Sample Installation Diagram for use with Swimming Pools and Hot-tubs

Building heating zones

V-3 Thermometer

Pool / Hot-tub water flow

SEC Heat Exchanger PL-series

Boiler water flow direction

By-Pass, to be activated during `chemical shock' Open V-2 then close V-1 and V-3 V-2

Boiler

Boiler circulator activated by Pool temperature controller

Boiler water flow direction

V-1

Temperature Controller

Pool / Hot-tub water flow

Pool / Hot-tub Pump

Filter

NOTES: - damage to the heat exchanger due to improper water chemistry is not covered under the S.E.C. warranty. - Chlorine feeder, if installed. MUST be located downstream of the heat exchanger, and be installed with an anti- siphoning device, to prevent chlorine from backing up into the heat exchanger. - This is only a conceptual drawing provided as a guide. Actual installation must comply with local code requirements. - A qualified installer, certified to local regulations, must assess each individual installation and design a working system which will operate in accordance with the suggested installation diagram and these notes.

S.E.C. Heat Exchangers Systems Equipment Corporation 2546 Iona Road, Belfast Prince Edward Island Canada C0A-1A0

Tel; 902-659-2424

Fax; 902-659-2800

www.heatexchangers.ca

Information

Visio-Pool or Hot tub install drawing Rev-1 August 03-04.vsd

1 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

391277


You might also be interested in

BETA
Document
AQUA-THERM MANUAL (0109)