Qatar Precast Co., LLC.

Introduction

Qatar Precast Co., LLC., was established in January 1998, as a fully operational production unit to manufacture precast concrete products such as prestressed Hollow Core Slabs & Beams and also columns, solid slabs, stairs, walls, parapets and architectural claddings.

The Group of Companies

Qatar Precast Co., LLC., is part of the Qatar Readymix Group of Companies which consist of; · · · Qatar Readymix Qatar Quarry Qatar Precast

All companies are part of a joint venture Company between Lafarge Readymix International and Sheikh Hamad Abdulla M.J. Al-Thani.

Lafarge

Lafarge is world's no. 1 producers of Cement & Roofing, Aggregates & Concrete and Gypsum products, with workforce of 80,000 people and is present is 76 countries worldwide. With the sales of 16 billion in 2005, the company is listed in both Paris and New York Stock Exchange.

The Company

Qatar Precast Co., LLC., continues to be no. 1 producer and supplier in precast concrete products, particularly with prestressed hollow core slab, columns, beams and stair. The company employs 48 technical staff and 300 skilled workers, due to the commitment with projects all over the country. It has a dedicated site Project Engineers and Safety Officer, working in dedication to offering economic Engineered Solutions in High Standards for customer service and Health & Safety.

Experience in Brief

Qatar Precast Co., LLC., experience varies widely to cater everyone needs, be it private individual, private company(local or international), government institution, military facilities & installation. To name some of them will be, Qatar Petroleum, RasGas, Ministry of Education, Ministry of Interior, Lulu Shopping Center, Ministry of Awqaf, Al Udied Air Base, Hamad Medical Corporation, New Doha International Airport etc..

Issue # 1 of 2007

1

Our Service

Qatar Pm\recast Co., LLC., offer a service more than just a manufacturing company. Our service includes design, produce, deliver and install. The in-house design team, production team and construction team consists of competent managers, civil engineers and architects, whose experience includes not only in Qatar but in other countries as well. Our technical knowhow and expertise makes the company leading in providing precast building solution.

Service In Action

Qatar Precast Co., LLC., make sure that from sales to construction all project have been carefully collaborated with sales, design, engineering, production and construction right from the day one an enquiry has been logged. Making the complete process runs smoothly whenever is implemented.

The Management

Qatar Precast Co., LLC., is safety customer service experience management team, making it an organization that always a leader in implementing any technological advance in construction industry. We offer innovative solutions for the construction industry and general public, bringing greater safety, comfort and quality to their everyday surroundings.

The Quality

Qatar Precast Co., LLC., on its own guiding principles maintains and adopts international quality procedures and standards. By adopting and implementing international procedures such as, Federation Internationale de la Precontrainte , PCI Manuals, BS standards, ACI standards and others which pertain to precast concrete and its components. Assuring that all products that is dispatch from our factory are of quality. Qatar Precast Co., LLC., experience speaks quality through our delivered products and engagement with some of the international companies and consultants.

The Health and Safety

Qatar Precast co., LLC., because of its association with international company like Lafarge adheres to international standard in observing and health and safety measures in the company factory premises to job sites. All products are being studied to conform with the company's health and safety assurance to the general public and environment.

The Challenges

In the year 1998, Qatar Precast Co., LLC., has approached various contractors and finally with the Ministry of Education. As a result, we have succeeded in changing from cast insitu slabs to prestressed hollowcore slab. As a landmark project in Qatar, it was highly talked about and soon the attitude of the people in construction industry change. It was when the time the precast solution is not widely accepted in Qatar. The project is a two storey building in various locations.

Issue # 1 of 2007

2

In the year 2000, when Al Jaber Trading & Contracting with Qatar Real Estate Investment Company, asked Qatar Precast Co., LLC., to provide precast solution for Mesaieed Labor Camp. The project was provided with prestressed hollow core slab. The project consists of different type of single and two storey common dwelling.

In the year 2001, Mideast Constructors and Technip Engineering has approached Qatar Precast Co., LLC., to produce and deliver precast concrete columns and beams for the Sulfur Recovery Project at Ras Laffan Industrial City. As a response, we created a team of designers and engineer to cater the requirement in time. At first we were amazed of the units not to mentioned the each unit has to have at least 3 or more insert plates being a minimum weight to be 40 kgs. By utilizing steel molds, two mobile crane just to lift and lay the cages of reinforcement, we were able to be ahead of time in completing our commitment. The quality requirement of the produce unit was so stiff due to the delicate final environment. In the year 2002, Qatari Arabian Construction Company and White Young Qatar with the Ministry of Defense when Qatar Precast was contacted to provide precast solution for the floor and roof deck. The project was the Al Udeid Air Base. As a results, when have supplied prestressed hollow core slab for more than 30 different building inside the said military installation. In the same year of 2002, Qatar Precast Co., LLC., has successfully engage and provided a precast solution for the multi-storey car parking for Hamad Medical Corporation located at Rumaillah, proving that precast can be integrated even in a most dynamic building use. In the year 2003, Al Muftah Contracting and Qatar Design Consortium contacted Qatar Precast Co., LLC., with the construction plan for Qatar Petroleum headquarters in Dukhan, it was agreed that the original design of Double Tee for floor and roof deck be design with the alternative of using prestressed hollow core slab. Upon collaboration with the design, engineering and construction and coordination with the Qatar Design Consortium, we come up with the precast solution of precast prestressed beams and hollow core slab. By the use of the precast the contractor has significantly reduced time and money for the completion of the project, noting that the complete headquarters is composed of three tangent circles. The project consists of three multi storey circular buildings. In the year 2004, another challenge was up for Qatar Precast Co., LLC., that the project with Oriental Enterprises with Qatar Petroleum as a client is to supply prestressed hollow core slab in the island of Halul. The precast products used have to be transported by land and sea. The project is for senior staff accommodation and consists of buildings. In the year 2005, Joannu & Paraskevaides Overseas Ltd., and KEO International Consultant and Qatar Foundation as client, has contacted Qatar Precast Co., LLC., to produce, supply, deliver and install a

Issue # 1 of 2007

3

prestressed girder with a length of 22 m. Again, Qatar Precast Co., LLC., has contributed to the timely completion of the project. The said project is located at the Qatar Foundation's Science and Technology Park. In the same year 2005, when due to demand in the labor accommodations in the industrial estate that we come up with precast solution for the private individual and company. It where we provide the most complete precast solution for a building, consisting of precast columns, beams, stair, hollow core slabs and parapet wall. The said system is now widely accepted, that it has spread in the country not only for labor accommodations, but for villas as well. We have now projects to be supllied with precast items as far as Al Thakira. In the year 2006, Zublin International and Maunsell AECOM with Qatar Real Estate Investment Company as client, Qatar Precast Co., LLC., provided precast solution for the project with precast beams and solid slab and prestressed hollow core slab. The project Mesaieed Housing for Staff Accomodation, consisting of single, two storey villas and three storey buildings. In the same year 2006, Gulf Housing & Construction with KEO International and CCIC with Khatib Alami and Bechtel Overseas as consultant approved Qatar Precast Co., LLC., as a producer and supplier for precast products such as prestressed hollow core slab and precast cladding panel for the New Doha International Airport. Currently, Qatar Precast Co., LLC., is supplying prestressed hollow core slab in the project site. The project consists of different multi-storey buildings. Today, Qatar Precast Co., LLC., is engage with Gulf Housing & Construction for the Qatar Transmission Expansion project of different substation locations in the country, supplying prestressed hollow core slab as a solution for roof deck. With Al Seal Contracting for supplying precast stairs for the Twin Palm Tower at West Bay, also with the precast parapet of the ZigZag Towers at West Bay Lagoon. With Zublin International, for another package in Mesaieed Housing project. The list of our current and ongoing project all over the country would exceed 140 different jobs, from private individual to government institution like NDIA. This only proves that our clients are satisfied with the services and products we offer. The challenges we have and prevailed upon will only make us more efficient in delivering our commitment. Qatar Precast Co., LLC., would not just warrant in continuing to do so, but to strive even more for excellence with our service and products.

Issue # 1 of 2007

4

Qatar Precast Co. L.L.C. Key Staff

Issue # 1 of 2007

5

ACCOUNTS Mr. H. K. Madhu (Sr. Accountant) Mob. : 5845261 [email protected]

HEALTH AND SAFETY LIYAKATALI AGA Health and Safety Supervisor Mob. : 6013790 [email protected] CONSTRUCTION SUPERVISOR James Tilley Mob: 5897801 [email protected]

MR. ALAN B. MOORE Company Manager Mob.: 5532661 [email protected]

SALES Mr. Gilbert Canete Senior Sales Manager Mob.: 5524607 [email protected] Design Joel Panganiban Design Engineering Manager Mob: 5838501 [email protected] Production Jacques Bezuidenhout Production Manager Mob: 5800159 [email protected] TECHNICAL Mr. Henrik Littau Technical Manager Mob. : 5826376 [email protected]

CONSTRUCTION COORDINATOR Alma Bernales Mob.: 5030017 [email protected]

COMPANY PLANNING MANAGER Robert Wilkinson Mob.: 6005941 [email protected]

Issue # 1 of 2007

6

Qatar Precast Co., LLC., Factory

Issue # 1 of 2007

7

The Qatar Precast factory

Stressing strand prior to casting hollow core slab.

Issue # 1 of 2007

8

Preparing girder molds prior to casting.

Precast concrete beam ready for casting.

Issue # 1 of 2007

9

Cutting of hollow core slab.

Hollow core slab on board for delivery.

Issue # 1 of 2007

10

Prestressed girder on board for delivery.

Hollow core slab under load test.

Issue # 1 of 2007

11

Prestressed Hollow Core Slab Load Table Capacities And Geometric Properties

Issue # 1 of 2007

12

Issue # 1 of 2007

13

Issue # 1 of 2007

14

Issue # 1 of 2007

15

Issue # 1 of 2007

16

Issue # 1 of 2007

17

Typical Precast Concrete Connection Details

Issue # 1 of 2007

18

Issue # 1 of 2007

19

Issue # 1 of 2007

20

Issue # 1 of 2007

21

Issue # 1 of 2007

22

Issue # 1 of 2007

23

Issue # 1 of 2007

24

Pictures for some Completed Projects

Issue # 1 of 2007

25

Precast Columns are propped ready to receive grout.

Near completed precast building consisting of columns, beams, stairs, solid slab & hollowcore slab.

Issue # 1 of 2007

26

Prestressed Beam being lifted to position.

Project being completed with prestressed beam and hollowcore slab.

Issue # 1 of 2007

27

Installed Prestressed Girder prepared for grouting.

Near completed project with prestressed girder.

Issue # 1 of 2007

28

Precast Column are being erected.

Labour Accommodation

Issue # 1 of 2007

29

Prestressed Girder being erected to place.

Prestressed hollow core slab erected over prestressed beam.

Issue # 1 of 2007

30

Erection of prestressed hollow core slab over precast load bearing wall.

Precast wall and hollow core slab.

Issue # 1 of 2007

31

Prestressed hollowcore slab erection over prestressed beams.

Near completed floor erection of prestressed beam and hollow core slab.

Issue # 1 of 2007

32

A multi-storey car park with prestressed hollow core slab as floor and decking.

A view for the finished project using precast solution.

Issue # 1 of 2007

33

Precast Boundary Wall for Substations

Precast Boundary Wall with hollow core slab.

Issue # 1 of 2007

34

Precast Boudary Wall for Schools.

Precast Boundary Wall for Qatar Standard.

Issue # 1 of 2007

35

Precast Wall Cladding & Precast Load Bearing Wall Panel-Mesaieed International School

Precast Wall Cladding & Precast Load Bearing Wall Panel-Mesaieed International School

Issue # 1 of 2007

36

Stairs at Office Building - IBA

Parapet Wall Parapet - Zigzag Tower

Issue # 1 of 2007

37

Beams - BUTEC

Boundary Walls ­ UCO

Issue # 1 of 2007

38

Office Building - C Ring Road - IBA

Office Building - C Ring Road ­ IBA

Issue # 1 of 2007

39

Precast Boundary Wall for School

Precast Boundary Wall for Kharamaa

Issue # 1 of 2007

40

Precast Load Bearing Wall Panel ­ Community School

Mesaieed Precast Load Bearing Wall Panel - Community School Mesaieed

Issue # 1 of 2007

41

Lists of Completed Projects

Issue # 1 of 2007

42

Completed Projects: Wall Cladding & Parapet Walls

Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value : : : : : : : : : : : : : : : : : : : : Precast Wall Cladding & Precast Load Bearing Wall Panels ­ Mesaieed Int'l Sch. Al Jaber Trading and Contracting MAUNSELL QRS. 1,995,000.00 Precast Wall Parapet at Zigzag Tower Al Seal Trading & Contracting MZ Partners

Precast Wall Cladding and Precast Window Sills ­ American Air Base Al Udeid Qatar Arabian Contracting Company Qatar Arabian Contracting Company QRS. 5,650,000.00 Precast Wall Al Ansari Group Arabian Engineering Bureau QRS. 3,500,000.00 Parapet Wall BUTEC Ali Khanat QRS. 436,000.00

Issue # 1 of 2007

43

Completed Projects: Boundary Walls

Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value : : : : : : : : : : : : : : : : : : : : : : : : : : : : Architectural Boundary Wall Madena Mechanical Madena Mechanical Qrs. 720,000,000 Boundary Wall for Private Villa Merlin Contracting Qrs. 150,000,000 Boundary Wall for Awfaq Housing Qatar Building Engineering AEB Qrs. 120,000,000 Boundary Wall Al Seal AEB Qrs. 720,000,000 Boundary Wall for Government Schools Various Contractors BED Qrs. 8,500,000.00 Boundary Wall for Multipurpose Indoor Stadium at Dukhan Al Mana Engineering Qatar Petroleum Qrs. 100,000.00 Boundary Wall Amana Steel Buildings & Contractor AEB Qrs. 190,000.00

Issue # 1 of 2007

44

Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value Product Contractor Consultant Value

: : : : : : : : : : : : : : : : : : : : : : : : : : : :

3 nos. ASHGAL Elementary School ­ Boundary Wall ITC MICA Qatar Qrs. 4,579,000.00 4km HCS Boundary Wall GulfWarehousing Qrs. 3,575,000.00 5km HCS Boundary Wall UCO Qrs. 3,397,000.00 4 nos. ASHGAL Elementary School ­ Boundary Wall UCE Consulting Engineering Group Qrs. 3,397,000.00 4km HCS Boundary Wall RAMACO RAMACO Qrs. 775,000.00 HCS Boundary Wall MIDMAC Qrs. 446,000.00 Sheik Hamad Boundary Wall GG22 GG22 Qrs. 2,300,000.00

Issue # 1 of 2007

45

COMPLETED PROJECTS: MULTI STOREY BUILDINGS

Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area : : : : : : : : : : : : : : : : : : : : : : : : : White Young Qatar Gulf Housing British Bank of the Middle East 7 Storey Building 8,000sq.m. United Consultants Al Ali Projects Qatar Foundation Apartment Building for Qatar Foundation 28,000sq.m. Modern Design Ismail Bin Ali Trading & Contracting Ismail Bin Ali Trading & Contracting 3 ­Storey Building at Salwa Road 2,000sq.m. Petra Design Al Misnad Building Owner Apartment Building 4,500sq.m. Consulting Engineering Group Al Warthan Building & Trading H.E. Sheik Fahad Bin Abd. Al Thani 3 ­ Storey Building 3,000sq.m.

Consultant Contractor Client Project Area

: : : : :

Consulting Engineering Group Mannai Engineering H.E. Sheik Khalid 13 ­ storey Office Building 12,000sq.m.

Issue # 1 of 2007

46

Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area

: : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

Consulting Engineering Group Lotus Contracting & Trading H.E. Sheik Fahad Bin Abd. Al Thani 3 ­ Apartment Building 6,500sq.m. Arab Engineering Bureau Construction Development Company Ministry of the Interior 20 ­Storey Building 9,000sq.m. Cico Consult Contraco H.E. Sheik Abdulla Bin Khalifa Al Thani 19- Storey Building 12,000sq.m. Consulting Engineering Group Hamad Al Attiyah & Sons Hamad Al Attiyah & Sons Apartment Building ­ G +6 6,500sq.m. Alpha Engineering Associates Darwish Eingineering Qatar Navigation & Transport 4 Storey Office Building 13,500sq.m. Consulting Engineering Group Al Qafila H.E. Sheik Fahad Bin Abd. Al Thani 10 ­ Storey Building at Muntaza 11,000sq.m.

Issue # 1 of 2007

47

Completed Projects: Schools, Hospitals, Staff Accommodations

Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : Qatar Design Consortium Al Jaber Engineering Qatar Real Estate Labor Accommodation at Messaieed 16,000sq.m.

Union Construction Building owner Labor Accommodation at Industrial Area 1,300sq.m. Consulting Engineering Group Abdulla Hamad Al Attiyah & Sons Abdulla Hamad Al Attiyah & Sons Store and Laobr Accommodation at Industrial Area 850sq.m.

Al Jabeer Engineering Al Jabeer Engineering Labor Accommodation at Salwa 1,700sq.m.

Al Misnad Contracting & Trading Mr. Abdulla Nasser Staff Accommodation at Salwa Road 50sq.m.

Shannon Contracting Shannon Contracting Labor Accommodation 200sq.m.

Issue # 1 of 2007

48

Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area

: : : : : : : : : : : : : : : : : : : : : : : : : : : : : :

Ramco Ramco Labor Accommodation 700sqm. Amana Amana Steel Building Owner Labor Accommodation at Salwa Road 1,000sq.m.

Al Taquddum Trading Building Owner Labor Accommodation at Industrial Area 750sq.m. BED Tadmur Hamad Hospital Hamad Hospital Laundry Roof 650sq.m. Qatari Home Design & Engineering Esmail Bin Ali Contracting & Trading Esmail Bin Ali Contracting & Trading Residential Building Ground Plus One Roof 400sq.m. Armed Forces Works Engineering Unit Al Misnad Qatar Armed Forces Qatar Army HQ Building 350sq.m.

Issue # 1 of 2007

49

Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area Consultant Contractor Client Project Area

: : : : : : : : : : : : : : : : : : : : : : : : :

White Young Qatar AKC Contracting Doha Clinic Extension to Doha Clinic 5,000sq.m. Durat Al Handasa Mr. Mohammad Ali Al Shebab Qatar Gulf Enterprise Residential Building 600sq.m. Qatar Design Consortium GETTCO Gulf English School Gulf English School 3,500sq.m. Gulf Style Engineering Al Bateel Engineering & Contracting Building Owner Private School at Old Airport Area 8,000sq.m. BED TADMUR BED Boys Elementary School 3,5000sq.m.

Issue # 1 of 2007

50

COMPLETED PROJECTS: MOSQUES & IMAM HOUSES

Consultant Contractor Client Project Area : : : : : Qatari Home Design & Engineering Esmail Bin Ali Contracting & Trading Esmail Bin Ali Contracting & Trading Mosque Roof at Al Jasra 424sq.m.

Consultant Contractor Client Project Area Consultant Contractor Client Project Area

: : : : : : : : : :

BED Esmail Bin Ali Contracting & Trading BED Mosque Type M 118 Roof 200sq.m. Petra Design TADMUR Mosque at Ain Khalid 500sq.m.

Issue # 1 of 2007

51

Acknowledgement

We would like to acknowledge and thanks those people, companies and institutions alike who contributed and trusted Qatar Precast Co., LLC., for its success story be it directly mention here or not, we are grateful . Many of whom we will never have time and opportunity to express our gratitude, but you are always be a part of our story. Many will be in times to come be a part to the challenges of the company; it is just the same, we are grateful to have you.

Issue # 1 of 2007

52

Information

untitled

52 pages

Find more like this

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

451710


You might also be interested in

BETA
untitled