In August 2005, NKT was awarded the Contract to supply all flexible pipes for the Dumbarton Field Development. The Dumbarton field is located in the UK Sector of the North Sea, in block 15/20a and 15/20b. The contract consist of the following scope of supply:

Field Dumbarton Type 12" ID Riser 10" ID Riser 6" ID Riser 6" ID Riser 12" ID Flowline 10" ID Flowline 6" ID Flowline 6" ID Jumpers 2½" ID Jumpers 6" ID Jumper 6" ID Jumper 6" ID Flowline Application Production Water Disposal Gas Lift Gas Export Production Water Disposal Gas Lift Production Gas Lift Gas Export Gas Export Gas Export Length (m) 1 @ 258m 1 @ 237m 1 @ 237m 1 @ 247m 3 @ 740m 2 @ 1092m 1 @ 2300m 6 @ 50m 6 @ 50m 1 @ 127m 1 @ 110m 3 @ 3500m Design Design Pressure (psi) Temperature 3200 psig 3579 psig 3200 psig 3200 psig 3200 psig 3579 psig 3200 psig 3200 psig 3200 psig 3200 psig 3200 psig 3200 psig 80°C 65°C 60°C 60°C 80°C 65°C 60°C 80°C 60°C 60°C 60°C 60°C

Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton Dumbarton

Dumbarton load out to Acergy Polar Queen in August 2006.

NKT Flexibles I/S - flexible pipes for the future

Dumbarton

Maersk is developing the Dumbarton field with six subsea wells and a stand-alone floating production facility, the Global Producer III (GP III), with gas and NGL's exported through the MacCullach export system by means of a tie-in at the MacCulloch PLEM. Heavy modification work was needed on the FPSO in a shipyard before being installed on Dumbarton.

The Global Producer III.

Some of its topside modules were removed to provide space for more process units. New condensate treatment modules and gas compression packages were installed on the ship in 2006. The GP III arrived in the field in November 2006. The riser system contains four flexible risers all configured as a Steep-Wave. At the FPSO turret the risers will enter through I-tubes in the turret base. Each riser will be terminated at a riser base on the seabed. Accordingly, all flexible risers were delivered complete with bend stiffeners at both ends to support the steep wave configuration and bend stiffener male connection devices including wire-structure for pull-in through the I-tubes.

FPSO Sea Level I-tube Section

Topside Bending Stiffener

Upper Buoyancy Module Section Upper Catenary Lower Buoyancy Module Section

Lower Catenary Subsea Bending Stiffener Riser Base Riser base range Seabed

Delivery of the flexibles was completed during August 2006, with all flowline sections being delivered directly by transspooling from NKT storage turntable to the receiving carousel of the installation vessel "Acergy Polar Queen". All jumpers and risers, a total of 14 self-supporting coils and 5 off NKT standard 9.2m OD offshore installation reels were shipped from NKT to Dundee on August 29, 2006 thereby completing NKT's delivery. According to the plan, production is expected to commence in the first quarter of 2007.

14 self-supporting coils on deck.

NKT Flexibles I/S is an independent company owned 51% by NKT Holding and 49% by Acergy. The company is responsible for manufacture and supply of flexible pipe systems for the offshore oil & gas industry as well as the chemical and water industry.

Priorparken 510 · DK-2605 Brøndby · Denmark Tel: +45 43 48 30 00 · Fax: +45 43 48 30 10 E-mail: [email protected] · www.nktflexibles.com

NOV-2006/HBV

Information

2 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

1197602