental, health and safety reports. To establish priorities and to develop, implement, continuously improve HSE programmes and performance. AYTB Company Limited Safety Officer Yansab Petrochemical Project Yanbu FROM: Mar. 2006 TO: July. 2008

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · ·

Daily Job Safety Analysis Assess the situation and prevention of accidents. Daily work permit and other safety requirements. House keeping and other environmental safety. Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability Attend everyday tool box meeting and weekly safety meeting made aware the workers about the safe work practice. Conduct safety orientation to worker and others. Checking the safe work plan before starting the work. Educate the supervisors and working crew to follow safe working practices. AL Suwaidi Industrial Service Company Safety Officer Yep-DBN Expansion Project Yanbu FROM: May. 2003 TO: Feb. 2006

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Participate in walk through audits with in the boundaries of company activities. Daily behavior Intervention to monitor company personnel compliance with safety requirements. Investigate accidents/incidents including near misses, determine probable cause, and develop appropriate safety measures to prevent recurrence of similar incidents. Emergency response procedure, familiar with the project emergency procedure and ensure that the same is fully conveyed to the site employees. Initiate response in event of emergency. Participate in emergency post mortem review. Monitor implementation of corrective action. Supervising the record and analysis information on objective and targets, incidents, behavior monitoring and corrective/preventive action. Implementation and review overall safety performance.

Page 33 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SKILLS Computer Skills

· ·

Familiar with Windows Operating systems. Can prepare document using MS Word, Can Create Excel Spread Sheets, etc.,

Professional Skills & Qualities

· · ·

Self ­motivated and target oriented Ability to save time and money Ability to work in team

Page 34 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Khudrathulla Shaik Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 7 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Saboo Siddiq Poly Technic College Institute of Labor & management DEGREE / CERTIFICATE Diploma in Mechanical Diploma Industrial Safety

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Dec 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · · ·

Supervision of everyday work on site to ensure strict compliance of safe work plan by all in their given area of responsibility. Inspection of all Safety Equipments such as PPE, safety Belts, Fire Extinguishers etc., to ensure the reliability. Evaluate the plan for work scheduling and preparation of materials, equipments & manpower. Check the operation of construction project and adopt counter measures if necessary. Prepare daily accomplishment reports. To attend everyday tool box meeting and weekly safety meeting with the workers about the safe work practice. To attend weekly project review meetings to discuss and explain how safety help progress. Conduct safety orientation to the workers and others as and when required. Daily inspection of scaffoldings. Auditing monthly color code, weekly scaffold tags and fire extinguisher tags. Weekly safety inspection joint with client and making deviation report and its corrective actions and remedial measures. Preparation of accident, incident and near miss reports, the root cause for accidents and its preventive measures. Inspecting the work site and taking suitable steps to eliminate all the unsafe working condition and potential hazards and to maintain good housekeeping.

COMPANY:

Jana Hassad Project Civil & Building, including Mechanical works

FROM:

Jan. 2006

TO:

Nov. 2008

POSITION: PROJECT:

Safety Officer

Page 35 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · ·

Inspection of all safety equipments such as PPE, safety belts, fire extinguishers etc. Organize people to their own respective assignments. Check the quality of products and adopt counter measure if necessary. Conduct safety orientation to the workers and others. Daily work permit and other safety requirements. Assess the situation to prevention of accidents. Checking safety around Scaffolding works. Supervision of everyday work on site to ensure strict compliance of safe work plan. Scaffolding inspection to ensure that they are made as per applicable standards. Preparation of job safety analysis and hazard identification. Checking and monitoring the scaffolding tag system. Shajal International General Contracting Safety Officer Civil & Building, including Mechanical works FROM: May. 2004 TO: Dec. 2005

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · ·

SKILLS

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Daily work permit and other safety requirements. Assess the situation to prevention of accidents. Checking safety around Scaffolding works. Auditing monthly color code, weekly Scaffold tags and Fire Extinguisher Tags. Involved in preparing and issuing Final Safety Report for the Project. Conduct safety orientation to worker and others. Daily inspection of heavy equipments check list. Auditing Machinery electrical equipments, lifting equipments and scaffolds. Inspecting the work site and taking suitable steps to eliminate all the unsafe working conditions and potential hazards and to maintain good housekeeping. Preparation of job safety analysis and hazard identification.

Computer Skills

·

Computer Literate.

Professional Skills & Qualities

Page 36 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· ·

Self ­motivated and target oriented Ability to work in team

Page 37 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Gitian shailesh Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 7 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Zantye College of Commerce New Technical Resources DEGREE / CERTIFICATE Bachelors in Commerce Diploma Fire Fighting & Industrial Safety

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Dec 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

Inspection of all Safety Equipments such as PPE, safety Belts, Fire Extinguishers etc., to ensure the reliability. Evaluate the plan for work scheduling and preparation of materials, equipments & manpower. Check the operation of construction project and adopt counter measures if necessary. Prepare daily accomplishment reports. To attend everyday tool box meeting and weekly safety meeting with the workers about the safe work practice. To attend weekly project review meetings to discuss and explain how safety help progress. Conduct safety orientation to the workers and others as and when required. Daily inspection of scaffoldings. Auditing monthly color code, weekly scaffold tags and fire extinguisher tags. Weekly safety inspection joint with client and making deviation report and its corrective actions and remedial measures.

COMPANY:

AYTB (J.C.P) Jubail Chevron Philip Civil & Building, including Mechanical works

FROM:

Nov. 2007

TO:

Nov. 2008

POSITION: PROJECT:

Safety Officer

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· ·

To ensure proper perform and continuous monitoring at the plants site to ensure compliance of plant operations. Ensure proper maintenance, handling various safety equipment such as gas monitoring device, Breathing apparatus, oxygen detector, cable tracer, ground fault circuit interrupter.

Page 38 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · ·

Check the quality of products and adopt counter measure if necessary. Provide technical support for their improvement of product material. Prepare daily report of production. Daily liaison with consultants, client's safety department, on the permit to work system. Health & safety regulations and requirements. Conducting weekly tool-box meetings for supervisors & foreman. Educate the supervisors & workers to follow safe working practice. Gulf Engineering Co. (G.E.C) Safety Officer Khursaniah Gas Plant (Aramco Project) FROM: Dec. 2005 TO: Oct. 2007

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · ·

SKILLS

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Checking safety around Scaffolding works. Auditing monthly color code, weekly Scaffold tags and Fire Extinguisher Tags. Utilize as safety Officer and performs primarily managing over all site safety implementation clients approved safety requirements of the project. Involved in preparing and issuing Final Safety Report for the Project. Conduct safety orientation to worker and others. Daily inspection of heavy equipments check list. Inspecting the work site and taking suitable steps to eliminate all the unsafe working conditions and potential hazards and to maintain good housekeeping. Supervision and conducting investigation of accidents and incidents including near misses, determination of probable cause and enforcing preventive measures. Preparation of job safety analysis and hazard identification. Preparation of company accident statistics for management reports. Assess the situation to prevention of accidents

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 39 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Shaikh Shah Vali Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 6 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: Government College kadapa DEGREE / CERTIFICATE Bachelor of Science

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Jan 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

Inspection of all Safety Equipments such as PPE, safety Belts, Fire Extinguishers etc., to ensure the reliability. Evaluate the plan for work scheduling and preparation of materials, equipments & manpower. Check the operation of construction project and adopt counter measures if necessary. Prepare daily accomplishment reports. To attend everyday tool box meeting and weekly safety meeting with the workers about the safe work practice. To attend weekly project review meetings to discuss and explain how safety help progress. Conduct safety orientation to the workers and others as and when required. Daily inspection of scaffoldings. Auditing monthly color code, weekly scaffold tags and fire extinguisher tags. Weekly safety inspection joint with client and making deviation report and its corrective actions and remedial measures.

COMPANY: POSITION: PROJECT:

Huta Hagerfeld

FROM:

May. 2008

TO:

Nov. 2008

Marafiq IWPP Project

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · ·

Implementation of the rules and regulation of the Safety, Client and Company. Orientation for newly hired employees, researches studies for the improvement of safety in the project. Providing for continue education of employees by disseminating safety publication, instruction, rules, posters etc. Preparing and submitting inspection reports, investigation and studies causes and recommend corrective measures to decrease their frequency to prevent recurrences.

Page 40 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · ·

Attend Safety meetings every week, Tool Box talks on starting of every work. Daily liaison with consultants, client's safety department, on the permit to work system. Health & safety regulations and requirements. On excavation job site making sure installation of proper sign boards and barricades Conducting weekly tool-box meetings for supervisors & foreman. Checking fire Extinguisher and machine connections report incident / accident and unsafe condition. Educate the supervisors & workers to follow safe working practice. CCE (Contracting & Construction Enterprises) Safety Officer Khursaniah (KGP Project) Civil & Building, including Mechanical work FROM: Aug. 2006 TO: Apr. 2008

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · ·

SKILLS

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Checking safety around Scaffolding works. Auditing monthly color code, weekly Scaffold tags and Fire Extinguisher Tags. Attending daily walkthrough with the client to correct deficiencies and maintain the site from any potential hazards that can result in accident check that all groups participate in housekeeping. Involved in preparing and issuing Final Safety Report for the Project. Conduct safety orientation to worker and others. To work as a safety officer in coordination of safety records. Making sure of Barricades and Warning Lights provided at all exposed sides of the open trench. Supervision and conducting investigation of accidents and incidents including near misses, determination of probable cause and enforcing preventive measures. Responsible for all aspects of Safety, Health and Welfare on Site. Preparation of company accident statistics for management reports. Assess the situation to prevention of accidents

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 41 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Mohammed Abid Hussain Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 5 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: J.P. University Bihar Arbab Industrial Training Institute DEGREE / CERTIFICATE Bachelor of Science (Chemistry) Industrial Safety Management

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Feb 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · ·

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Participate in Safety Inspections and Safety Audits at all project areas of operation. Take necessary action to correct any unsafe acts of hazards of plant or systems. Manage the permit to work system and ensure compliance to the specified procedures. Perform Inspections on Fire Protection Equipment in all areas to ensure adequate protection is available. Monitor all Emergency Drills to ensure the exercises are carried out in accordance with scheduled Project Safety Plan. Prepare Personnel Accident Reports, Vehicle and Plant Reports, and Property Damage Reports, to ensure that all lost time are reported in accordance to client format and record. Investigate personnel injuries and other incidents and make recommendations for improvement to prevent recurrence. Conduct daily Safety inspection. Conduct weekly Safety meeting, and as and when required. When unsafe practices / conditions or any safety violations are detected, advise or direct the supervisor or foreman to correct them.

COMPANY: POSITION: PROJECT:

GDCL, Balco, Chattisgarh Safety Supervisor Power Plant Project Civil & Building, works

FROM:

March.2008

TO:

Jan. 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES:

·

Implementation of the rules and regulation of the Safety, Client and Company.

Page 42 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · ·

Orientation for newly hired employees, researches studies for the improvement of safety in the project. Preparing and submitting inspection reports, investigation and studies causes and recommend corrective measures to decrease their frequency to prevent recurrences. Attend Safety meetings every week, Tool Box talks on starting of every work. On excavation job site making sure installation of proper sign boards and barricades Checking fire Extinguisher and machine connections report incident / accident and unsafe condition. Educate the Civil Supervisors & workers to follow safe working practice. Larsen & Toubro, Jamshedpur Safety Officer Vishal Mega Mart Civil & Building works FROM: April. 2006 TO: Feb. 2008

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · ·

SKILLS

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Checking safety around Scaffolding works. Auditing monthly color code, weekly Scaffold tags and Fire Extinguisher Tags. Attending daily walkthrough with the client to correct deficiencies and maintain the site from any potential hazards that can result in accident check that all groups participate in housekeeping. Involved in preparing and issuing Final Safety Report for the Project. Conduct safety orientation to worker and others. To work as a safety officer in coordination of safety records. Making sure of Barricades and Warning Lights provided at all exposed sides of the open trench. Supervision and conducting investigation of accidents and incidents including near misses, determination of probable cause and enforcing preventive measures. Responsible for all aspects of Safety, Health and Welfare on Site. Preparation of company accident statistics for management reports. Assess the situation to prevention of accidents

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 43 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Mohammed Yousef Male Nurse NATIONALITY: YEARS WITH COMPANY: Indian 5 month

EDUCATION NAME OF INSTITUTION GRADUATE : UNDERGRADUATE: TECHNICAL: BIEC Patna Bihar Nursing Registration Council Intermediate in Science Diploma in Male Nursing DEGREE / CERTIFICATE

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Male Nurse FROM: Feb 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · ·

Coordinate with the Safety Supervisor / Manager, consult and advise him on any matters arising from the administration of his duties. Compile and maintain records of all persons treated for injury and provide all necessary information / documentation as required. Maintain the clinic in a good sanitary condition at all times. Maintain first aid supplies at clinics and request them when nearly runs out. Readily respond when medical emergency exist. Faiz Hospital Male Nurse FROM: Feb. 2003 TO: Jan. 2009

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · ·

Attending OPD Patients. Accidental Cases which comes in OPD attending them with first aid measure, in case of serious injury referring to Emergency Department. Serving medicine to patients according to Doctor's prescription. Maintaining stock for essential medicines. Attending in patients on a regular visit checking fever, Temperature, Blood Pressure, body weight & Pulse rate etc., Maintaining case sheet of every patient.

Page 44 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT: Siddiqui Hospital Male Nurse FROM: Jan. 1999 TO: Jan. 2003

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · ·

SKILLS

Performs procedures such as IV Placement and administering medications. Make a day to day nursing care plan for the patient. Carry out Doctor's orders and work harmoniously with the health team. Ensure Patient's views are taken into account in the decision making. Ensure that documentation is up to date and accurate. Safely administer prescribed medication and monitor effects.

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 45 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Syed Haider Abbas Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 5 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: H.N.B. Garhwal Universiry Arbab Industrial Training Institute DEGREE / CERTIFICATE Bachelor of Arts) Industrial Safety Management

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Feb 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

Conduct daily Safety Inspection. Conduct safety orientation for new employees. Participate in Safety Inspections and Safety Audits at all project areas of operation. Ensure that all safety information, particularly that relevant to potential accidents situations identified by other parties is distributed onsite and personnel are alerted to the risk recurrence. Manage the work permit system and ensure compliance to the specified procedures. Perform Inspections on Fire Protection Equipment in all areas to ensure adequate protection is available. Prepare Personnel Accident Reports, Vehicle and Plant Reports, and Property Damage Reports, to ensure that all lost time are reported in accordance to client format and record. When unsafe practices / conditions or any safety violations are detected, advise or direct the supervisor or foreman to correct them. Investigate personnel injuries and other incidents and make recommendations for improvement to prevent recurrence. Conduct weekly & monthly Safety tool box meetings. Alia Associates Engineers & Contractors Safety Officer Selaqui Hotel, Noida Civil & Building, works FROM: Feb. 2008 TO: Jan. 2009

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· ·

Implementation of the rules and regulation of the Safety, Client and Company. Orientation for newly hired employees, researches studies for the improvement of safety in the project.

Page 46 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · ·

Preparing and submitting inspection reports, investigation and studies causes and recommend corrective measures to decrease their frequency to prevent recurrences. Attend Safety meetings every week. Making sure installation of proper sign boards and barricades on excavation job site. Checking fire Extinguisher and machine connections report incident / accident and unsafe condition. Educate the Civil Supervisors & workers to practice safe working. ACECON Engineers Pvt. Ltd. Safety Officer Ajanta Tower ­ Noida Civil & Building works FROM: May. 2003 TO: Jan. 2008

COMPANY: POSITION: PROJECT:

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

SKILLS

Inspection of all safety equipments, such as P.P.E., Fire Extinguishers etc, to ensure their reliability. Checking safety around Scaffolding works. Attending daily walkthrough with the client to correct deficiencies and maintain the site from any potential hazards that can result in accident check that all groups participate in housekeeping. Conduct safety orientation to worker and others. To work as a safety officer in coordination of safety records. Making sure of Barricades and Warning Lights provided at all exposed sides of the open trench. Supervision and conducting investigation of accidents and incidents including near misses, determination of probable cause and enforcing preventive measures. Responsible for all aspects of Safety, Health and Welfare on Site. Preparation of company accident statistics for management reports. Assess the situation to prevention of accidents

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 47 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Mohammad Farid Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 3 month

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: The Oxford Polytechnic Rashtriya Technical Institute DEGREE / CERTIFICATE Diploma in Civil Engineering Diploma Industrial Safety

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Apr 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

Assist the Safety Supervisor / Manager and project team with implementation and administration of the Safety and Loss Prevention Program. Participate in Safety Inspections and Safety Audits at all project areas of operation. Ensure that all safety information, particularly that relevant to potential accidents situations identified by other parties is distributed onsite and personnel are alerted to the risk recurrence. Take necessary action to correct any unsafe acts of hazards of plant or systems. Follow the Work Permit Procedure and ensure compliance to the specified procedures. Monitor all Emergency Drills to ensure the exercises are carried out in accordance with scheduled Project Safety Plan. Prepare Accident reports, Vehicle and Property Damage reports in compliance with the system. Conduct daily Safety inspection. Conduct weekly Safety meeting as required. When unsafe practices / conditions or any safety violations are detected, advise or direct the supervisor or foreman to correct them.

COMPANY: POSITION: PROJECT:

Bihar Steel Safety Officer AGRICO Civil works

FROM:

Feb. 2008

TO:

Mar. 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· ·

Implementation of the rules and regulation of the Safety, Client and Company. Management Safety / Health & Environment System Creating effective procedure for the preparation and implementation of programs within the area of industrial safety.

Page 48 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · ·

Conducts safety audits & Risk Assessment; implementing Safety Management and formulating mutual aid scheme with neighboring industries. Selection, procurement and control of Personal Protection Equipment. Statutory Compliance Liaison with Government authorities (Factories, Pollution, Chief Controller Explosives, Director of Boilers, Director of Electric Safety). Adhering to statutory specifications and organizational standards for maintaining safe working environment inside the plant

during all routine and especially critical/ hazardous operations. Organizing safety committee meetings at department levels for safety audits non compliances, safety measures, action plan, monitoring. By involving Union Leaders for the functions of Safety Committee. COMPANY: POSITION: PROJECT: Haldia Petro Chemical and Oil Refinery. Bihar India Safety Engineer Civil, Structural, U/G Piping work for Offsite ­ II Civil & Building works FROM: May. 2003 TO: Jan. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · ·

SKILLS

Implementation of the health, safety and environment procedure. Manage and supervise the orientation, safety talk, specific crafts wise HSE training and PTW program of employees. Incident/ Accident investigation, reporting and follow up. Supervise all maintenance of fire detection and prevention system and equipment. Conduct the safety training for work force. Inspection of work sire through different checklist. Monitoring of crane operation and heavy lifts. Inspection fire fighting and fire alarm system. Incident reporting and investigation. Assess the situation to prevention of accidents

Computer Skills

·

Computer Literate

Professional Skills & Qualities

· ·

Self ­motivated and target oriented Ability to work in team

Page 49 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Mohammed Imran Khan Civil Inspector-QC Department NATIONALITY: YEARS WITH COMPANY: Indian 10 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: State Board of Technical Education DEGREE / CERTIFICATE Diploma in Civil Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh FROM: Aug 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · ·

Develop and formulate for management approval quality procedures, controls and qualifications standards for various trades and skills. Participate in the preparation of Quality Plan and Inspection & Test Plan (ITP) for the projects. Initiate action to prevent occurrence of any non-conformities relating to the construction works activities and quality systems. Determine the conformity and non-conformity of the quality system elements with specified requirements. Evaluate the supplier where within the framework of contractual relations, and verify that the supplier's quality system continues to meet specified requirement and is being implemented. Prepare forms for reporting quality inspections and observations, and checklist used for evaluating quality system elements. Establish and maintain documented procedures for inspection and testing activities in order to verify that the specified requirements for the construction are met. Inspect and test the job as required by the quality plan and / or documented procedures. Determine and hold every activity until the required inspected and test have been receive and verified. Carry-out all final inspection and testing in accordance with the quality plan / or documented procedures to complete the evidence of conformance of the finished activities to the specified project requirements. Establish and maintain documented procedures to control calibrate and maintain inspection, measuring and test equipment. Ensure that inspection, measuring and test equipment are consistent with the required measurement capability.

· ·

Establish and maintain documented procedures for implementing corrective and preventive action to eliminate the causes of potential nonconformities. Establish and maintain documented procedures for identification, collection, indexing, access, filling, storage, maintenance and disposition of quality records.

Page 50 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · ·

Provide training for all personnel performing activities affecting quality. Evaluate personnel performing specific assigned tasks shall be qualified on the basis of appropriate education and experience. Inspect the construction project worksites at daily basis and prepared reports and correct unsafe work methods and actual conditions. Prepare documented procedures consistent with the project's requirements and effectively implement the quality system and its documented procedures.

COMPANY: POSITION: PROJECT:

United YA Constructions Site Engineer

FROM:

Apr 2006

TO:

Jun 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · Assist the project engineer in the overall preparation of project feasibility study Supervised the actual work and monitor the quality of labor man-hours. Prepare cost estimates, work schedules and shop drawings. Attend job explanation meeting and site visit for bidding. Coordinate with the design / consulting engineers and other disciplines engineers all construction activities. Implement quality controls inspection on all fabrication and erection of overhead steel tanks including installation associated pipe spools and laying of piping for water works projects. Coordinate quality inspection and testing with independent laboratories. Monitor progress of construction works, prepare reports and maintain records.

SKILLS Computer Skills

· ·

Certified Course Completed in Computer Added Drafting (Auto CAD). Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc.

Professional Skills & Qualities

·

Ability to work in team

Page 51 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Bienvenido C. Flores Jr. QA/QC - Civil Inspector NATIONALITY: YEARS WITH COMPANY: Filipino 6 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Cagayan de Oro College Carmen DEGREE / CERTIFICATE B.S. in Civil Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Civil Inspector ­ QC Department FROM: Jan 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · · · · ·

Construction of buildings such as Warehouses,Protection Wall,Retaining Wall,Roads,Drainage Sewage & pipe lines. Estimating the project cost according to the Design Plan. Preparation of RFI (Request for Inspection ) for each and every work and getting Approved from client. Preparing data and Estimates for the given work Preparing work Daily Activities and also procuring quantities required for work. Investigating and correct the actual sizes of excavation work required for the Structure Maintaining the size of Plan cement concrete as given after excavation. Maintaining the water level of concrete structures in the curing period. Execution of site Inspection Plan. Study the structure plan and preparing the work plan. Checking the materials Specification according to the standards given in the plan. Doing the slump test for the consistency of the concrete. Preparing progress report.

COMPANY: POSITION: PROJECT:

Marubeni Saudi Arabia Company (MASACO) Site Engineer

FROM:

Aug. 2007

TO:

Nov. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Construction of buildings such as Warehouses,Protection Wall,Retaining Wall,Roads,Drainage

Page 52 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · · · · · · · · · · Sewage & pipe lines. Estimating the project cost according to the Design Plan. Preparation of RFI (Request for Inspection ) for each and every work and getting Approved from client. Preparing data and Estimates for the given work Preparing work Daily Activities and also procuring quantities required for work. Investigating and correct the actual sizes of excavation work required for the Structure Maintaining the size of Plan cement concrete as given after excavation. Maintaining the water level of concrete structures in the curing period. Execution of site Inspection Plan. Study the structure plan and preparing the work plan. Checking the materials Specification according to the standards given in the plan. Doing the slump test for the consistency of the concrete. Preparing progress report.

COMPANY: POSITION: PROJECT:

EFM Enterprises Philippines Project Engineer

FROM:

May. 1997

TO:

Jun. 2007

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · Construction of industrial buildings like sub-stations, Control rooms, Commercial buildings. Making Schedule for RFI. Making monitoring schedule progressing every day. Estimation for different types of project. Making the bar chart for different activities. Preparation of inspection request RFI. Planning of activities.

SKILLS Computer Skills · Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc.

Professional Skills & Qualities

·

Ability to work in team

Page 53 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Frederick P. Ambida Civil Inspector-QC Department NATIONALITY: YEARS WITH COMPANY: Philippino 1 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: University of Northern Philippines DEGREE / CERTIFICATE B.S. in Civil Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Civil Inspector ­ QC Department FROM: Jun 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · Performed Test and Inspections according to Inspection and Test Plan (ITP) Conducts survey checks regarding coordinates and elevations on top of formworks and bolts using approved Benchmark monuments before and after concreting Monitors during concreting on the Slump test, Concrete Temperature, Air Content Test, taking of samples and the height of the concrete placement hose should not be more than 1 meter during placing. Checks on the allowable clearances, orientations according to UTM, alignment, numbers and distances of re-bars, damaged coating on the FBE should be repaired, and the rigidity of forms prior to concreting. Checks on Moisture Content Test prior to application of Bitumen paints on all foundations Monitors the curing of concrete structures to attain the standard of at least 7 days of curing period Performed inspection on the thickness of bitumen paint by Dry Film using Elco meter Inspection for the rigidity of forms, checking the standard clearances and reinforcement works for foundations, its spacing, numbers, damaged coating should be repaired prior to form closure and concreting Thickness Method and Wet Film Method,

COMPANY: POSITION: PROJECT:

Hanwha Engineering & Construction Co. QC Civil Inspector Ma'aden Phosphate Power & Desalination Project

FROM:

Nov. 2008

TO:

May 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · Performed Test and Inspections according to Inspection and Test Plan (ITP). Performed Test and Inspection on the installation of HDPE Liners at Process and Desalinated Water Storage Tanks; Air Pressure Test for Double Hot-Wedge Seams, Spark Test for Extrusion Welded Seams on walls and pipes and Vacuum Test for Extrusion Welded Seams on the toe slopes at walls. · Witness the taking of Field Density Test (FDT), Plate Bearing Test (PBT) and Rebounding Test.

Page 54 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · · · Conducts survey checks regarding coordinates and elevations on top of formworks and bolts using approved Benchmark monuments before and after concreting. Monitors during concreting on the Slump test, Concrete Temperature, Air Content Test, taking of samples and the height of the concrete placement hose should not be more than 1 meter during placing. Checks on the allowable clearances, orientations according to UTM, alignment and distances of re-bars, damaged coating on the FBE should be repaired, and the rigidity of forms prior to concreting. Checks on Moisture Content Test prior to application of Bitumen paints. Monitors the curing of concrete structures to attain the standard of at least 7 days of curing period. Performed inspection on the thickness of bitumen paint by Dry Film Thickness Method and Wet Film Method, using Elcho meter Inspection for the rigidity of forms, checking the standard clearances and reinforcement works for foundations, its spacing, numbers, and damaged coating should be repaired prior to form closure and concreting.

COMPANY: POSITION: PROJECT:

Al Khodari & Sons Inc. QC Civil Inspector

FROM:

July. 2008

TO:

Oct. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Inspection for the rigidity of forms, checking the standard clearances and reinforcement works for footings, its spacing, numbers, damaged coating should be repaired and foundations prior to concrete, based on Saudi Aramco Inspection Checklist (SAIC). · Monitoring the concreting operations, taking of concrete temperature, slump test, taking of cylindrical samples, the height of placement hose during the placing of concrete and also ensure that enough number of vibrators is used for concrete works, as per Saudi Aramco Inspection Checklist (SAIC). · Prepared documents for "Purchase Requisition Packages" for inspectables and non-inspectable materials for the civil project, as per requirement based on Saudi Aramco Quality Procurement Process (Schedule Q), Saudi Aramco Engineering Requirements (SAER-1972) and the provided CCC and 9Com list for accredited Aramco vendors. · Prepared documents for "Bill-of-Quantity" and its estimations based on the bill-of-quantity (as per material take-off list) and "Bill-of-Quantity" as per 90% of IFC drawings.

COMPANY: POSITION: PROJECT:

Masaco Qassim Cement Company QC Civil Inspector

FROM:

Sep. 2007

TO:

Jun. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · Inspection of Forms and Reinforcement works for footings, foundations, concrete pipe encasement (for Hub-type PVC), manholes and U-ditches for drainage system, prior to concrete pouring and checking the standard clearance. Inspection of concrete casting, reinforcing steel bars, concrete pouring and curing, concrete cylinder sampling, checking of concrete temperature and slump test and to ensure that activities are in compliance with the sets of standards.

Page 55 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· Monitors the civil construction and conducts QC checks on the civil works of the drainage system and made sure that the coordinates on the plan/design is properly laid-out on the ground and the elevations or slopes of the pipes (steel and PVC) and ditches are on its design survey levels. · · · · · Prepares "Request for Inspection" (RFI) of these systems prior to any concreting. Monitors the curing of concrete structures to attain the standard of at least 7 days of curing period. Monitors and checks in the civil works operations of concrete jacketing for column structures, slope protections and grading/leveling. Checks on the proper applications of, anti-corrosive paints on structural steel members and lock capsules for anchor bolts or re-bars used in concrete jacketing. Experience in Quality Control works and Quality assurance those products and supplies companies with the relevant standards that exit in the execution of the project.

COMPANY: POSITION: PROJECT:

PFS Constructions & General Services Inc. QC Civil Inspector

FROM:

May. 1996

TO:

Aug. 2007

BRIEF DESCRIPTION OF RESPONSIBILITIES: · Monitor and conducts quality control checks on the civil construction operations involved in the formworks, fixing of re-bars, the placing orientation, repair, protective coating of concrete and curing are carried out in accordance with the project plans and specifications. · · · · · · · Monitor and inspect for Quality Control the setting of reinforcements for structural members and must be free from oil or any injurious materials before concreting works. Checking fittings and other accessories to be embedded in the concrete to ensure that the installation are in proper orientation elevations and dimensions in accordance with the standards and specifications of the project. Slump testing and time limitations of concrete mixtures. Supervise concrete cylindrical specimen. Inform and coordinate to the Retail Engineering for inspection of structural reinforcements including proper placement of fittings/accessories before concrete pouring. Monitor during concreting; dropping of concrete by pump from steel pipes, conveying of concrete, tamping and spading on to some congested areas, all to avoid segregation of aggregates. Responsible for the coordination for Mobilization/Demobilization, of heavy equipments from forwarders, needed for a project. Conducts Quality Control checks on the civil works/mechanical plans of Under-Ground Tanks (UGT), Over-Head Tanks (OHT) and its piping lines of Petroleum products for Retail and/or commercial projects; Supervise and checks the lay-out/installation of UGT's, checks elevation, inclination and tank hydro-testing before setting to its final position, provision of dead man and filling of sweet sand. Supervise and checks the installation of Over-Head Tanks (OHT) for petroleum products mounted on steel skids or on a concrete pedestal, individual or on series. Supervise and checks in the supply/on-site fabrication for the installation of pipelines for UGT and OHT (e.g. suction/discharge, remote fill, vent, etc.), its direction, elevation and hydro-testing prior to the filling of sweet sand.

Page 56 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · Handled and monitored daily activities of on-going projects and schedules of construction materials and requirements needed for a project in coordination with site foreman/lead-man. Manages Occupational Health and Safety practices among employees/workers and ensured that activities posed no health or safety hazards to employees/ workers and to the surrounding community and of the environment. Conduct HSE orientation/induction to the new workers prior to assignment in any job site.

SKILLS Computer Skills · Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc.

Professional Skills & Qualities

·

Ability to work in team

Page 57 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Paulo Bernal Nunag QA/QC - Civil Inspector NATIONALITY: YEARS WITH COMPANY: Filipino 4 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: University of Assumption DEGREE / CERTIFICATE B.S. in Civil Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Civil Inspector ­ QC Department AAC-Ethylene Amines Project - Jubail FROM: Mar 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · · · · · · · ·

Estimating the project cost according to the Design Plan. Preparation of RFI (Request for Inspection ) for each and every work and getting Approved from client. Preparing data and Estimates for the given work Preparing work Daily Activities and also procuring quantities required for work. Investigating and correct the actual sizer of excavation work required for the Structure Maintaining the size of Plan cement concrete as given after excavation. Maintaining the water level of concrete structures in the curing period. Execution of site Inspection Plan. Study the structure plan and preparing the work plan. Checking the materials Specification according to the standards given in the plan. Doing the slump test for the consistency of the concrete. Preparing progress report.

COMPANY: POSITION: PROJECT:

Gama Industry Arabia Limited Civil QA/QC & Civil Supervisor Ma'aden Phosphate Project

FROM:

Feb. 2008

TO:

Jan. 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · In-charge in technical supervision on site such as rebar works, for vertical and horizontal structure. Coordination and monitoring of all works on my designate area. Complied for the execution of works under the approved plans and specification.

Page 58 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · · Prepare (RFI) for the inspection of works and immediately response to all deficiency finding by Quality personnel to meet the project requirement and project schedule. Prepared everyday schedule of works and three (3) weeks look-ahead schedule Plan. Prepared materials take-off/Quantity take-off on the required project schedule. Monitoring, surveillance and pushing the works of site to meet the project schedule. Inspection of rebar, formworks, embedded items on every specific work area prior for final inspection of the client. Inspection of all the materials delivered per approved submittal of the client on area of work prior to install.

COMPANY: POSITION: PROJECT:

Gama Industry Arabia Limited Chief Surveyor / Civil Supervisor NATPET OSBL Project

FROM:

Feb. 2007

TO:

Jan. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · In-charge in technical supervision, coordination and monitoring of works. Ensures that all execution of works shall comply with the approved plans and Specification. Responsible in the Supervision and Documentation for the project, Supervision and responsible on installation reinforcement bars and formworks base on the plans; Responsible also on placement of massive concrete activities. Implemented survey Alignment checking of steel structure per survey checklist required. Measuring and checking of position of embedded plate for the structure as maintained the quality of works. Prepare weekly and monthly report accomplishment works to construction manager as project progress. Coordinate day-by-day to the Construction Manger & QA/QC Manager, before executing the work for some revise drawing and daily meeting. Rectified all deficiencies of the punch list item prior for final hand-over and commissioning.

COMPANY: POSITION: PROJECT:

Ali H. Al Ghamdi Est. Chief Surveyor / Civil Supervisor Aramco Refinery Marine Project (Jeddah)

FROM:

Nov. 1997

TO:

Dec. 2006

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · In-charge in the technical supervision, site coordination and monitoring of work activities. Construction & maintenance of drainage & manholes system. Restoration of the side walks incl. inlets curbs and gutters. Prepared monthly quantity take-off of materials need on the site. Inspection of finished works for daily accomplishment reports. Reporting all progress by daily, weekly and monthly to the construction manager.

COMPANY: POSITION: PROJECT:

Asia Vertic Construction Inc. Chief Surveyor / Civil Supervisor Henley Resources Corporation

FROM:

Nov. 1993

TO:

Aug. 1996

Page 59 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · Reporting to the Project Manager In-charge in the coordination of the Project Architects / Designer, regarding the approval of all construction plan and specification, Shop Drawing and As-built plans for the project. In-charge in the technical supervision, site coordination and monitoring of sub-contractors activities such as plumbing, electrical, paintings and other finishing works. Ensure that all accomplishment works shall comply with the approval plans, Methodology and Materials. Responsible in the Supervision and Documentation for the project Supervision and responsible on installation reinforcement bars and formworks base on the plans; Responsible also on placement of massive concrete activities on vertical construction. Prepare daily, weekly and monthly accomplishment report. Coordinate from time to time to the field operation manager and project inspector and implemented given instructions. Estimate the materials needed to the project.

SKILLS Computer Skills · Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc.

Professional Skills & Qualities

·

Ability to work in team

Page 60 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Bienvenido Salonga Civil Supervisor NATIONALITY: YEARS WITH COMPANY: Filipino 10 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Nueva Ecija University DEGREE / CERTIFICATE B.S. in Civil Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Civil Inspector ­ QC Department FROM: Aug 2008 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· ·

Assigned in project site as Civil supervisor, regulating structural & architectural design and specification Prepares work schedule, rebar bending & cutting schedule for the specified assigned work location.

COMPANY: POSITION: PROJECT:

PNEX Constructions & Steel Works Project Engineer / Estimator / CAD Operator

FROM:

Jan. 2005

TO:

Aug. 2008

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · Assigned in project sites as site engineer, regulating structural & architectural design and specifications. Prepares cost estimates/quotation and proposals for project bidding. Prepares details and shop drawing with AutoCAD for the understanding of workers. Prepares Structural design and analysis for medium rise residential/commercial building

COMPANY: POSITION: PROJECT:

James C. Lim Associates Project Engineer

FROM:

Sep. 2003

TO:

Jan. 2005

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Assigned in building (medium rise) construction management regulating the contractor's working procedures and standards Conduct inspections and material testing Reviews and prepares recommendation for approval documents related to project administration Carries out function of Project Inspector for distribution projects especially for project transactions. Provides analytical support for plans and specifications as required by the owner

Page 61 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SKILLS Computer Skills

· ·

Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc. Certified AUTOCAD 2002 Level 1&2 from Crescent Technologies Institute, Sampaloc Manila, Phil. (May 2004).

Professional Skills & Qualities

·

Ability to work in team

Page 62 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Michael L. Santiago Material Controller NATIONALITY: YEARS WITH COMPANY: Filipino 4 months

EDUCATION NAME OF INSTITUTION UNDERGRADUATE: TECHNICAL: Holy Angel University DEGREE / CERTIFICATE B.S. Business Administration

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Material Controller FROM: Mar 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · · Responsible on material inventory & material controlling. Responsible in counterchecking incoming materials from different suppliers using the delivery receipts prior receiving and storage Do all Material Requisition preparation for all material requirements. Responsible on monthly inventory report & variance report on all materials to be submitted to Material Manager. Responsible on monitoring daily activities of storeroom prior on the Inventory, Issuance & Withdrawals of materials. In charge to monitor the daily activities of the Storekeepers. To ensure that no materials shortage. To ensure that all materials are delivered on time based on the Material Requisition request. Responsible for physical inventory.

COMPANY: POSITION: PROJECT:

Amertron Global Planner / Purchaser

FROM:

Oct. 2006

TO:

Feb. 2009

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Responsible in the procurement of Indirect & Direct Materials, Packaging materials (e.g. labels) and ESD materials. Received and review all Purchase Requisition (PR) and coordinate with end-users the required specification prior generating final purchase request. Source out and selects best suppliers obtaining quality materials as required in the approved PR with good pricing payment term, delivery & services. Secure at least quotations from different vendors included in the Approved Vendors List Negotiates intelligently with suppliers on materials requirements the best possible deal for the best interest of the company.

Page 63 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · · · · · · · · · · · · · · · · · · Provide superiors on the status of the negotiation stating the decrease/increase in prices, materials on stocks (e.g. shortages, etc...) & standing of the suppliers. Prepare Purchase Order and award to selected supplier/s Ensure to meet the deadlines & objectives set & agreed with superior. Recommend ways on how to reduce cost of materials being purchased. Formulates feedback mechanism to requisitioners on materials being requested. Prepares PR/PO weekly status report & furnish copies to end-users. Reacts pro-actively on requisitioner's requirement during urgent situations. Must be able to meet deadlines & targets on the prescribed PR/PO cycle time local-4days & foreign- 5 days. Coordinates with Receiving on the daily receipts of materials. Prepares Vendor Qualification Request form for new materials to undergo qualification & evaluation. Coordinates with IQC for any reject materials & coordinates replacement of such with the concerned vendor. Generates Vendor Rating on a monthly basis. Updates List of Qualified Vendors on a monthly basis or it needs arise. Ensure quality of work to the satisfaction of customers (internal & external). Ensures that vendors are being paid on a timely fashion. Oversees stores operation from receiving up to issuance of materials to end-user. Responsible for Material Planning/Analysis of Turnkey & IC direct materials. Oversees continuity of supplier at any given period. In charge of generation of reports for corporate & customer inventory report. Ensure all material requirement of production is based on the monthly forecast given by the customer to avoid big inventory in store or material shortage in production line. Responsible to ensure all materials are delivered on time. Follow up with vendors on delay & delinquent deliveries.

COMPANY: POSITION: PROJECT:

Amertron Global Material Controller

FROM:

Sep. 2001

TO:

Sep. 2006

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · · · · Responsible for Material Planning/Analysis of SMT. Do all purchase request preparation SMT Direct and Indirect Materials. Responsible of monthly inventory report of OPTO Wafers & variance report and materials inventory to be submitted to Finance Department. Responsible to upload data in Oracle System. To ensure that no materials shortage. In charge in the whole operation of the MC in the absence of Department Head. To ensure that all materials are delivered on time. Responsible for physical inventory monthly/year end.

Page 64 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

COMPANY: POSITION: PROJECT:

International Wiring System IWS. Material Receiver

FROM:

Nov. 1999

TO:

Aug. 2001

BRIEF DESCRIPTION OF RESPONSIBILITIES: · · · · · Responsible in counterchecking incoming materials from different suppliers using the delivery receipts prior receiving and storage Assist in the conduct of inventory to assess fast and slow moving stocks Assist in the issuance of materials to all requisitioning departments Make daily/weekly reports on the delivery versus issuance and submit to superior Receive calls and entertain inquiries in relation to materials ordered

SKILLS Computer Skills · Conversant with MS office, Windows XP, Windows 2000, Windows 98, etc.

Professional Skills & Qualities

·

Ability to work in team

Page 65 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PERSONAL INFORMATION NAME: JOB TITLE: Younus Tondiyil Safety Officer NATIONALITY: YEARS WITH COMPANY: Indian 3 month

EDUCATION NAME OF INSTITUTION SECONDARY : TECHNICAL: Board of Higher Secondary NIFE DEGREE / CERTIFICATE Higher Secondary Diploma in Fire & Safety Engineering

WORK EXPERIENCE COMPANY: POSITION: PROJECT: Abdullah Al-Shaikh Safety Officer FROM: Apr 2009 TO: Till Date

BRIEF DESCRIPTION OF RESPONSIBILITIES:

· · · · · · ·

Assist the Safety Supervisor / Manager and project team with implementation and administration of the Safety and Loss Prevention Program. Participate in Safety Inspections and Safety Audits at all project areas of operation. Ensure that all safety information, particularly that relevant to potential accidents situations identified by other parties is distributed onsite and personnel are alerted to the risk recurrence. Manage the permit to work system and ensure compliance to the specified procedures. Conduct daily Safety inspection. Conduct weekly Safety meeting as required. When unsafe practices / conditions or any safety violations are detected, advise or direct the supervisor or foreman to correct them.

SKILLS Professional Skills & Qualities

·

Ability to work in team.

Page 66 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION III PROJECT REFERENCES

Page 67 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

3.1 HEAVY INDUSTRIAL PLANT PROJECT

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE : : : : : Ma'aden Phosphate Power & Desalination Plant Raz Al Zawr April, 2009 ­ Feb, 2010 (In Progress) Hanwha Saudi Contracting LTD. &Ma'aden SAR 56,062,500.00

Page 68 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

DESCRIPTION

:

Concrete Works, Civil, and Building for steam turbine structure and equipment foundations, control building, substation, switchgear, chemical storage tanks, air compressor shelter, and misc shelter including corresponding finishing work. In addition structure foundation for pipe rack, tanks, equipments, desalination plant.

Page 69 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE : : : : : Arabian Amine Company ­ Ethylene Amine Project Jubail April, 2009 ­ Sept, 2009 (In Progress) Hanwha Saudi Contracting LTD. &Ma'aden SAR 13,605,000.00

DESCRIPTION

:

Concrete Works, Civil, and Building Structure. Building consists of MCC Building, DCS Building, Maintenance Building, Control & Lab Building, Drumming Building & other equipment shelters.

Page 70 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE : : : : : 115 KVA Transmission Line Shaybah Sept, 2006 ­ Dec, 2007 Completed Energy Power Company (ARAMCO) SAR 11,930,000.00

DESCRIPTION

:

Concrete Works and Construction of 43 O.H.T. Concrete Tower Foundations, Buildings for Substation, Blackout start generator building, GIS building. In addition, other concrete foundations and structural and finishing works including supervision of Access road & concrete tower pad, earth work and piling works. (The total effected amount including materials: 20,300,000.00 SAR)

Page 71 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION : Standby Generator at Juaymah Barge Port, KFIA IPSA #3 & IPSA #4 : Juaymah : Feb, 2005 ­ Jul, 2006 Completed : Saudi ARAMCO : SAR 1,800,000.00 : Concrete Works related to construction of Generator Building and associated Electrical works including supply & installation of Generator, ATS, MTS, Fire Alarm System, Supply& Installation of diesel tank and piping works. : Upgrade Contractor Transportation Facilities : Dhahran : Jun, 2005 ­ May, 2006 Completed : Saudi ARAMCO : SAR 1,450,000.00 : Concrete Foundation work for construction of Pre-engineered Building. Associated Electrical works including with wall mounted transformer, fire alarm system, supply & installation of storage used oil tank and piping works and Supply & installation of HVAC works.

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: North Riyadh Bulk Plant ­ Expansion Project : Riyadh : Jun, 2005 ­ May, 2006 Completed : Saudi ARAMCO : SAR 2,950,000.00 : Concrete foundation work for 2 tanks, Concrete Dike Wall, Concrete Channels Culverts including earth works for site preparation.

Page 72 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Qassim Bulk Plant ­ Expansion Project : Qassim : Dec, 2004 ­ Dec, 2005 Completed : Saudi ARAMCO : SAR 2,600,000.00 : Concrete Foundation Work for 6 tanks, Dike Wall, Concrete Channels Culverts including earth works for site preparation.

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Visitor Center Building at Gate #20 : Rastanura : Nov, 2004 ­ Feb, 2005 Completed : Saudi ARAMCO : SAR 325,000.00 : Concrete Foundation Work for construction of Pre-engineered Building and associated Electrical works including with wall mounted transformer, fire alarm system, supply & installation of storage used oil tank and piping works and Supply & installation of HVAC works.

Page 73 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

3.2 CIVIL, BUILDING, AND ARCHITECTURAL PROJECTS

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION : Infra Civil Works for Temporary Camp Facilities : Ma'adenRazAzZawr : Apr, 2008 ­ Sept, 2008 Completed : Ssangyong Engineering & Construction company LTD. : SAR 11,000,000.00 : Concrete foundation work and Construction of temporary camp facilities - infra civil & utilities works such as power supply, water, sewer lines, telecommunication cable and installation, as complete facilities, including roads, fence works and portable buildings.

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Infra Civil Works for Temporary Camp Facilities : Ma'adenRazAzZawr : Apr, 2008 ­ Sept, 2008 Completed : Samsung Engineering & Construction company LTD. : SAR 7,115,000.00 : Concrete foundation work and Construction of temporary camp facilities - infra civil & utilities works such as power supply, water, sewer lines, telecommunication cable and installation, as complete facilities, including roads, fence works and portable buildings.

Page 74 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE : : : : : Temporary Camp Facilities for IWPP Project Marafiq - Jubail Apr, 2008 ­ June, 2008 Completed SSsangyong Engineering & Construction company LTD. SAR 2,450,000.00

DESCRIPTION

:

Concrete foundation work and Construction of site office facilities - site office, lay down, work site office including portable building; infra utilities such as power supply, water, drainpipes, telecommunication cable and installation, as complete facilities.

Page 75 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE

: : : : :

Temporary Camp Facilities for IWPP Project Marafiq - Jubail Apr, 2008 ­ June, 2008 Completed Hyundai Heavy Industries SAR 7,800,000.00

DESCRIPTION

:

Concrete foundation work and Construction of site office facilities - site office, lay down, work site office including portable building; infra utilities such as power supply, water, drain pipes, telecommunication cable and installation, as complete facilities.

Page 76 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE : : : : : Temporary Camp Facilities for 115 KVA Transmission Line Shaybah Sep, 2006 ­ Nov, 2007 Completed Hyundai Heavy Industries (Saudi ARAMCO) SAR 12,545,000

DESCRIPTION

:

Concrete foundation work and Construction of camp facilities - 500 people, site office, lay down, work site including portable building, infra utilities such as power supply, water, drain pipes, telecommunication cable and installation, RO plant as complete facilities.

Page 77 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Eight Story Fully Furnished Suit / Hotel Project : Al Khobar : Dec, 2005 ­ Jul, 2006 Completed : Al Shaikh Group : SAR 7,500,000.00 : Concrete foundation work and Construction of building structure, finishing including associated electrical, telecommunication, and plumbing, HVAC works.

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: 10 Villas Project : Aziziah : Jun, 2005 ­ Mar, 2006 Completed : Al Shaikh Group : SAR 4,800,000.00 : Concrete foundation work and Construction of building structure, finishing including associated electrical, telecommunication, plumbing, and HVAC works. The project included site utilities such as drainage system, water supply line, fire hydrant system, swimming pool, and pavement both asphalt and inter-locking tiles as well as landscaping and irrigation line.

Page 78 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Al Shaikh Commercial Center Project : Al Khobar : Aug, 2004 ­ Oct, 2005 Completed : Al Shaikh Group : SAR 4,200,000.00 : Concrete foundation work and Construction of building structure, finishing including associated electrical, telecommunication, plumbing, and HVAC works. The project included site utilities such as drainage system, water supply line, fire hydrant system, swimming pool, and pavement both asphalt and inter-locking tiles as well as landscaping and irrigation line.

PROJECT TITLE LOCATION PERIOD CLIENT PROJECT VALUE DESCRIPTION

: Aziziah Ceremony Hall Project : Aziziah : Mar, 2004 ­ Apr, 2005 Completed : Al Shaikh Group : SAR 7,210,000.00 : Concrete foundation work and Construction of building structure, finishing including associated electrical, telecommunication, plumbing, and HVAC works. The project included site utilities such as drainage system, water supply line, fire hydrant system, swimming pool, and pavement both asphalt and inter-locking tiles as well as landscaping and irrigation line.

Page 79 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION IV TECHNICAL POLICIES, PROCEDURES, AND PLANS

Page 80 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

4.1 PROJECT EXECUTION & MANAGEMENT STATEMENT

4.1.1 Project Management Plan

A Project Management Plan (PMP) describes the project management/leadership team/management committee's vision for how the project will be managed and organized and to clearly communicate the Client's objectives, project strategy, philosophy, management policy and contract requirements. A written PMP will be prepared and used on all major projects. The PMP will be one of the first documents prepared by the Alfa Al-Khaleej Est. Project Manager and project management team.

4.1.2 Project Execution Plan

The Project Execution Plan (PEP) identifies how the required activities for each portion of the work is to be executed based on the philosophies and strategies identified in the Project Management Plan. The PEP is a dynamic document which is revised, as necessary, to reflect the continuing progress of the project. Upon its initial development, the plan is submitted to the Client for comment and approval. Subsequent revisions are performed with Client approval.

4.1.3 Project Execution Manual Procedures

Project Execution Manual (PEM) procedures specifically define the development, checking, approval and control of design, engineering, procurement and construction management activities. These procedures also control the performance of formal design reviews. Each procedure addresses a single topic and clearly defines the responsibilities of the personnel involved, the general requirements of the procedure, any specific sequential process associated with the execution of the procedure, and the quality records generated as a result. Specific procedures within the engineering

Page 81 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

section address Design Calculations, Inner-discipline Drawing Checking, Squad Checking, Design/Safety Review, Project Design Data Control, and Vendor Data Requirements Review. These documents serve to address many of the key design control elements of the Alfa Al-Khaleej Est. Quality Management System. PEM's are referenced in the applicable sections of the PEP.

4.2 QUALITY ASSURANCE STATEMENT

Alfa Al-Khaleej Est. is committed to the pursuit of excellence in our day-to-day operations and the execution of our projects to satisfy customer requirements. We promote continual improvement of the effectiveness of our management system and strive to exceed customer expectations. Internal and external requirements will be clearly defined and communicated to everyone. We will organize, plan, and execute our day-to-day operations and our projects to conform to the requirements the first time.

4.2.1 General

Alfa Al-Khaleej Est. utilizes a formal Quality Management System that is focused on the identification, documentation and implementation of the design, engineering, procurement and construction management requirements of a project and satisfying the Client's requirements regarding the quality of the work. The Alfa Al-Khaleej Est. Quality Management System relies upon the use of Alfa Al-Khaleej Est. formal plans and procedures, and any Client specified project procedures, to define and control processes that have a direct effect on project quality. The purpose of the Alfa Al-Khaleej Est. Quality Management System is to provide a means of ensuring project activities conform to the design criteria, specifications, applicable industry codes and standards, and that the final product is safe, functional, reliable and cost effective.

Page 82 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR 4.2.2 Quality Assurance Plan

A Quality Assurance Plan is developed upon award as a part of the Project Execution Plan to define how Alfa Al-Khaleej Est. will assure commitment to Client project requirements. The Quality Assurance Plan includes a series of independent project audits that are scheduled to coincide with designated project milestones and scheduled activities. All audit activities are announced prior to the start of an audit and are performed according to Alfa Al-Khaleej Est. PEM procedures, with a formal report generated upon completion. This report is provided to the Client through the Alfa Al-Khaleej Est. Project Manager. Alfa Al-Khaleej Est. utilizes full-time quality professionals, known as Quality Assurance Engineers, to affect the quality assurance activities on applicable projects and to provide oversight of the continuous improvement process. The Quality Assurance Engineer is independent of the work with the authority to identify, document and solve quality-related issues. The Quality Assurance Engineer works closely with the project management and other team members to identify and resolve questions before any adverse effect occurs to the design, engineering, procurement or construction management activities.

Page 83 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

4.3 QUALITY ASSURANCE POLICY & PROCEDURE

4.3.1 PROJECT MANAGEMENT

Safety Prior to the start of any project, our Safety Engineer will meet with the Client and our Project Manager to discuss the scope of the job and establish the safety requirements for the various phases of this particular project. After the project begins our Safety Engineer will conduct safety inspections and continue to communicate with the Client as to the project's safety performance. Our project manager will carefully review with our Safety Engineer before attempting any operation that requires special or unusual safety precautions. Schedule As soon as possible afterward, our Project Manager will meet with the Client to discuss the starting date, starting area, sequence of events, and finish date of the project. After these items have been completely thought through and agreed upon, our Project Manager will immediately produce a schedule that satisfies and addresses the project time requirements. This schedule will also include a manpower loading chart and work completed milestone dates that can easily be tracked by both the Client and the Alfa Al-Khaleej Est. Management. Supervision Before any portion (including scheduling) of the project begins; Alfa Al-Khaleej Est. will assign a supervisor to the project and submit our choice to the Client for approval. A resume of this person's qualifications will be submitted if necessary. Once agreed upon, the Alfa Al-Khaleej Est. supervisor will have no other responsibility other than this project and will not be transferred without the express consent of the Owners. Quality Assurance The Client quality standards will be met in all cases. This will be facilitated by on-site QA/QC Engineer with the responsibility of tracking compliance to the Client's plans, specifications, and quality standards.

Page 84 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

Manpower and Resources Equipment and manpower of sufficient type and quantity will be dedicated to the project as dictated by the schedule and man loading chart. This equipment and manpower will remain available to meet the project schedule. Response Alfa Al-Khaleej Est. managers and supervisors are committed to immediately addressing requests from the Client. These requests could range from updated pricing on an anticipated scope change, to additional manpower and equipment to satisfy changing job site conditions or a request for alternate methods or material to minimize a subsequent schedule impact.

4.3.2 CONSTRUCTION MANPOWER

For Alfa Al-Khaleej Est. to reach its goal of a top quality construction project it must have top quality employees. In order to help insure quality construction manpower, employment with our firm is based upon the following: Ability to perform the work Employees must be competent to perform the work as directed in a work person like time and manner that conforms to the standards of the construction industry. Dependability Employees must report to work when and where directed, ready to go to work. Employees must adhere to all Alfa Al-Khaleej Est. Policies. Attitude Employees must have a positive attitude about themselves, their fellow employees, the work they are doing, and the company for which they work. Safety Employees must perform their work safely, adhering to all safety policies and wearing and using required safety equipment at all times.

Page 85 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

Construction manpower and their work performance are constantly being monitored according to the following guidelines to help assure a top quality construction project.

4.3.3 SUBCONTRACTOR

For Alfa Al-Khaleej Est. to reach its goal of a top quality construction project, it needs the cooperation of all subcontractors to perform the following: · · · · · · · · · · Verify that their completed work will comply with drawings and specifications. Attend the pre-construction conference. Strictly adhere to the schedule. Timely communicate any occurrence that would impact the schedule. Have a clear understanding of our chain of command and provide a list of responsible parties within their firm capable of making decisions. Timely processing of documents including submittals. Adhere to all safety policies and wear and use the required safety equipment at all times. Provide competent workers in sufficient numbers to complete the work as scheduled. Provide competent supervision for all phases of their work. Perform work only that has been given written approval.

4.3.4 MATERIAL SUPPLIER

For Alfa Al-Khaleej Est. to reach its goal of a top quality construction project, it needs the cooperation of all Material Suppliers to provide the following: · Materials supplied must be as specified.

Page 86 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

· · · · · · · Submittals and shop drawings proving compliance submitted in a timely manner. Delivery must be on time as directed and must have original delivery note. Return the signed acknowledgement copy of Alfa Al-Khaleej Est. purchase order in a timely manner. Field dimension check all pre-fabrication materials. Adhere to all safety policies at all times. Provide materials only on written authorization. Provide MSDS (Material Safety Data Sheets) on all delivered materials.

4.3.5 STAFF SUPPORT

The management of Alfa Al-Khaleej Est. realizes that in order for the company to complete construction projects of top quality this goal must permeate the organization. It is very important that the Safety Supervisor, Accounting Department, Engineering Department, Materials Department, and Site Office Staff work together in a spirit of communication and cooperation in direct support of the ongoing construction work in the field. Through the joint efforts of the entire Alfa Al-Khaleej Est. we can accomplish our goal of top quality construction projects.

Page 87 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

4.4 HEALTH & SAFETY STATEMENT

Alfa Al-Khaleej Est. recognizes its responsibilities under the Health and Safety Law of Kingdom of Saudi Arabia conjunction with Client's Health & Safety Requirements, to ensure that its operations are executed at all times in such a way as to ensure, as far as it is reasonably practicable, the health, safety and welfare of all persons likely to be affected, including employees, sub-contractors, visitors to site and members of the public. Alfa Al-Khaleej Est. is committed to continual improvement of the health and safety management system

4.5 HEALTH & SAFETY POLICY & PROCEDURE

In line with these responsibilities, Alfa Al-Khaleej Est. aims to provide, as far as is reasonably practicable: a. a safe and healthy working environment for all its employees, the carrying out of risk analyses and the identification of hazards; b. systems of work which are safe and without risks to health; c. general training in health and safety so that all employees are made aware of any potential hazards in relation to their work, and the latest procedures for overcoming them; d. specific training in safe working procedures, the operation of plant and machinery and accident prevention; e. a system for conducting a regular review of the training needs of the workforce; f. the provision of regular refresher courses, with reference to training already carried out; g. basic training in health and safety to new employees and young workers, and to ensure that whenever new plant or variations in systems of work are introduced, then the appropriate safety training is given; h. personal protective clothing and equipment appropriate to the job in hand; i. guidance on what to do in the event of an emergency; j. on-site welfare and first-aid provision which complies fully with the statutory requirements together with a system for maintaining the equipment; k. adequate firefighting equipment and fire training, in liaison with the fire authority; l. a means of contact with the relevant health and safety bodies so that up-to-date information on legislation, codes of practice and other technical guidance is available within the company, and is circulated promptly to all concerned. In the REFERENCE SECTION of this Pre Qualification Document, Alfa Al-Khaleej Est Health and Safety Program is included. We have committed extensive time and effort to develop this program to ensure Safe working environment for all work we do and for all employees.

Page 88 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION V CERTIFICATE DOCUMENTATION

Page 89 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

Page 90 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

Page 91 of 92

ALFA AL-KHALEEJ EST. GENERAL CONTRACTOR

SECTION VI REFERENCE DOCUMENTS

Page 92 of 92

Information

93 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

1010910


You might also be interested in

BETA