Read Microsoft Word - Preliminary Cost Estimate 1-22-09.doc text version

APPENDIX I Construction Cost Estimate Worksheet

Property Address ________________________________________________________________________ Neighborhood: __________________________________________________________________________ Company Name: _________________________ Contact: ___________________Phone #: ____________ Type of property: 1 family 2 family Qty 3+ family Cost $ Condo Other_____________________________ Qty Cost $

Repair/ Type of Improvements New R or N General: Permits Demolition Trash Removal Lead Abatement Asbestos Abatement Exterior: Chimney Roof Gutters Down Spouts Siding Trim Windows Paint Bulkhead Front Porches Back Porches Walkways Stairs Front / Back Lawn & Grounds: Tree Trimming Fences / Gates Driveways Landscaping Retaining Walls Basement: Stairs Foundation Structural Framing Sump Pump Lally Columns

Repair/ Type of Improvements New R or N Heating: 0.00 Boiler / Furnace 0.00 Duct Work 0.00 Baseboard Fin Tube 0.00 Radiator 0.00 Hot Water Tank/Heat

0.00

0.00

0.00 0.00 0.00

Air Conditioning: 0.00 Central Air 0.00 Wall Units 0.00 Window Units 0.00 0.00 0.00 Electrical: 0.00 Service 0.00 Panel 0.00 Outlets 0.00 Switches 0.00 Light Fixtures 0.00 Wiring 0.00 Cable Doorbells Telephone 0.00 Equipment Wiring 0.00 Miscellaneous 0.00 0.00 0.00 Plumbing: Main Water Line 0.00 Main Sewer Line 0.00 Main Gas Line 0.00 Water Pipe Hot / Cold 0.00 Sewer Pipe / Stacks 0.00 Gas Pipe Washer / Dry Hook up Miscellaneous

0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

1

APPENDIX I Construction Cost Estimate Worksheet

Type of Improvements Kitchen: Cabinets / Knobs Countertop / B-splash Sink Disposal Stove / Range Exhaust Fan/Hood Dishwasher Refrigerator Back Total Gut Flooring: Carpeting Hard Wood Tile VCT Refinish Wood Floor Stair Treads Insulation: Attic Walls Pipe and Duct Work Basement Ceiling Acoustic Life Safety Systems: Smoke Detectors Carbon Detectors Fire Alarm Sprinkler System Fire Escape Emergency Lights Heat Detectors Child Guards Other

Repair/ New Qty R or N

Cost $

0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

Repair/ Type of Improvements New Qty R or N Bathroom: Sink Countertop Vanity Mirror / Med. Cabinet Toilet & Seat Tower Bar Soap & T.P. Holder Grab Bars Tub / Shower Shower Rod Energy Star Fan Total Gut Wall: Masonry Brick Drywall

Cost $

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00

Gen Carpentry: Wall Framing 0.00 Floor Joist 0.00 Roof Rafters 0.00 Stairs 0.00 Hand Rail 0.00 Guard Rail Sheathing Sills 0.00 Sub Flooring 0.00 Heavy Timber 0.00 Handicap Ramp 0.00 0.00 Subtotal: 0.00 Overhead & Profit 0.00 Grand Total: 0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

% 0.00

$ $ $

0.00 0.00

0.00

2

Information

Microsoft Word - Preliminary Cost Estimate 1-22-09.doc

2 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

677782


You might also be interested in

BETA
Army Special Operations Forces Chemical, Biological, Radiological, and Nuclear Operations
APTLEASE
aptlease,inventry,petagree,leadhazd,submeter,wtrmeter09,moldaddn,security,addgahp,moveout,asbestos,earlyt2,wtrallo2,satelit2,trashbl2,encgara2,natgasa2,lmwvmdr2,rentcon2,rentins2,addgate2,addinalm,conlease,reslease,roomate,addpprsm,rentappl,guaranty,noncit
RESLEASE
Housing Rehabilitation Programs