Read Microsoft Word - bottomsupgrading_construction.doc text version

Construction Projects: Bottoms Upgrading

Please note that the project statistics here do not include any units under negotiation, in captive markets, or not yet disclosed to the public by licensers or host refiners for confidential reasons. Hydrocarbon Publishing engages in an intensive search for correct and accurate information, but the lack of company notice or publication regarding the conclusion of construction projects results in the assumption of some completion dates. Also, due to sometimes conflicting and/or incomplete information from different sources, it is possible that some of the projects listed are duplicates. The total additional capacity listings are merely estimates since some companies report only the added capacity while others list the total after new capacity has been established. Much of the information is derived from project lists published regularly by Hydrocarbon Processing, Oil & Gas Journal, as well as articles from Worldwide Refinery Business Digest Weekly.e .

Coking

Updated 3Q 2010.

Status (capacity note)a E (New) E (New, coker pillar) E (New, flow meters) Coffeyville Resources ConocoPhillips Coffeyville, KS Los Angeles, CA Rodeo, CA Wood River, IL Ferndale, WA ConocoPhillips/ Encana ExxonMobil Flint Hills Resources Wood River, IL Beaumont, TX Rosemount, MN U (Re, delayed) N.A. (Up) E (New, delayed) P (New) N.A. (Up) U (Ex) C (Re, delayed) E (Ex, delayed) N.A. (New) P (Delayed) Licenser--engineer-- constructor (other contractor)

United States

Company

Location

Est. cost, $MM 3K

Additional capacity, K b/da 2010 2011 2012 2013 & beyond

BP

Whiting, IN

N.A.--Fluor--N.A. (Fluor) N.A.--Foster Wheeler-- FW N.A.--GE Sensing & Inspection Technologies-- GE S&I Tech N.A.--ENGlobal-- AltairStrickland N.A. N.A.--Mustang--Mustang (D-Cok) N.A. N.A. N.A. N.A.--N.A.-- AltairStrickland N.A.--Foster Wheeler-- N.A. N.A. (Foster Wheeler) N.A.--N.A.-- AltairStrickland

102 N.A.

1.1

N.A.

N.A. (N.A.) N.A. N.A. (N.A.) N.A. ('13) 350 4Kb 13 65 N.A. (N.A.) N.A. (N.A.) N.A. (N.A.) N.A. ('13) 25

Kern Oil & Refining Bakersfield, CA LyondellBasell Houston, TX

12

1 OpportunityCrudes.com ©Copyright Protected

Company

Location

Status (capacity note)a C (New, delayed)

Licenser--engineer-- constructor (other contractor) Fluor--Fluor--Fluor (Fluor/Stone & Webster/Flowserve/Pinnacl eAIS) Fluor--Fluor--Fluor ConocoPhillips-- Jacobs/Bechtel-- Jacobs/Bechtel Foster Wheeler--FW--FW Lummus Technology-- CB&I--N.A. Technip--Fluor--N.A. N.A. (Shell Global Solutions/Criterion Catalysts & Technologies) N.A. (Shell Global Solutions/Criterion Catalysts & Technologies) N.A. N.A.--N.A.--Fluor

Est. cost, $MM

Additional capacity, K b/da 2010 40 (Jan.) 2011 2012 2013 & beyond

Marathon Oil Garyville, LA (formerly Marathon Ashland Petroleum) Detroit, MI Motiva Enterprises Port Arthur, TX

P (Ex) E (New, delayed) E (New, delayed) E (Delayed)

1900

28 (Late) 95

Sinclair Oil United Refining Valero Energy

Tulsa, OK Warren, PA

30 14 10 1300 50 (Aug.) 45 (2Q) N.A. (H1) N.A. (N.A.) N.A.

St. Charles (Norco), P (By) LA C (New) Port Arthur, TX P (New)

1300

Western Refining WRB Refining

Yorktown, VA Roxania, IL

P (Ex, delayed) U (Ex)

10

REGIONAL TOTAL NUMBER OF PROJECTS = 23

Canada

114 N.A.--Technip--Technip N.A.--Bantrel--N.A. ConocoPhillips--CB&I-- CB&I N.A. 1K 275

142 N.A.

158

Fort Hills Energy Petro-Canada Suncor Energy Total E&P

Fort Hills, AB Montréal, QB

F (Delayed) E (New, delayed)

25 (Dec)

Fort McMurray, AB E (New, delayed) F Edmonton, AB

REGIONAL TOTAL NUMBER OF PROJECTS = 4

Latin America and the Caribbean

275 Foster Wheeler--FW-- N.A. N.A.--N.A.-- Techint/Andrade Guiterrez N.A. Foster Wheeler--FW--

N.A.

25

N.A. ('15) N.A. 28 (N.A.) N.A. (N.A.)

Repsol YPF Petrobras Petrobras/PDVSA Petropower

La Plata, Argentina E (By) Comperj, Rio de Janeiro, Brazil Abreu e Lima, Brazil Talcahuano, Chilé N.A. (New) N.A. (New, delayed) E (Ex,

1.99K

N.A. (Nov.) N.A.

2 OpportunityCrudes.com ©Copyright Protected

Company

Location

Status (capacity note)a delayed) E (Delayed) F (Delayed) U (Delayed)

Licenser--engineer-- constructor (other contractor) N.A. N.A.--Foster Wheeler-- N.A. Lummus Tech--N.A.-- N.A. Foster Wheeler-- Tecnicas--Tecnicas Foster Wheeler--FW-- N.A. N.A.

Est. cost, $MM

Additional capacity, K b/da 2010 2011 2012 2013 & beyond (N.A.) 54 ('13) 15 ('13) 7.4 (March ) N.A. 25 (Jan.)

Ecopetrol Petrojam Pemex

Barrancabermeja, Colombia Kingston, Jamaica Minatitlán, Mexico Salina Cruz, Oax., Mexico

PetroPeru

P (New, delayed) Talara, Piura, Peru P (New)

P (New, fluid N.A.--Haldor Topsøe, coking) Axens--N.A. REGIONAL TOTAL NUMBER OF PROJECTS = 10

Western Europe

1Kb 25 1.2Kb 7.4 21

20 (Jan.) 20 97

Hellenic Petroleum Statoil

Elefsis, Greece

P (Up, Flexicoker)

EMRE--N.A.--N.A. N.A.--M.W. Kellogg--N.A. N.A.--M.W. Kellogg--N.A.

Mongstad, Norway U (Up; automated unheading) U (Re)

N.A. (2Q) N.A. (2Q) 140.7 (Dec.) 36 N.A. ('13) N.A. ('13) 40 53 60 1K 36 254.7 51.6 111.6 N.A. 20 (N.A.)

Petroleos del Norte Muskiz, Spain (Petronor)

Repsol YPF

E (2.1K mt/d) Foster Wheeler--FW-- N.A. Somorrostro, Spain E (Delayed) Foster Wheeler-- Sener/FW--N.A. P N.A. Bilbao, Spain Tarragona, Spain Vizcaya, Spain P E (New) N.A. Foster Wheeler--FW--FW Foster Wheeler--FW--FW (Foster Wheeler Iberia) N.A. (Foster Wheeler Iberia)

Cartagena, Murcia, U (New) Spain U Lysekil refinery Lysekil, Sweden

F (New; 7.7K FW--Technip--N.A. mt/d) REGIONAL TOTAL NUMBER OF PROJECTS = 11

CIS and Central/Eastern Europe

JSC Naftan

Novopolotsk, Belarus

E (New, delayed)

Foster Wheeler--FW-- N.A.

3 OpportunityCrudes.com ©Copyright Protected

Company MOL Petrom

Location Szazhalombatta, Hungary Ploiesti, Romania

Status (capacity note)a P (Re; 300K t/y) E (Re) E (Re, delayed) E (New) P (Re, delayed) F (Delayed) E (Delayed)

Licenser--engineer-- constructor (other contractor) N.A. N.A.--Foster Wheeler-- FW N.A--Rominserve-- Rominserve N.A.--Foster Wheeler-- FW N.A.

Est. cost, $MM 420

Additional capacity, K b/da 2010 5.008 N.A. (N.A.) 2011 2012 2013 & beyond

ConocoPhillips/Ro Navordi, Romania mopetrol Rafinare CJSC Nizhnekamsk Tatarstan, Russia LUKoil Volgograd, Volgograd Oblast, Russia

50 N.A. N.A.

22

NizhnekamskNeftek Nizhnekamsk, him Tatarstan, Russia Kherson Oil Refinery Kherson, Ukraine

FW

Foster Wheeler--FW--

N.A. 11 5 11 22 20

Lummus Technology-- N.A.--N.A.

The Middle East

REGIONAL TOTAL NUMBER OF PROJECTS = 8 Middle East Oil Refinery KNPC Alexandria, Egypt Mina Al Ahmadi, Kuwait E (Ex, delayed) E (Delayed) N.A.--Technip--N.A. Lummus Technology-- N.A.--N.A. UOP/FW-- Chiyoda/Samsung Eng-- Chiyoda/SE N.A.--N.A.--Tecnicas Reunidas FW--N.A.--N.A. 55

30 (3Q) 37.2

Saudi Aramco Total Jubail, Saudi Arabia E (New, delayed) Refining & Petrochemical Co. Saudi P (New) Yanbu, Saudi Aramco/ConocoPhil Arabia lips Petkim/SOCAR/Tur Aliaga, Turkey F (Delayed) cas REGIONAL TOTAL NUMBER OF PROJECTS = 5 Sonatrach Egyptian Refining Co. Middle East Oil Refinery Skikda, Algeria N.A., Egypt E P (New)

900

100 (June '13) N.A. (N.A.) 40 ('14) 30 37.2 0 30 N.A. (N.A.) To 30 (3Q) 30 0 30 N.A. 140

Africa

Axens/GTC--Samsung Eng--Samsung Eng N.A. N.A.--Technip--Technip

Midor, Alexandria, U (Ex) Egypt REGIONAL TOTAL NUMBER OF PROJECTS = 3 Liaoning Huajin Chemicals Panjin, China

Asia-Pacific

E (1.2MM t/y) LPEC--LPEC--Liaoning Huajin Chem

20

4 OpportunityCrudes.com ©Copyright Protected

Company PetroChina Sinochem Sinopec

Location

Status (capacity note)a

Licenser--engineer-- constructor (other contractor) N.A. N.A. N.A. N.A. N.A. N.A. Lummus Technology-- N.A.--N.A. N.A.--Jacobs Engineering--Jacobs Engr. Lummus Technology-- CB&I/Aker Kvaerner Powergas--Essar Proj N.A.--L&T--L&T N.A.--Jacobs Engineering--Jacobs Engr. N.A. Indian Oil--FW--Jacobs Engineering N.A. N.A. N.A.

Est. cost, $MM 148

Additional capacity, K b/da 2010 43 (Oct.) 25.7 27.5 (N.A.) N.A. (July) 37 (N.A.) 44 (Oct.) 25 2011 2012 2013 & beyond

Fushun, Jilin, China C (New) Quanzhou, China Luoyang, China Tahe, China Wuhan, China Xinjiang, China N.A. (New) N.A. (New) C (Ex) N.A. (New) N.A. (Ex) E (Delayed) N.A. (Delayed) U (Delayed; 6MM t/y) U (New)

Bharat Oman Refineries

Bina, Madhya Pradesh, India

Chennai Petroleum Manali, India Essar Oil Vadinar, Gujarat, India Bhatinda, Punjab, India Guwahati, Assam, India Barauni, Bihar, India Paradip, Orissa, India Haldia, West Bengal, India Cosmo Oil Pakistan Refinery Ltd. Formosa Petrochemical Sakai, Japan Karachi, Pakistan Mailiao, Taiwan

650 100.2 (H1) N.A. (H1) 60 N.A. (By) 350 68.4

N.A. (N.A.)

Hindustan Petroleum/Mittal Energy Indian Oil

E (New, delayed) N.A. (New) U (New, delayed; 4.1 MM t/y) U (New) C (New) P (Delayed)

N.A. (N.A.)

50+ 25 (Feb.) N.A.

1500

N.A. 402 N.A. P (New, (End) delayed) REGIONAL TOTAL NUMBER OF PROJECTS = 18 183 125.2 94.1 64.5 WORLDWIDE TOTAL NUMBER OF PROJECTS = 82 698 577.5 460.7 321.5 WORLDWIDE TOTAL NEW CAPACITY 2,035.7 aCapacity is given in thousands of b/d; if capacity was given in other terms, it has been converted to K b/d for the Additional capacity columns, but given in the original denomination as a capacity note in italics. Conversions were based on the assumption that 7.5 bbl is bCost includes other projects. equivalent to 1 mt of gas oil or diesel output. C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion. Up: upgrade.

5 OpportunityCrudes.com ©Copyright Protected

Resid Fluidized Catalytic Cracking

Updated 4Q 2009.

Status (capacity note) Licenser--engineer-- constructor (other contractor) Est. cost, $MMb Additional capacity, K b/da 2009 2010 2011 2012 & beyond 5.9 (N.A.) N.A. (N.A.) 5.9 60 ('12) N.A. ('13) 46.7 ('14) 106.7 13.7 ('13) N.A. N.A.

Company

Location

Latin America and the Caribbean

Petrobras Petrobras

Rio de Janeiro, Brazil São Paulo, Brazil

P (Resid; 280K t/y) E (Resid)

Shaw--Shaw--N.A. KBR/ExxonMobil--N.A.-- N.A.

The Middle East

REGIONAL TOTAL NUMBER OF PROJECTS = 2 Qatar Petroleum Abu Dhabi Refining (Takreer) Al Shaheen, Qatar F (New, resid) Axens--Shaw E&C--N.A. E (Ex, resid) N.A.--GS Engineering & Ruwais, Abu Dhabi, UAE Construction--GS E&C N.A.

3.1K

Abu Dhabi Refining Ruwais, Abu N.A. (New, (Takreer) Dhabi, UAE resid) REGIONAL TOTAL NUMBER OF PROJECTS = 3 Yanchang Petroleum Group Chennai Petroleum Hindustan Petroleum/Mittal Energy Investments Pertamina Taiyo Oil Shell Eastern Petroleum Hyundai OilBank S-Oil Nghi Son Refinery PetroVietnam Shaanxi, China N.A., India Bhatinda, India F (By; DCC)

Asia-Pacific

Shaw--SEIC--N.A.

P (New resid) N.A. U (New; N.A.--L&T--L&T (Shaw DCC) Group) N.A. (Up, resid) P (New, resid) E (Re, resid) P (Resid) P (New, resid) E (Resid) U (New, resid) N.A. (Itochu/Toyo Engr./Rekayasa Industri) N.A. N.A.--Chiyoda Singapore-- Chiyoda Singapore N.A. N.A. Axens--N.A.--N.A. Axens/IFP-- Technip/JGC/Tecnicas-- Technip/Tecnicas/JGC 69.7

Balongan, Indonesia Shikoku, Japan Pulau Bukom, Singapore Sosan, South Korea Onsan, South Korea Thanh Hoa, Vietnam Dung Quat, Quang Ngai, Vietnam

N.A. (Mid) 426.5 (¥50B) 25 ('14) N.A. (N.A.) 2Kb 3.74Kb 60 75 N.A. ('13)

REGIONAL TOTAL NUMBER OF PROJECTS = 10 WORLDWIDE TOTAL NUMBER OF PROJECTS = 15 WORLDWIDE TOTAL NEW CAPACITY

69.7 69.7

135 135 356

38.7 151.3

6 OpportunityCrudes.com ©Copyright Protected

Company

aCapacity

Location

Status (capacity note)

Licenser--engineer-- constructor (other contractor)

Est. cost, $MMb

Additional capacity, K b/da 2009 2010 2011 2012 & beyond

is given in thousands of b/d; if capacity was given in other terms, it has been converted to K b/d for the Additional capacity columns, but given in the original denomination as a capacity note in italics. Conversions were based on the assumption that 8.5 bbl is equivalent to 1 mt of gasoline output. bCost includes other projects. C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion. Up: upgrade.

Resid Hydrocracking

Updated 3Q 2010.

Status (capacity note)a U (New, resid) Licenser--engineer-- constructor (other contractor)

Canada

Company

Location

Est. cost, $MM

Additional capacity, K b/da 2010 2011 2012 2013 & beyond

North West Upgrading

Edmonton, Sturgeon County, AB

Chevron Lummus Global-- CLG--KBR (UOP)

32 77 10

Shell Canada

Scotford upgrader, Ft. Saskatchewan (near Edmonton), AB REGIONAL TOTAL NUMBER OF PROJECTS = 3 LUKoil Bourgas, Bulgaria

E (Resid, LC- Chevron Lummus Global-- FINING) CLG--N.A. U (Resid) Chevron Lummus Global-- Bechtel/Bantrel--PCL

119

CIS and Central/Eastern Europe

E (New, resid) U (Resid)

Axens--Technip--N.A. Chevron Lummus Global-- CLG--Lummus Technology

7

INA Industrija Nafte Sisak, Croatia

20 ('13)

REGIONAL TOTAL NUMBER OF PROJECTS = 2

Asia-Pacific

7 Chevron Lummus Global-- GS E&C--GS E&C N.A. 60 22K 60 (June) 60 179

20

GS Caltex

Yeosu, South Korea

E (Resid)

Yosu, South Korea N.A. (Resid)

REGIONAL TOTAL NUMBER OF PROJECTS = 2 60 WORLDWIDE TOTAL NUMBER OF PROJECTS = 7 60 7 20 WORLDWIDE TOTAL NEW CAPACITY 266 aCapacity is given in thousands of b/d; if capacity was given in other terms, it has been converted to K b/d for the Additional capacity columns, but given in the original denomination as a capacity note in italics. Conversions were based on the assumption that 7.5 bbl is

7 OpportunityCrudes.com ©Copyright Protected

Company

Location

Status (capacity note)a

Licenser--engineer-- constructor (other contractor)

Est. cost, $MM

Additional capacity, K b/da 2010 2011 2012 2013 & beyond

equivalent to 1 mt of gas oil or diesel output. C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion.

Up: upgrade.

Resid Hydrotreating

Updated 2Q 2010.

Status (capacity note)a F (Resid) Licenser--engineer-- constructor (other contractor)

United States

Company

Location

Est. cost, $MM

Additional capacity, K b/da 2009 2010 2011 2012 & beyond 42 (N.A.) 42

BP

Toledo, OH

KBR--KBR--N.A.

The Middle East

REGIONAL TOTAL NUMBER OF PROJECTS = 1 Esfahan Oil Kuwait National Petroleum Esfahan, Iran E (Resid) Axens--Namvaran/HEC-- N.A. Chevron Lummus--N.A.-- N.A. Chevron LG--Chevron LG--N.A. Axens--N.A.--N.A.

Asia-Pacific

74

80 ('12) 150 (N.A.) 50 51 ('12) 281 48 ('13) 48 40 (Sept. '12) 40.4 (N.A.) 53.5

Mina Abdulla, P (Re, resid) Kuwait Mina al Ahmadi, P (Re, resid) Kuwait Qatar Petroleum Al-Shaheen, Qatar F (Residue) REGIONAL TOTAL NUMBER OF PROJECTS = 4 PetroChina (CNPC) Sichuan, China Sinochem Sinopec Quanzhou, China Anqing, China Luoyang, China Qingdao, China Hyundai Oil Refinery Daesan, South Korea Sosan, South Korea Nghi Son, Vietnam U (Resid) U (Residue) P (New, Resid) N.A. (Residue) P (Residue; 2.6MM mt/y) U (New, resid) N.A. (New, residue) U (Resid)

50 Chevron LG--Chevron LG--N.A. Chevron LG--Chevron LG--N.A. N.A. N.A. Chevron Lummus--N.A.-- N.A. Chevron LG--Chevron LG--N.A. (Shaw Group) N.A. Chevron LG--Chevron LG--N.A. 53.5 53.5 48 48 66 116

1.47Kb N.A.

66 (June)

Nghi Son Refinery

105 ('13) 233.4 556.4

REGIONAL TOTAL NUMBER OF PROJECTS = 8 WORLDWIDE TOTAL NUMBER OF PROJECTS = 13

8 OpportunityCrudes.com ©Copyright Protected

Company

Location

Status (capacity note)a

Licenser--engineer-- constructor (other contractor)

Est. cost, $MM

Additional capacity, K b/da 2009 2010 2011 2012 & beyond

WORLDWIDE TOTAL NEW CAPACITY 773.9 aCapacity is given in K b/d; if capacity was given in other terms, it has been converted to K b/d for the additional capacity columns, but given in the original denomination as a capacity note in italics. Conversions were based on the assumption that 1 mt of gasoline = 8.5 bbl, 1 mt ULSD/diesel/gas oil/VGO = 7.5 bbl, 1 mt light ends/LPG = 11.63 bbl, 1 mt kerosene = 7.8 bbl, and 1 mt resid/fuel oil = 6.7 bbl. bCost includes other projects C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion. Up: upgrade.

Solvent Deasphalting

Updated 2Q 2010.

Status (capacity note)a Licenser--engineer-- constructor (other contractor)

Western Europe

Company

Location

Est. cost, $MM 670

Additional capacity, K b/da 2009 2010 2011 2012 & beyond 15 (N.A.) 0 0 45 (Nov.) N.A. ('12) N.A. ('12) 0 45 0 N.A. 0 15

Eni

Sannazzaro, Italy P (New, ROSE) REGIONAL TOTAL NUMBER OF PROJECTS = 1 Grupa Lotos Mariisky NPZ Gdansk, Poland Mari El, Russia U (New, ROSE) U (New)

KBR--N.A.--N.A.

CIS and Central/Eastern Europe

KBR--N.A.--N.A. Foster Wheeler--Shell Global Solutions International--N.A.

Mariisky-NPZ

F (New, propane) N.A.--Vnipineft--N.A. Yoshkar-Ola, Russia REGIONAL TOTAL NUMBER OF PROJECTS = 3

Asia-Pacific

Hindustan N.A. Mumbai, India U (New, propane) KBR--KBR--KBR Petroleum (N.A.) REGIONAL TOTAL NUMBER OF PROJECTS = 1 0 0 0 N.A. WORLDWIDE TOTAL NUMBER OF PROJECTS = 5 0 45 0 15 WORLDWIDE TOTAL NEW CAPACITY 60 aCapacity is given in thousands of b/d; if capacity was given in other terms, it has been converted to K b/d for the Additional capacity columns, but given in the original denomination as a capacity note in italics. bCost includes other projects. C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion. Up: upgrade.

9 OpportunityCrudes.com ©Copyright Protected

Visbreaking

Updated 4Q 2010.

Status (capacity note)a E (New) Licenser--engineer-- constructor (other contractor) Lummus Technology/Shell--CB&I Lummus/Aker Solutions/Saipem--Saipem

Western Europe

Company

Location

Est. cost, $MM 600b

Additional capacity, K b/da 2010 2011 2012 2013 & beyond 3 ('13) 0 0 0 3

Latin America and the Caribbean

Staatsolie

Paramaribo, Surinam

REGIONAL TOTAL NUMBER OF PROJECTS = 1 Galp Energia Leca da Palmeira, Porto, Portugal Sines, Portugal U (New) E (Re) N.A.--Lumus--Fluor N.A.--Technicas Reunidas--Technicas Reunidas Shell--Technip--N.A.

14.6 (Oct.) N.A.

Preemraff Lysekil

F (To, 8K mt/d) REGIONAL TOTAL NUMBER OF PROJECTS = 3 LUKoil Kstovo, Nizhny (Up) Novgorod REGIONAL TOTAL NUMBER OF PROJECTS = 1 Saudi Aramco

Lysekil, Sweden

53.6 14.6 53.6 N.A. 0 N.A. 0 0 0 0

CIS and Central/Eastern Europe

N.A.

The Middle East

Ras Tanura, Saudi F (two trains) 120 Arabia REGIONAL TOTAL NUMBER OF PROJECTS = 1 0 0 120 0 WORLDWIDE TOTAL NUMBER OF PROJECTS = 6 14.6 53.6 120 3 WORLDWIDE TOTAL NEW CAPACITY 191.2 aCapacity is given in thousands of b/d; if capacity was given in other terms, it has been converted to K b/d for the Additional capacity columns, but given in the original denomination as a capacity note in italics. bCost includes other projects. C: completed. E: engineering. P: planning. U: under construction. By: amount of capacity increase. Ex: expansion. Re: revamp. To: total capacity after project completion. Up: upgrade.

10 OpportunityCrudes.com ©Copyright Protected

Information

Microsoft Word - bottomsupgrading_construction.doc

10 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

1254165


You might also be interested in

BETA
Microsoft Word - bottomsupgrading_construction.doc
HP09 Optimize coker operations
Main menu 2.indd