TECHNOLOGY GOING DEEP.

HERRENKNECHT VERTICAL.

GERMAN TECHNOLOGY FOR THE TURKIS MARKET

Go vertical.

HERRENKNECHT VERTICAL GmbH [email protected] www.vertical-herrenknecht.de

rgen Binder

neral Manager

AGENDA

Company Herrenknecht in Turkey Technology going deep Geothermal Projects in Germany Track Records Summary

rgen Binder

neral Manager

COMPANY

Herrenknecht Group

- More than 3000 employes - Almost one billion turnover - Over 30 years of engineering and know how - Market leader in tunnel boring business

100% subsidiary Herrenknecht Vertical GmbH

rgen Binder

neral Manager

COMPANY ­ EMPLOYEES AND OPERATING PERFORMANCE

1013

1200 1000 800 600 400 200 0

3500 3000 2500 2000 1500 1000 500 0 2004 2005 2006 2007 2008 1518 1665 1849 2345

874 680 594 459

Total operating performance in Mio. EUR

2004

2005

2006

2007

2008

2915

Employees average per year

rgen Binder

neral Manager

HERRENKNECHT GLOBAL

RUSSIA CANADA USA MEXICO UK NETHERLANDS FRANCE SPAIN UKRAINE GERMANY SWITZERLAND IRAN DUBAI SAUDI ARABIA INDIA MALAYSIA SINGAPORE CHINA THAILAND

ITALY

VENEZUELA

BRAZIL AUSTRALIA

UBSIDIARIES

EPRESENTATIVES

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY ­ PROJECTS SINCE 1997

2009 S- 506/505 Kadikoy Kartal Metro Project 6.540 m 2007 S-391 Melen 7 Istanbul 6.110 m ­ beneath the Bosporus 2007 S-369 Bogazkoy Atiksu Tunelleri 2007 S-363/360 Istanbul Metro 6.540 m 2006 S-330 Uluabat 4.990 m 2005 S-325 Istanbul Metro Otogar 6.490 m 2005 S-324 Ankara Metro 5.890 m 2000 S-166 Tarabya Waste Water Tunnel 2.870 m 1997 S-114 Light Rail Transit System Izmir 6.520m

rgen Binder

neral Manager

METRO ISTANBUL.

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY

S-325 | Metro Otogar | Istanbul | Turkey EPB Shield Diameter: 6.490 mm Cutterhead power: 630 kW Tunnel length: 2x 3.000 m Geology: silty clay, silty sand Adi Ortakligi

Contractor: Gülermak Dogus;

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY

S-360 and S-363 | Istanbul Metro Kadiköy Lo1 | Turkey 2 x EPB Shield Diameter: 6,540mm Tunnel length: 2x 8,662m Customer: Dogus Insaat A.S.; Belen Insaat Ltd. Sti; Yuksel Insaat A.S.; Yapi Merkezi A.S.; Yenigun Insaat A.S.

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY ­ A GERMAN TURKISH SUCCESS STORY

8.8km of new metro tunnel by October 2009

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY ­ 135 METERS BENEATH THE BOSPORUS.

S-391 Melen 7 | Istanbul EPB Shield Diameter 6,110mm Water tunnel Breakthrough April 13, 2009 The first connection of two continents driven by machine

rgen Binder

neral Manager

HERRENKNECHT IN TURKEY ­ WATER LINE TO THE GOLDEN HORN

Istanbul | Turkey TBM2500XH Geologiy: Rock Diameter: 3.065 mm Length: 4.241 m

Customer: Depar Insaat Ltd. Sti

rgen Binder

neral Manager

COMPANY

rrenknecht Headquarter in Schwanau, Germany.

rgen Binder

neral Manager

COMPANY

rrenknecht Vertical:

Supplier of safe and modern deep drilling rigs with drilling depth up to 6000m Founded: March 2005 Employees: 125

(Status January 2010)

rgen Binder

neral Manager

TECHNOLOGY GOIND DEEP

TERRA INVADER 350T

Hook Load: 350 mt Drilling Depth up to: 6000m Tripping speed: 500 m/h Hoist power: 1600 kW Hoist stroke: 22m Substructure: Box-on-Box Pipehandling: Semi-automated Range doubles

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

ain Advantges:

Less transport units Less space requirement Less human-resource allocation Minimize risk while drilling High human safety factor

less transport costs less space costs less personnel costs less drilling costs less personnel costs

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

ill Site:

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

sy Rig-up without heavy crane:

2 1

3

4

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP ­ RIGS EASY TO MOBILIZE

350 Slingshot Substructure,

ast and Substructure erected:

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP ­ DESIGNED FOR REMOTE AREAS

TI 350 Slingshot Substructu Mast extended to drilling position.

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

pe Handling System:

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP.

Casing in detail

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

aracteristics of Pipehandling:

Horizontal Pipe Rack Almost unlimited set back area Fits for different tubular sizes Horizontal make up / break out unit saves important operations time. Low noise level because of elimination of monkeyboard No need for dangerous work of Derrickmen

rgen Binder

neral Manager

TECHNOLOGY GOING DEEP

Semi ­ automated pipehandler Iron roughneck Hydraulic powerslips Semi ­ automated catwalk Safe and comfortable driller's cabin

rgen Binder

neral Manager

GEOTHERMAL PROJECTS

DÜRRNHAAR, GERMANY

Rig: TI-350 (B-002, InnovaRig) Two wells: GT1 4393m MD GT2 4530m MD Customer: SGG Operator: Angers und Söhne

rgen Binder

neral Manager

GEOTHERMAL PROJECTS IN GERMANY.

approx. 2000m

rgen Binder

neral Manager

GEOTHERMAL PROJECTS IN GERMANY

45m MD 0m - 45m: 45m ­ 953m: 953m ­ 2180m: 2180m ­ 3726m: 3726m ­ 4393m: Borehole Casing

53m

80m

23" 16" 12 1/4" 8 1/2"

Conductor pipe Casing 18 5/8" Casing 13 3/8" Liner 9 5/8" Liner 7"

26m

93m

rgen Binder

neral Manager

GEOTHERMAL PROJECTS IN GERMANY

0°C hot steam from more than 4000 m below the surface is being produced.

rgen Binder

neral Manager

GEOTHERMAL PROJECTS IN GERMANY

oject Genesys:

B-002: GENESYS, HANOVER 1 well, 3901m Geothermal heat. Noise protection very important due to drilling to urban area, close to BGR.

rgen Binder

neral Manager

rgen Binder

neral Manager

GEOTHERMAL PROJECTS IN GERMANY

days 30 60 90 120

chstockach (B-004) GT1:0

0 500 1000 1500 measured depth [m] 2000 2500

23" Drilling Casing 18 5/8"

16" Drilling Casing 13 3/8"

Kirchstockach Well 1 (planned

12 1/4" Drilling

Kirchstockach Well 1 (101 day

3000

Casing 9 5/8"

3500 4000 4500 5000

Kirchstockach Well 2 (81 day

rgen Binder

neral Manager

SUMMARY ­ WHAT DISTINGUISHES HERRENKNECHT

More than 30 years of engineering know-how New Generation Technology Focus on Safety and Automation Rigs are easy to mobilize Less Personell needed Experience in working in Turkey Track record in Geothermal Projects

rgen Binder

neral Manager

THANKS FOR YOUR ATTENTION

THANKS FOR YOUR ATTENTION

Information

Microsoft PowerPoint - Herrenknecht - Company Profile, Turkey experience.ppt

33 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

566732