REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

SKID PROJECTS REFERENCES

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

A Brief Overview of Emerson Process Management

Emerson Process Management is a division of US based Emerson Electric Co., one of the world's most consistently successful industrial corporations. Founded in 1809 in St. Louis, Missouri, USA as a manufacturer of electric motors and fans. Emerson has evolved from a small regional producer to a major global enterprise manufacturing and marketing a wide range of electrical, electronic and electromechanical products for commercial, industrial and consumer markets. Emerson has more than 60 divisions with 100,000 employees making and selling products in more than 150 countries through a network of 3,500 locations. Emerson Process Management is the world's leading supplier of process management products and solutions, including control valves, regulators, motors, transmitters, analyzers, process management systems, software, and services with annual worldwide sales exceeding four billion US dollars. Emerson Process Management has offices in over 75 countries in six continents with a total work force of over 17,000. Emerson Process Management is recognized for offering the industry's broadest and most complete line of process-management equipment and technology. Our process and technology know-how, combined with a keen awareness of industry trends and concerns, equips us to develop technologies, products, systems, and software that deliver the results and reliability our customers' demand.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

Emerson Process Management Pte Ltd, Singapore

The Asia Pacific headquarters for Emerson Process Management Asia Pacific Pte Ltd is in Singapore. Emerson Process Management, Singapore operates from a 250,000 square foot facility, staffed by approximately 1000 employees. The Singapore facility also serves as a manufacturing and assembly plant for Rosemount Analytical systems, Fisher Control valves, Rosemount Measurement, Fisher-Rosemount Process Control Systems.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

Emerson South East Asia Service Center

Emerson Natural Gas Technologies Emerson South East Asia Service Center is located at No. 9 Gul Road. This new facility has a floor area of 36 000 square feet, having a shop floor area of 20 000 square feet. This facility offered integrated Service for the following divisions: 1. 2. 3. 4. 5. 6. Valves Regulators Instruments Flow Delta V AMS

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

Emerson Natural Gas Technologies, Skid Fabrication Center

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

Being part of Emerson Regulator Technologies, Natural Gas Technologies has our very own fabrication facility within this center covering a floor area of 6000 square feet. - Engineering and integration of Emerson products such as regulators, metering and flow control valves, etc - Design and Detail Engineering - Project management - Procurement - Production of pressure regulating and metering skids - Documentation - Conducting FAT and SAT - Commissioning - Start-up - Training

Emerson Natural Gas Technologies Completed projects ranges from simple pressure regulation cum custody transfer flow metering skids to sophisticated complete solutions which includes gas odourizing, preheating, remote setting of the regulators, flow limiting flow control valves and LC-21

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

systems. The center is able to leverage on the immense pool of Emerson products to provide complete solutions to almost all natural gas needs. Besides, it is also able to harness the best practices and technologies from the Emerson's regulator brand names of (Italian) Tartarini, (American) Fisher and (French) Francel. The heart of all sophisticated pressure regulation and flow metering systems always lie with the field automation system (FAS) division which provides the brain to electronically convert flows per AGA requirements, log data, communicate data via RS 232, 385, Ethernet and Modbus. FAS division has reliability proven ROC, Logti, Flowti and FloBoss series of remote terminal unit to provide the above functions and also to control the odourizing, pressure set points via LC-21 remote control system.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURE

: : : : : : : :

BEIJING GAS, CHINA PRESSURE REGULATING TRAIN 40 BARG 1 BARG 90,000 SM3/H RS-90000-1-12/20 119 (VARIOUS MODELS) 6" ACTIVE FL/150 REGULATORS 6" MONITOR FL/150 REGULATORS

SUMMARY: Emerson Process Management supplied quality trains complete with monitor and active 6" FL regulators. There are a total of 119 units of various flow and pressure requirements.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

SEMBCORP GAS PTE LTD, SINGAPORE DISTRICT PRESSURE REGULATING STATION 48 BARG 5 BARG 11,800 SM3/H MRS-11800-1SB-4/6 2 DOSAODOR ODOURIZING MODULE INDIRECT GAS PREHEAT GAS PRESSURE REGULATION TURBINE METERING CONTROL BY FB504

SUMMARY: Emerson Process Management provided a complete solution for Sembcorp Gas Pte Ltd of Singapore with Emerson's proven state-of-the-art, Tartarini, DOSAODOR-D, odourizing module. As the pressure drop is acute across the regulator, it became necessary to preheat the incoming gas to prevent condensation of the gases. This is achieved by electrically indirect heating. Any condensation of water or hydrocarbons will be detrimental to customer's downstream system. This complete package of odourizing, gas pre-heat, pressure regulating, flow metering system is made possible only by leveraging Emerson's technology from Emerson's very own Francel, Tartarini and Fisher brand names.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL FEATURE

: : : : : : :

GRACE TECHNOLOGY (CHINA) PRESSURE REGULATING TRAIN 4 BARG 2 BARG 6000 SM3/H MRS-6000-1SB-6/8 3" FISHER 1098 REGULATOR 3" SLAM SHUT VALVE ELECTRICAL ACTUATED VALVES 6" TURBINE METER FLOBOSS 504

SUMMARY: Emerson Process Management boosts of having its own turbine meter range. Slam shut valve is also provided as a reliable shut off in the event that the system exceeds preset limits. Allowing remote shut off of the station, electrically actuated valve is controlled by FloBoss 504 which in turn communicating with customer's control room.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER : PROJECT : INLET PRESSURE : OUTLET PRESSURE: FLOW RATE : MODEL : FEATURE :

GUJARAT GAS LTD. INDIA AMBOLI METER & PRESS. REGULATING STATION 32~38 BARG 31 BARG 12,5000 SM3/H MRS-12500-1SB-4/6 3" TARTARINI FL REGULATOR CYCLONE TYPE KNOCK OUT DRUM 6" JUNIOR ORIFICE METER LC-21 REMOTE PRESSURE CONTROL SYSTEM FLOBOSS 503

SUMMARY: State-of-the-art LC-21 is implemented in this system to vary the pressure set point of the regulator remotely. Emerson is also able to supply the orifice metering system for custody transfer with a stack DP for improved rangeability. As the gas is expected to be wet, the gas will be knocked out of its liquid content by the installed cyclone type knock out drum before being filtered by Emerson's very own dry filter system.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER : PROJECT : INLET PRESSURE : OUTLET PRESSURE: FLOW RATE : MODEL : FEATURE :

GUJARAT GAS LTD. INDIA JHAGADIA METER/ PRESS. REGULATING STATION 52~60 BARG 50 BARG 12,500 SM3/H MRS-12500-1SB-3/2 3" TARTARINI CRONOS REGULATOR FISHER FILTER 4" EMERSON DANIEL SENIOR ORIFICE METER LC-21 REMOTE PRESSURE CONTROL SYSTEM 3" FISHER FLOW CONTROL VALVE ROC 364

SUMMARY: This complete system is capable of remotely varying the pressure set point of all the 4 regulators remotely through LC-21. Emerson is also able to supply the orifice metering system for custody transfer with a stack DP for improved metering rangeability. The regulator controls the pressure and the flow control valve limits the flow to predetermined setpoints. Daniel, being part of the Emerson stable, also supplies the senior orifice meter. The fitting allows changing of the orifice plate while the system is on line supplying. Also worth mentioning is the compact single bodied Cronos regulator which consists of the monitor, active and slam shut valve. All flow, pressure and modes data are logged in the ROC 809 system. Such data can be polled from the RTU via customer's VSAT and modem system via RS232, RS485 and GSM lines.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER : PROJECT : INLET PRESSURE : OUTLET PRESSURE: FLOW RATE : MODEL : FEATURE :

GUJARAT GAS LTD. INDIA CAIRN MORA LP METER & FLOW CONTROL SKID 16~22 BARG 14 BARG 93,750 SM3/H MRS-93750-1B-18/12 12" JUNIOR ORIFICE METER 12" FISHER FLOW CONTROL VALVE 14" CYCLONE KNOCK OUT DRUM 14" DRY GAS FILTER

SUMMARY: This system serves as a flow control station before feeding the gas to the compression station. The flow control valve offers the latest digital valve control system which is capable of harnessing the advantages of using HART protocol. By using a HART system, diagnostics, positional feedbacks and other useful information is being fed back to the control customer's DCS system. Compressed air on site is not required to feed the required pressure to the control valve as the unique system uses the mainline pressure to actuate the valve. System also allows remote monitoring of the knock out liquid level and drain can be activated remotely from the customer's control room.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER : PROJECT : INLET PRESSURE : OUTLET PRESSURE: FLOW RATE : MODEL : FEATURE :

GUJARAT GAS LTD. INDIA METERING AND PRESSURE REGULATING STATION 40~47 BARG 28 BARG 25,000 SM3/H MRS-25000-1SB-10/6 3" TARTARINI CRONOS REGULATOR FISHER FILTER 6" EMERSON DANIEL SENIOR ORIFICE METER LC-21 REMOTE PRESSURE CONTROL SYSTEM LC-21 FLOW LIMITING CONTROL ROC 809

SUMMARY: This complete system is capable of remotely varying the pressure set point of all the 4 regulators remotely. Emerson is also able to supply the orifice metering system for custody transfer with a stack DP for improved metering rangeability. The regulator controls the pressure and the flow control valve limits the flow to predetermined setpoints. Daniel, being part of the Emerson stable, also supplies the senior orifice meter. The fitting allows changing of the orifice plate while the system is on line supplying. Also worth mentioning is the compact single bodied Cronos regulator which consists of monitor, active and slam shut valve. LC-21 system is also implemented with the latest ROC809 remote terminal unit to implement both pressure set point and flow limit control. All flow, pressure and modes data are logged in the ROC 809 system. Such data can be polled from the RTU via customer's SCADA, modem and Ethernet system via RS232, RS485 and GSM lines.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

POWERGAS LTD, SINGAPORE 2+1YEARS CONTRACT PRESSURE AND METERING SKIDS 2-5 BARG 0.1~2.5 BARG 50 ~ 7000 NM3/H MRS MORE THAN 30 SKIDS TWO STREAMS REGULATING BYPASS METERING ELECTRONIC VOLUME CORRECTOR TURBINE METERING

SUMMARY: Emerson Process Management provided a complete solution for PowerGas Ltd of Singapore with Emerson's quality skids, Tartarini, Fisher, Francel products integrated into complete systems inclusive of custody transfer requirements. As the leader in the supply of Pressure Regulating and Metering Skids in Singapore, Emerson is able to cater to all ranges of process conditions required by the commercial and industrial users.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

POWERGAS (SINGAPORE) TUAS OFFTAKE STATION 28 BARG 3 BARG 20000 SM3/H PRS 1 TWO STREAMS REGULATING LC 21

SUMMARY: Emerson Process Management provided a complete solution for PowerGas Ltd of Singapore for this project. The system can provide constant supply pressure through the application of our LC-21 system, a product of our Tartarini Remote Control system. The regulated pressure and flow limitation Remote control system aims at allowing an operator to vary simultaneously the setting value of all pressure regulators by keeping unchanged the setting gap necessary to the proper operation of the installation and thus bring the station outlet pressure to a value between the preset minimum and maximum value and control the maximum flow rate supply.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

SEMBCORP GAS PTE LTD, SINGAPORE METERING AND PRESSURE REGULATING SKIDS 2-5 BARG 0.1~2.5 BARG 50 ~ 7000 NM3/H MPRS MORE THAN 70 SKIDS TWO STREAMS REGULATING BYPASS METERING ELECTRONIC VOLUME CORRECTOR TURBINE METERING

SUMMARY: Emerson Process Management provided a complete solution for Sembcorp Gas Pte Ltd of Singapore with Emerson's quality skids, Tartarini, Fisher, Francel products integrated into complete systems inclusive of custody transfer requirements. As the leader in the supply of Pressure Regulating and Metering Skids in Singapore, Emerson is able to cater to all ranges of process conditions required by the commercial and industrial users. The skids are compact and enclosed by steel cabinet with proper ventilations louvers.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

PT CONTROL SYSTEMS, INDONESIA METERING AND PRESSURE REGULATING SKIDS 10-40 BARG 1-5 BARG 50 ~ 7000 NM3/H MPRS MORE THAN 40 SKIDS TWO STREAMS REGULATING BYPASS METERING ELECTRONIC VOLUME CORRECTOR TURBINE METERING

SUMMARY: Emerson Process Management also supplied skids to our representatives in Indonesia which in turns supplied to end user like PGN Negara Pershuann, PGN Bogor, PGN Surabaya, PGN Medan, PT BAYU, PT BIG etc.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

S ALAM HIGH PRESSURE DISTRICT REGULATING SKID FOR BANGLADESH

S ALAM HIGH PRESSURE DISTRICT REGULATING SKID WITH METERING SKID (CABINETED) IN THE BACKGROUND.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

S ALAM /BAKHRABAD GAS SYSTEM LTD BANGLADESH HIGH PRESSURE DISTRICT REGULATING SKID 12-24 BARG 3.5-10 BARG 33500 SM3/H HP/DRS 2 SKIDS TWO STREAMS ACTIVE & MONITORING REGULATING, WITH METERING

SUMMARY: Emerson Process Management provided a complete solution for Bakhrabad Gas System Ltd. of Bangladesh .This skid system employs a active and monitor regulating configuration completed with filtration and metering skid. The metering is also cabinated as required by the customer. The Fisher 1098 regulators is integrated into this system to give maximize performance and stability. This is one of our customized skids. The end user has also placed order for a similar skid with lower flow rate of 7000 Sm3/h.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

CHINA PETROLUEM AND EQUIPMENT CORPORATION, CHINA LANZHOU TO YIN CHUAN GAS PIPELINE PROJECT 2.96MPA TO 4MPA 3KPA TO 138KPA 1080 SM3/H SELF USED SKID 4 SKIDS TWO STAGES PRESSURE REDUCTION WITH FOUR STREAMS FINAL STAGE REDUCTIONS TO SUPPLY TWO DIFFERENT USER AT DIFFERENT FLOWRATES AND PRESSURES COMPLETE WITH HEATING SYSTEMS

SUMMARY: Emerson supply these rugged skids to cater to the extreme conditions in China`s weather conditions and environment. The skids come with heaters to cater to the extreme cold weather conditions. It employs 2 stages pressure regulation to cater to the high inlet pressure and very low pressure outlet of as low as 3 KPA. It utilizes Fisher 627 regulators with Tartarini's R series regulators for low pressure applications. It is well proven records for Emerson's capabilities in providing the end user complete solutions.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

TITAS GAS LTD , BANGLADESH METERING AND PRESSURE REGULATING SKIDS 4 TO 10 BARG 1 BARG TO 4 BARG 100 TO 3000 SM3/H MPRS 44 SKIDS PRESSURE REDUCTION WITH SINGLE STREAM

SUMMARY: This system skid employs a Single run configuration with one regulator, one filter and meter with electronic volume corrector for custody transfer. It uses Tartarini Flowti and Fisher regulators and turbine meters.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INJECTION PRESSURE CONCENTRATION FLOW RATE MODEL QTY FEATURES

: : : : : : : :

INDRAPRASTHA GAS LIMITED , INDIA ODOURIZING UNITS FOR DELHI CITY GAS DISTRIBUTION PROJECT 60 BARG 15 MG /SM3 100000 SM3/H DOSAODOR-D 3 SKIDS ODOURIZING SKIDS WITH PNEUMATIC PANELS AND ELECTRONIC CONTROL UNIT COMPLETE WITH STORAGE VESSEL AND AND STANDBY INJECTION UPON FAILURE

SUMMARY: Emerson supplies 3 Odourizing skids to IGL India, for the above-mentioned project. The skids employs Tartarini Dorsador ­ D Pneumatic Panel and Electronic Control Unit .The skids comes with 2 Storage Tanks, One active and One Standby. The tanks can be manufactured in carbon steel or stainless steel materials. The system also provides a backup injection using a injection pump in case of power failure. The pneumatic panels are enclosed in a weatherproof enclosure and the ECU will be installed in the Control room.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

POWER GAS LTD, SINGAPORE UNDERGROUND STATIONS UP TO 5 BARG 17MBARG TO 30MARG UP TO 5500 SM3/H UNDERGROUND MODULES 6 STATIONS COMPACT DESIGN FOR SPACE CONSTRAINT

SUMMARY: Emerson supplies 6 units of the stations to Power Gas Ltd in Singapore. The unique advantage is the compact design and hydraulically operated to jack up the system for service and maintenance as seen above. It also utilizes the Tartarini MFL design regulators which is a active and monitor system configuration.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES SUPPLY PERIOD

: : : : : : : : :

BAKHRABAD GAS SYSTEM LTD BANGLADESH 38 NOS OF SKID MOUNTED CUSTOMER METERING SKIDS (LP&MP/CMS) 1.5-10.5 BARG 0.075-1.5 BARG 45- 1300 SM3/H LP & MP /CMS 38 SKIDS ONE STREAMS ACTIVE & MONITORING REGULATING, WITH METERING 2007

SUMMARY: Emerson Process Management provided a complete solution for Bakhrabad Gas System Ltd. of Bangladesh .This skid system employs a active and monitor regulating configuration completed with filtration and metering skid. The Fisher 299H and FL-BP regulators is integrated into this system to give maximize performance and stability. This is one of our customized skids. The end user has also placed repeat order for a similar skid with the same models for another 19 skids

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

CUSTOMER PROJECT INLET PRESSURE OUTLET PRESSURE FLOW RATE MODEL QTY FEATURES

: : : : : : : :

SUPPLY PERIOD

:

SINOPEC CHINA PETROLEUM INTERNATIONAL COMPANY, CHINA 34 NOS OF SKID MOUNTED REGULATING SKIDS 36-91 BARG 36-78BARG 5000- 320000 NM3/H FE-320000S / FE-150000S/FE-20000S 34 SKIDS ONE /TWO/THREE/STREAMS, MONITOR REGULATING, WITH ACTIVE CONTROL VALVES 2007~ 2008

SUMMARY: Emerson Process Management supply a total of 34 train skids for Sinopec China Petroleum International Company, China for the Project: "SICHUAN TO EAST PIPELINE "The skid system employs a active control valve and monitor regulating configuration completed with instrumentation and electrical installation and heat tracing system. Our 10" 971, and 8" FL, together with OSE slam shut valves were integrated into the skid. We also incorporate the Mokveld Control valves as the active control in these customized skids. The skids also managed by PLC with SCADA control.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

This Skid assembly comprises our Francel 8" OSE Slam shut valve with Tartarini 8' FL Regulators and Mokveld 8" Control valve. The slam shut valve can be activated remotely from the Control Room to shut the system upon emergency. The FL regulator is wide open and monitoring the downstream consumption. The Mokveld valve is active and controlling the flow consumption. In case the control valve fails, the Monitor regulator takes over the regulation. This is station is for Chuan Wei Terminal Station (Chang Shou Qu), total of 2 stations for the above Sinopec Sichuan to East Pipeline Project.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

This Skid assembly comprises our Francel 1" OSE Slam shut valve with Tartarini 1' FL Regulators and Fisher 1" ET Control valve with positioner DVC 6010 and 657 Actuator. The slam shut valve can be activated remotely from the Control Room to shut the system upon emergency. The FL regulator is wide open and monitoring the downstream consumption. The Fisher Control valve is active and controlling the flow consumption. Incase the control valve failed , the Monitor regulator takes over the regulation. This is station is for Dahua Terminal Station ( Fertilizer Plant) , total of 3 stations for the above Sinopec Sichuan to East Pipeline Project with 2 stations having the Fisher ET valves with Rotork Actuator and 1 station with 657 Actuator , providing a complete solution to our customers depending on site conditions.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

REGULATOR DIVISION NATURAL GAS TECHNOLOGIES

This Skid assembly comprises our Francel 10" OSE Slam shut valve with Tartarini 10" 971 Globe Regulators and Mokveld 10" Control valve with ABB positioner Mokveld Actuator. The slam shut valve can be activated remotely from the Control Room to shut the system upon emergency. The 971 regulator is wide open and monitoring the downstream consumption. The Control valve is active and controlling the flow consumption. In case the control valve fails, the Monitoring 971 regulator takes over the regulation. This is station is for Chuan Wei Terminal Station (Chuan Wei Factory) and Jia Xing Offtake Stations, total of 5 stations for the above Sinopec Sichuan to East Pipeline Project with former 2 stations having the Mokveld valves with Mokveld Actuator and latter 3 stations with Rotork Actuators, Both 5 stations utilizing our 10" 971 regulators as a monitors providing a complete solution to our customers depending on site conditions.

PROJECT REFERENCE FOR EMERSON SKID INTEGRATION CENTER, SINGAPORE

Information

Microsoft Word - overview skid reference-17-10-2008.doc

29 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

587899


You might also be interested in

BETA
Emerson f-sheet sign off.indd
Microsoft Word - overview skid reference-17-10-2008.doc