Read Abdullah Al-Nemshan Contracting Center text version

ABDULLAH AL-NEMSHAN CONTRACTING CENTER

CONSTRUCTION DIVISION

SABIC VENDOR # 502542

P.O. BOX # 1022, Jubail-31951 KSA TEL E-Mail URL 03 367 1181 [email protected] http://www.alnemshan.com

TABLE OF CONTENTS

010203040506070809Introduction Contact Info Services We Provide Work Completed Work in Progress Organization Manpower List Equipment / Facility Other Docs. C.R/ CV's etc.

2

1: BRIEF INTRODUCTION

ABDULLAH AL-NEMSHAN EST. HAS BEEN IN CONSTRUCTION BUSINESS FOR MORE THAN TWENTY YEARS IN EASTERN PROVINCE AND YANBU REGIONS OF KSA. OUR EST. HAS COMPLETED MANY CIVIL & MECHANICAL WORKS INCLUDING NEW CONSTRUCTION AND MAINTENANCE WORKS WITH SABIC AND RC JUBAIL / YANBU. IN OUR PROFILE WE HAVE TRIED TO GIVE YOU SOME BRIEF INTRODUCTION OF OUR COMPLETED AND ONGOING CONSTRUCTION/ MAINTENANCE WORKS AND OUR MANPOWER AND EQUIPMENT RESOURCES SO THAT YOU CAN EVALUATE OUR PRESENT CAPABILITY AND MAY CONSIDER OUR SERVICES AVAILABLE IN FUTURE .

FOLLOWING ARE THE AREAS WHERE WE CAN PROVIDE YOU OUR BEST SERVICES!

Civil/Mechanical/Electrical Plants

Maintenance Works Tower Fabrication & Erection

& Factories Overall Construction Fabrication & Erection Works & Technical Services

Electrical/Communication General

Engineering

3

3: Services:

3A :

DESIGN & FABRICATION OF

LIGHT STRUCTURE (CIRCULAR)

CIRCULAR PLATFORMS

Light Columns, Beams, Brackets, Bracings & Monorails Circular Frames Circular Handrails Straight Handrails Ladders With Hoops Tanks and Vessels Platforms

CIRCULAR LIGHT STRUCTURE CONFORMS TO THE FOLLOWING STANDARDS:

· · · · · · · · · ·

PROCESS INDUSTRY PRACTICE STF5535 PROCESS INDUSTRY PRACTICE STF5530 PROCESS INDUSTRY PRACTICE STF5520 SABIC ENGINEERING STANDARDS B04-F01 PROCESS INDUSTRY PRACTICE STF05501 SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 ANSI/NAAMM MBG531-00 ANSI/NAAMM MBG532-00 BSI BS 4592: PART 1:1995 OR AS PER CUSTOMERS' REQUIREMENTS

4

3B :

DESIGN & FABRICATION OF

LIGHT/MEDIUM & HEAVY STRUCTURE (STRAIGHT)

RECTANGULAR/STRAIGHT PLATFORM

Light Columns, Beams & Stringers Straight Handrails Ladders With Hoops Stair Treads

Tanks and Vessels Platforms

RECTANGULAR LIGHT, MEDIUM & HEAVY STRUCTURE CONFORMS TO THE FOLLOWING STANDARDS:

· · · · · · · · · ·

PROCESS INDUSTRY PRACTICE STF05535 PROCESS INDUSTRY PRACTICE STF05530 PROCESS INDUSTRY PRACTICE STF05520 SABIC ENGINEERING STANDARDS B04-F01

PROCESS INDUSTRY PRACTICE STF05501

SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 ANSI/NAAMM MBG531-00 ANSI/NAAMM MBG532-00 BSI BS 4592: PART 1:1995 OR AS PER CUSTOMERS' REQUIREMENTS

5

3C :

DESIGN & FABRICATION OF

CIRCULAR HANDRAILS

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

· · · ·

SABIC ENGINEERING STANDARDS B04-F01 PROCESS INDUSTRY PRACTICE STF05501 SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 OR AS PER CUSTOMERS' REQUIREMENTS

3D :

DESIGN & FABRICATION OF

STRAIGHT HANDRAILS

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

· · · ·

SABIC ENGINEERING STANDARDS B04-F01 PROCESS INDUSTRY PRACTICE STF05501 SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 OR AS PER CUSTOMERS' REQUIREMENTS

3E :

DESIGN & FABRICATION OF

STAIR HANDRAILS

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

· · · ·

SABIC ENGINEERING STANDARDS B04-F01 PROCESS INDUSTRY PRACTICE STF05501 SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 OR AS PER CUSTOMERS' REQUIREMENTS

6

3F :

DESIGN & FABRICATION OF

LADDERS WITH HOOPS CAGES

LADDERS CONFORMS TO THE FOLLOWING STANDARDS:

· · · ·

SABIC ENGINEERING STANDARDS B04-F01 PROCESS INDUSTRY PRACTICE STF05501 SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007 OR AS PER CUSTOMERS' REQUIREMENTS

3G :

DESIGN & FABRICATION OF

FENCES (ALL TYPES )

· ·

ALL TYPES OF SAUDI ARAMCO FENCE INSTALLATION WORK ALL KINDS OF SABIC APPROVED FENCE FABRICATION AND

INSTALLATION WORK

·

DESIGN & FABRICATION OF ANY OTHER TYPE OF FENCE AS PER CLIENT REQUIREMENTS

3H :

DESIGN & INSTALLATION OF

FIRE FIGHTING/SPRINKLER SYSTEM

· · ·

For All Kinds Of Hangers For Office & Residential Buildings For Shopping Malls & Business Centers Etc

7

3J : SAND BLASTING & PAINTING

· · ·

Pipes & Pipe Spools Misc. Structure Tanks (Inner & Outer)

30,000 SQ. METER PAINTING YARD WITH QUALIFIED MANPOWER AND EQUIPMENT & TOOLS ETC. OUR PAINTING COMPLY WITH SAUDI ARAMCO & SABIC STANDARDS.

3K :

DESIGN & FABRICATION OF

HANGERS & PORTABLES

· · ·

Storage Hangers/ Warehouses Production/Factory Hangers Multi Layer Office Buildings Etc

3L :

CIVIL CONSTRUCTION

INDUSTRIAL, BUILDINGS & MISC. WORKS

· · · · · · ·

Foundations For Machines & Structure Etc Sand Filling, Marl Capping, Leveling Etc Pipe Line , Corridor Sleepers & Thrust Anchors Etc Ducks Banks/ Pilling Building Works Floor Concreting Fencing & Boundary Walls Etc

8

4: COMPLETED PROJECT

ANCC-601 FABRICATION, PAINTING & ERECTION OF 300 TON STEEL STRUCTURE @ JOI'AMAH GAS PLANT CLIENT: DURATION: FAISAL M. QAHTANI SONS CO. 10 MONTHS (FEB TO DEC 05)

9

COMPLETED PROJECT

ANCC-602 WELDING OF 20" DIA CRUDE PIPELINE (20 KM)@ HARADH - UNDER SAUDI ARAMCO CLIENT: DURATION: FAISAL M. QAHTANI SONS CO. 15 MONTHS (JUL 05 TO OCT 06)

10

COMPLETED PROJECT

ANCC-603 PIPING INSTALLATION @ QASSIM CEMENT PLANT CLIENT: DURATION: AMEN ENGG. INTN'L 10 MONTHS (JUN 05 ~MAR 06)

11

COMPLETED PROJECT

ANCC-604 FABRICATION, PAINTING & ERECTION OF 1,450 TON STRUCTURE, 50,000 DIA-INCH PIPING & 150 TON CABLE TRAYS @ SULFUR FACTORY DAMMAM-II CLIENT: DURATION: SULFUR FACTORY DAMMAM-II 12 MONTHS (JAN TO DEC 06)

12

COMPLETED PROJECT

ANCC-605 FABRICATION OF 11,000 DIA-INCH CS / SS PIPING @ TASNEE ETHYLENE PROJECT JUBAIL CLIENT: DURATION: CONTRACTING & TRADING CO. CAT /SAMSUNG ENGG. SAUDI ARABIA 08 MONTHS (JUL 06 TO MAR 07)

13

COMPLETED PROJECT

ANCC-606 FABRICATION OF APROX. 800 TON STRUCTURE @ FABRICATION YARD JUBAIL CLIENT: SAUDI PAN GULF CO. /SAUDI ARAMCO DURATION: 09 MONTHS (JAN TO SEP 07)

14

COMPLETED PROJECT

ANCC-607 SAND BLASTING & PAINTING OF PIPES & PIPE SPOOLS/ SUPPORTS (APROX. 55,000 SQ.M) @ AL-WAHA / SAHARA PROJECT- JUBAIL

CLIENT:

DURATION:

OLAYAN DESCON INDUSTRIAL CO.

JUBAIL- SAUDI ARABIA 12 MONTHS (JUL 07 TO JUN 08)

15

COMPLETED PROJECT

ANCC-608 FABRICATION OF APROX. 85,000 INCH-DIA OF PIPING & 28,000 INCH-DIA SITE INSTALLATION @ ALWAHA / SAHARA PROJECT- JUBAIL

CLIENT:

OLAYAN DESCON INDUSTRIAL CO.

JUBAIL- SAUDI ARABIA

DURATION:

12 MONTHS(SEP 07 TO AUG 08)

16

COMPLETED PROJECT

17

COMPLETED PROJECT

ANCC-610 CIVIL STRUCTURE/ BLOCK WORK/ FINISHING WORK FOR NESMA WORKERS CAMP AL-JUBAIL (5,200 SQ.METER COVERED AREA) CLIENT: CO. DURATION: RAKAN TRADING & CONTRACTING AL-KHOBAR, SAUDI ARABIA 10 MONTHS (JUNE 09 TO APRIL 10)

18

COMPLETED PROJECT

ANCC-611 FABRICATION & WELDING OF APROX. 520 TONS OF STEEL STRUCTURE /HANDRAILS/ LADDERS & PAINTING OF 750 TONS OF FENCE AT AL-NEMSHAN FAB. YARD JUBAIL CLIENT: SAUDI PAN GULF JUBAIL- SAUDI ARABIA DURATION: 12 MONTHS (JULY 09 TO JULY 10)

19

COMPLETED PROJECT

ANCC-612 BLASTING & PAINTING OF APROX. 30,000 SQ. MTR OF STEEL STRUCTURE, TANKS, HANDRAILS, LADDERS & PIPES AT MA'ADEN MAGNASITE PROJECT ALMADINA

CLIENT:

OLAYAN DESCON INDUSTRIAL CO

JUBAIL- SAUDI ARABIA

DURATION:

10 MONTHS (DEC 09 TO SEP 10)

20

COMPLETED PROJECT

ANCC-613 SAND BLASTING, PAINTING, FABRICATION & INSTALLATION OF FABRICATION/ STORAGE HANGERS APROX. 950 SQ METER STRUCTURE AT ALNEMSHAN FAB. YARD JUBAIL CLIENT: SINOPEC JUBAIL- SAUDI ARABIA DURATION: 04 MONTHS (JUNE 10 TO SEP 10)

21

COMPLETED PROJECT

ANCC-614 150,000 M³ SAND FILLING AND 50,000 M² MARL CAPPING WITH 20CM THICKNESS AT ODICO YARD ABU-HADRIYA CLIENT: OLAYAN DESCON INDUSTRIAL CO JUBAIL- SAUDI ARABIA DURATION: 02 MONTHS (OCT 10 TO NOV 10)

22

COMPLETED PROJECT

ANCC-615 FABRICATION OF 50 TONS OF STEEL STRUCTURE HANDRAILS AT AL-NEMSHAN FAB. YARD JUBAIL CLIENT: SAUDI PAN GULF JUBAIL- SAUDI ARABIA DURATION: 06 MONTHS (SEP 10 TO AUG 11)

23

COMPLETED PROJECT

ANCC-616 SAND BLASTING, PAINTING, FABRICATION & ERECTION OF HANGER APROX. 1000 SQ METER STEEL STRUCTURE AT UNITED ARAB CAN MANUFACTURING CO. DAMMAM INDUSTRIAL II. CLIENT: UNITED ARAB CAN MANUFACTURING CO DAMMAM INDUSTRIAL II- SAUDI ARABIA DURATION: 02 MONTHS (DEC 11 TO JAN 12)

24

COMPLETED PROJECT

ANCC-617 ERECTION OF FOUR HANGRS APROX. 8,000 SQ. MTR OF STEEL STRUCTURE AT WASIT GAS FIELD KHURASNIA CLIENT: SENDAN INTERNATIONAL CO. JUBAIL- SAUDI ARABIA DURATION: 03 MONTHS (DEC 11 TO DATE)

25

ONGOING PROJECT

ANCC-618 BLASTING & PAINTING OF APROX. 32,000 SQ. MTR OF STEEL STRUCTURE & PIPES AT ODICO YARD ABUHADRIYA JUBAIL CLIENT: OLAYAN DESCON INDUSTRIAL CO JUBAIL- SAUDI ARABIA DURATION: 18 MONTHS (MAR 11 TO DATE)

26

ONGOING PROJECT

ANCC-619 STEEL STRUCTURE WORK, EXCAVATION, CONCRETE FOUNDATION, CONCRETE FLOORING AT H.H.I YARD AL-JUBAIL Client: Hamte Heavy Industries Jubail- Saudi Arabia Duration: 04 months (Jan 12 to Date)

27

ONGOING PROJECT

ANCC-620 EXCAVATION, FOUNDATIONS & STEEL HANGER STRUCTURE ERECTION AT SENDAN HEAD OFFICE ROYAL COMMISION AL-JUBAIL CLIENT: SENDAN INTERNATIONAL CO. JUBAIL- SAUDI ARABIA DURATION: 02 MONTHS (APRIL 12 TO DATE)

28

Manpower Distribution

Engineers Foreman Pipe Fitter Sand Blasters Carpenters Mason Helpers

3% 6% 16%

Supervisors Fabricators Welders Industrial Painters Steel Fixer Electrician 4%

4% 8%

11%

18% 9%

6% 4% 6%

5%

29

CURRENT ASSETS

Lay Down & Painting/ Fabrication Yard -In Jubail Area -50,000 M² Graders Loader Roller/Compacter Dump Truck Trailer Water Tanker Fork Lifter 5 Ton Cars + Pick Ups Grooving/ Threading Machines CNC Cutting Machine Shearing Machine -02 Nos. -03 Nos. -04 Nos. -08 Nos. -22 Nos. -06 Nos. - 02 Nos. - 15 Nos. -02 Nos. -01 No. -01 No.

Bending & Rolling Machine

Welding Generators Lincoln SAE-400 Welding Rectifiers 450 Amps. Radial Drill Machine Diesel Generator 200 KVA Dyna Truck/ Boom Truck

- 02 Nos.

- 15 Nos. - 20 Nos. - 01 Nos. - 04 Nos. - 04 Nos.

Airless Paint Spray Machine

Sand Blasting Machine Air Compressor ­ 750 CFM Air Compressor ­ 390 CFM Air Compressor ­ 265 CFM Buses/ Hiace etc

- 08 Sets

- 06 Sets - 04 Nos. - 04 Nos. - 05 Nos. -05 Nos.

30

Our Main Clients!

Faisal M. Qahtani Sons Co. (FMQ) P.O. Box # 31712, Al-Khobar 31952 Mr. Santiago F. Talaue ­ Project Director Phone: 03-814 0404 Amen Engineering International P.O. Box # 3381,Al-Khobar 31952­Flour Arabia Bldg.Suit # 407 Mr. Haikal bin Abdullah ­ Project Manager Phone: 03-887 0174 National Est. for Industrial & Agricultural Sulfur- Sulfur Factory Dammam-II P.O. Box # 3891, Dammam 31481 Mr. R.U.M Rao ­ Tech. Plant Manager Phone: 03-812 1009 / 03-812 1541 Contracting & Trading Co. C.A.T P.O. Box # 338, Al-Khobar 31952 Mr. Fouad G. Sarkis ­ Area Manager Phone: 03-895 1120 / 03-864 1455 Saudi Pan Gulf Co. P.O. Box # 10143, Jubail Industrial Area 31961 Mr. Irfan Ahmed Khan ­ Operation Manager Phone: 340 0691 / 050 685 8288 Olayan Descon Industrial Co. P.O. Box # 10108, Jubail Industrial area 31961 Mr. Wajahat Saeed Toor ­ Manager Construction Phone: 341 0671 / 340 7024 Rakan Trading & Contracting Co. (RTCC) P.O. Box # 31968, Al-Khobar 31952 Engr. Geyad ­ Project Manager (Al-Turki Compound Jubail) Phone: 03 889 1929 / 03 865 5571 United Arab Can Manufacturing Co. Dammam Industrial II Mr. Qasim ­ Operation Manager Phone: 059 185 0850 Sendan International Co. Jubail Industrial Area 31961 Mr. Mohammad Sohail ­ Project Manager Phone: 050 019 3692

Fax: 3 814 0300

Fax: 3 887 0484

Fax: 3 812 1002

Fax: 3 895 0427

Fax: 340 0692

Fax: 341 0950

Fax: 3 889 1895

31

32

Information

Abdullah Al-Nemshan Contracting Center

32 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

993016