Project Statistics

Start Date: May 2001 Completion Date: January 2004 Norment Contract Value: $5.6 Million Detention Equipment: $4.1 Million Security Electronics: $1.5 Million

FCI - Bennettsville

Bennettsville, South Carolina

Owner

Federal Bureau of Prisons US Department of Justice 500 First Street, NW Washington, DC 20534 Bill Miller (202) 514-5942

Architect

HOK 235 Peachtree Street, NE Suite 500 Atlanta, GA 30308 John Eisenlau (404) 439-9000

The Bennettsville site is a campus style facility encompassing several hundred acres of land. There are 3 multiple level housing facilities and over 14 administrative and maintenance buildings requiring security. The Federal Prison Camp located in Bennettsville, South Carolina was a design/build project between the U.S. Department of Justice, Federal Bureau of Prisons, and Norment Security Group, Inc. Norment provided and installed detention equipment and security electronics systems. Norment's scope of work included furnishing and installing all security hollow metal, security doors and frames, standard hollow metal, security and non-security hardware, security and non-security glass and glazing and all security mesh. Security doors included 1542 swing doors and the associated security locking hardware. Norment provided the fully integrated security electronics system for all the buildings on the campus site. Some of the integrated systems included Dedicated Paging and Intercom Systems; over 17 OMRON (CV Series) PLC Systems; CCTV Matrix Systems utilizing fiber connectivity; Access Control Systems; Inmate Duress Systems; Perimeter Security Systems; and 21 Graphic Control Panels. Communications between logic controllers was accomplished via Ethernet Lan Network, utilizing non-proprietary protocols.

General Contractor

Hensel Phelps Construction Co. 4437 Brookfield Corporate Drive Suite 207 Chantilly, VA 20151 Brent Helmandollar (703) 828-3200

Bonding Company

Liberty Mutual Insurance Company Boston, MA Terry Reynolds (410) 480-4400

Norment Personnel

Project Manager: Allen Hardy Project Engineer: Steve Murchison Field Superintendent: Preston Byrd

Rev 07/10/06

Information

FCI Bennettsville.pub

1 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

692297


You might also be interested in

BETA
FCI Bennettsville.pub