APPENDIX B: ACTIVE SOLAR APPLICATIONS B.1 BACKGROUND The U.S. Department of the Interior (DOI) Bureau of Land Management (BLM) has received more than 300 applications for right of way (ROW) authorizations for utility-scale solar facilities to be located on BLM-administered lands. Some of these applications are being processed in accordance with BLM's existing policies (see Appendix A, Section A.1), while some applications cannot currently be processed because they describe lands already applied for by another company. Other applications have been terminated because the developer withdrew the application or because due diligence requirements were not met. The BLM is processing the remaining applications during the preparation of this PEIS, but it is planning to incorporate the program established through this PEIS into the processing of applications that occurs subsequent to the release of the Record of Decision. As of February 2010, the BLM had 127 active applications for ROW authorizations for solar facilities.1 These active applications are shown in Table B-1. The majority of the applications are for parabolic trough or power tower facilities. There are also about 30 applications for photovoltaic (PV) facilities and 3 applications for dish engine facilities. Fourteen of the active applications are being processed as "fast-track" projects (BLM 2010).2 These projects are applications for which the companies involved have demonstrated to the BLM that they have made sufficient progress to formally start the environmental review and public participation process. The applications are advanced enough in the permitting process that they could potentially be cleared for approval by December 2010. The proposed fast-track projects total approximately 6,022 MW of generating capacity; one is located in Arizona, four are in Nevada, and the rest are in California.3 The fast-track projects are designated by footnote in Table B-1. Table B-2 summarizes the locations, acreage, and estimated electric generation capacities of the active applications. The vast majority of the applications are located in three states (Arizona, California, and Nevada); two of the states in the "Programmatic Environmental Impact

1 The applications as of February 2010 were used to support analysis in the PEIS; however, as of December 1, 2010, the BLM had 104 active applications, including 30 in California, 35 in Nevada, 36 in Arizona, and 3 in New Mexico. 2 Table B-1 lists 17 individual applications for fast-track projects. This is because the Ivanpah power tower facility (main application #48668) has also been processed under 3 other application numbers (49502, 49503, 49504). The actual number of solar fast-track projects is 14. 3 Six fast-track projects have been approved in California and two have been approved in Nevada: BrightSource Energy's Ivanpah Solar Electric Generating System, Tessera Solar's Imperial Valley and Calico Solar Projects, Chevron Energy Solution's Lucerne Valley Solar Project, NextEra's Genesis Ford Dry Lake Solar Project, Solar Millennium's Blythe and Amargosa Farm Road Solar Projects, and First Solar's Silver State North Solar Project.

Draft Solar PEIS

B-1

December 2010

TABLE B-1 Active Solar Applications on BLM-Administered Lands as of February 5, 2010a

Total Case Acres 4,000 7,375 6,232 6,705 15,634 5,748 24,221 6,003 5,997 19,000 13,440 5,794 25,860 32,000 11,535 20,699 15,040 13,428 20,165 5,600 25,204 5,678 14,047 15,000 28,760 14,765 27,036 5,855 11,960 10,947 1,780 590

Draft Solar PEIS B-2 December 2010

Serial Number AZA 034187c AZA 034184 AZA 034186 AZA 034200 AZA 034201 AZA 034321 AZA 034335 AZA 034357 AZA 034358 AZA 34416 AZA 034424 AZA 034425 AZA 034426 AZA 034427 AZA 034540 AZA 034554 AZA 034560 AZA 034566 AZA 034568 AZA 034665 AZA 034666 AZA 034668 AZA 034737 AZA 034739 AZA 034754 AZA 034774 AZA 034797 AZA 034799 AZA 034936 AZA 034946 AZA 035134 AZA 035137

Customer Name (Project Name and/or Geographic Area) NextEra/Boulevard Assoc., LLC (Sonoran Solar) Boulevard Assoc., LLC (Aguila) Boulevard Assoc., LLC (Burnt Mountain/ Big Horn) NextEra/Boulevard Assoc., LLC (Mountain Spring) Boulevard Assoc., LLC (Senator) Ausra AZ II, LLC (Palo Verde) Boulevard Assoc., LLC (Bouse) First Solar (Gila Bend) First Solar (Saddle Mtn.) Pacific Solar Invst., Inc. (Iberdrola) (Eagle Trail) Pacific Solar Invst., Inc. (Iberdrola) (Big Horn) Pacific Solar Invst., Inc. (Iberdrola) (Hyder) Pacific Solar Invst., Inc. (Iberdrola) (Ranegras) Pacific Solar Invst., Inc. (Iberdrola) Horizon Wind Energy, LLC (Aguila) NextLight Renewable Power, LLC (Quartzite) NextLight Renewable Power, LLC (Vicksburg) NextLight Renewable Power, LLC (Centennial) NextLight Renewable Power, LLC (Palomas) SolarReserve, LLC (Black Rock Hill) SolarReserve, LLC (Quartzsite) SolarReserve, LLC (Agua Caliente) Arizona Solar Invst., Inc. (Haraquahala) IDIT, Inc. (Little Horn) Horizon Wind Energy, LLC (Wenden) Arizona Solar Invst., Inc. (Dendora Valley) LSR Jackrabbit, LLC (Jackrabbit) LSR Palo Verde, LLC (Palo Verde) Wildcat Quartzsite, LLC (Quartzite) Wildcat Harcuvar South, LLC (Wenden) E-ON Climate & Renewables (La Posa) E-ON Climate & Renewables

Application Received June 28, 2007 June 26, 2007 June 26, 2007 June 22, 2007 June 22, 2007 Oct. 1, 2007 June 8, 2007 Nov. 6, 2007 Nov. 6, 2007 Dec. 2, 2007 Dec. 4, 2007 Dec. 7, 2007 Dec. 2, 2007 Sept. 6, 2007 March 4, 2008 March 26, 2008 March 26, 2008 March 26, 2008 March 26, 2008 May 27, 2008 May 27, 2008 May 27, 2008 July 10, 2008 July 9, 2008 March 4, 2008 Aug. 12, 2008 Aug. 27, 2008 Aug. 27, 2008 Jan. 29, 2009 Jan. 28, 2009 July 2, 2009 July 2, 2009

MWb 375 500 500 250 250 840 500 500 300 1,500 900 300 2,000 2,000 250 500 500 500 500 600 100 600 500 1,000 250 500 500 600 800 800 Unknown 100

Planned Technology CSP/trough CSP/trough CSP/trough CSP/trough CSP/trough CSP/CLFR CSP/trough PV PV CSP/trough CSP CSP/trough CSP/trough CSP/trough CSP/trough CSP/trough CSP/trough CSP/trough CSP/trough CSP/tower CSP/tower CSP/tower CSP/trough CSP/trough CSP/trough CSP/trough CSP/tower CSP/trough CSP/tower CSP/tower Unknown PV

NOI Published July 8, 2009

Field Office Lower Sonoran Hassayampa Hassayampa Kingman Kingman Hassayampa Lake Havasu: Yuma Lower Sonoran Lower Sonoran Yuma Hassayampa Lower Sonoran; Yuma Yuma Yuma Hassayampa Yuma Yuma Yuma Yuma Yuma Yuma Yuma Hassayampa Yuma Lake Havasu Lower Sonoran Hassayampa Lower Sonoran Yuma Lake Havasu Yuma Yuma

Jan. 14, 2010

1

Draft Solar PEIS B-3 December 2010

TABLE B-1 (Cont.)

Total Case Acres 5,800 22,892 6,017 9,481 6,873 4,168 20,608 8,384 10,611 4,099 5,213 9,481 15,824 5,325 8,625 4,535 35,466 13,528 12,046 35,639 3,811 6,719 6,634 5,464

Serial Number AZA 035166 AZA 035236 CACA 047740c CACA 048649c CACA 048668c CACA 048669 CACA 048728 CACA 048741 CACA 048742 CACA 048808 CACA 048810c CACA 048811c CACA 048818 CACA 048820 CACA 048875 CACA 048880c CACA 049002 CACA 049004 CACA 049006 CACA 049008 CACA 049016c CACA 049017 CACA 049097 CACA 049150

Customer Name (Project Name and/or Geographic Area) IDIT, Inc. (Arlington West) Solar Reserve (Safford Solar Energy Center/ San Simon) SES Solar Two, LLC First Solar (Desert Sunlight) Solar Partners I, LLC (Ivanpah SEGS) First Solar (Stateline/Ivanpah) FPL Energy (McCoy) Solar Investments, LLC (Baker Solar) Solar Investments, LLC (Silurian Valley) Chuckwalla Solar 1, LLC (Chuckwalla) Solar Millenium/Chevron (Palen) Solar Millenium/Chevron (Blythe) First Solar (Desert Opal) First Solar (Desert Sapphire) DPT Broadwell Lake, LLC (Broadwell Dry Lake) NextEra/Boulevard Assoc., LLC (Genesis/ Ford Dry Lake) Leopold Company, LLC (Ward Valley) Boulevard Assoc., LLC (Mesquite Hills) Boulevard Assoc., LLC (Killbeck) Boulevard Assoc., LLC (Cadiz Lake) Solar Millenium, LLC (Ridgecrest) First Solar (Desert Garnet) Bull Frog Green Energy, LLC (Mule Mountain) BCL & Assoc., Inc. (Superstition Solar I)

Application Received July 27, 2009 Jan. 4, 2010 Jan. 6, 2005 Nov. 7, 2006 Nov. 17, 2006 Dec. 14, 2006 Jan. 31, 2007 Jan. 18, 2007 Jan. 18, 2007 Sept. 15, 2006 March 14, 2007 Feb. 15, 2007 Feb. 26, 2007 Feb. 13, 2007 Jan. 24, 2007 Jan. 31, 2007 April 2, 2007 May 14, 2007 May 14, 2007 May 14, 2007 March 23, 2007 Nov. 13, 2008 Oct. 1, 2008 July 17, 2007

MWb Unknown 250 750 550 400 380 250 800 1,000 200 484 968 1,205 745 500 250 4,100 1,000 1,000 1,000 250 745 2,500 500

Planned Technology PV PV CSP/dish engine PV CSP/tower PV CSP CSP CSP PV CSP/trough CSP/trough PV PV CSP CSP/trough CSP CSP CSP CSP CSP/trough PV PV PV

NOI Published

Field Office Lower Sonoran Safford

Oct. 17, 2008 Jan. 13, 2010 Nov. 6, 2007

El Centro Palm SpringsSouthcoast Needles Needles Palm SpringsSouthcoast Barstow Barstow Palm SpringsSouthcoast Palm SpringsSouthcoast Palm SpringsSouthcoast Barstow Ridgecrest Barstow Palm SpringsSouthcoast Needles Needles Needles Needles Ridgecrest Ridgecrest Palm SpringsSouthcoast El Centro

Nov. 23, 2009 Nov. 23, 2009

Nov. 23, 2009

Nov. 23, 2009

Draft Solar PEIS B-4 December 2010

TABLE B-1 (Cont.)

Total Case Acres 6,614 7,453 13,373 10,199 5,313 1,327 20,608 1,327 8,750 7,317

Serial Number CACA 049423 CACA 049424 CACA 049430 CACA 049431 CACA 049432 CACA 049488 CACA 049490 CACA 049491 CACA 049493 CACA 049494 CACA 049502c CACA 049503c CACA 049504c CACA 049511 CACA 049537c CACA 049539c CACA 049561c CACA 049584 CACA 049585 CACA 049613 CACA 049615 CACA 049702 CACA 049811 CACA 049813

Customer Name (Project Name and/or Geographic Area) Solel Inc. (Arrowhead) Solel, Inc. (Stedman) Iberdrola Renewables, Inc. (Cadiz) Boulevard Assoc., LLC (Kelbaker Rd./Amboy) PG&E (Cadiz/Trilobite) enXco, Inc. (Little Ford Dry Lake) enXco, Inc. (McCoy) enXco, Inc. (Eagle Mountai) Solel, Inc. (Palen/McCoy) Solel, Inc. (Desert Lily) Solar Partners IV, LLC Solar Partners VIII, LLC Solar Partners II, LLC First Solar (Desert Obsidian) SES Solar Three, LLC (SES One) SES Solar Six, LLC (SES One) Chevron Energy Solutions Co. (Lucerne) Solenergis, LLC (Caithness Soda Mt.) enXco Development, Inc. (Troy Lake Soleil) First Solar Development, Inc. (Desert Turquoise) Pacific Solar Investments, Inc. (Ogilby Solar) Bull Frog Green Energy, LLC (Big Maria Vista) NextLight Renewable Power, LLC (Ludlow) Iberdrola Renewables, Inc. (Cadiz--East)

Application Received July 23, 2007 July 23, 2007 Dec. 8, 2008 Sept. 21, 2007 Sept. 24, 2007 Nov. 13, 2007 Nov. 13, 2007 Nov. 13, 2007 March 27, 2008 Nov. 6, 2007 Dec. 10, 2007 Dec. 10, 2007 Dec. 10, 2007 Nov. 13, 2008 March 14, 2007 March 14, 2007 Dec. 7, 2007 Dec. 18, 2007 Dec. 12, 2007 Dec. 3, 2007 Sept. 4, 2007 June 1, 2008 March 24, 2008 April 1, 2008

MWb Unknown 600 Unknown 1,000 800 300 300 300 500 500

Planned Technology Unknown CSP CSP CSP Unknown CSP CSP CSP CSP CSP CSP/tower CSP/tower CSP/tower PV CSP/dish engine CSP/dish engine PV PV CSP/tower PV PV PV PV CSP

NOI Published

Field Office Needles Barstow Needles Needles Needles Palm SpringsSouthcoast Palm SpringsSouthcoast Palm SpringsSouthcoast Palm SpringsSouthcoast Palm SpringsSouthcoast Needles Needles Needles Ridgecrest Barstow Barstow Barstow Barstow Barstow El Centro El Centro Palm SpringsSouthcoast Barstow Needles

See CACA '48668 See CACA '48668 See CACA '48668 8,943 600 3,392 350 5,212 518 7,995 3,710 7,525 17,807 22,717 7,691 12,833 500 45 350 1,000 500 1,500 2,500 500 1,000

Nov. 6, 2007 Nov. 6, 2007 Nov. 6, 2007 June 8, 2009 June 8, 2009 July 23, 2009

Draft Solar PEIS B-5 December 2010

TABLE B-1 (Cont.)

Total Case Acres 3,830 2,571 2,446 35,436 22,622 1,081 1,800 1,600 3,000 24,320 9,600 5,296 9,760 19,840 13,440 30,720 12,800 22,400 10,000 1,775 5,500 3,800 13,950 7,500 7,700 11,000 2,000 37

Serial Number CACA 049884 CACA 050174 CACA 050379 CACA 050504 CACA 050506 CACA 051369 CACA 050150 CACA 051579 NMNM 119969 NMNM 120310 NMNM 120857 NMNM 121092 NVN 083083 NVN 083129 NVN 083150 NVN 083151 NVN 083220 NVN 083221 NVN 083914 NVN 084052 NVN 084232 NVN 084236 NVN 084359c NVN 084465 NVN 084466 NVN 084467 NVN 084631 NVN 084654

Customer Name (Project Name and/or Geographic Area) Solar Reserve, LLC (Solar Reserve/ Imperial County) LSR Midway Well, LLC (Midway Well) LightSource Renewables, LLC (Mule Mountain II) Ausra CA III, LLC (Danby Lake/Ward Valley) Ausra CA III, LLC (Danby Lake) Invenergy Solar Development LLC (Salton Sea West) Solel, Inc. (Mojave Solar Park/Johnson Valley) Franconia Investments, LLC enXco Development Corp. (Afton) Iberdrola Renewables (Lordsburg Mesa) enXco Development Corp. Solar Reserve, LLC (Lordsburg) Cogentrix Solar Services, LLC (Primm/Jean) Cogentrix Solar Services, LLC (McCullough Pass) Cogentrix Solar Services, LLC (Amargosa) Cogentrix Solar Services, LLC (Pahrump) Cogentrix Solar Services, LLC (Beatty) Cogentrix Solar Services, LLC (Big Dune) BrightSource Engy. Solar Ptnr. (Morman Mesa) NV Power Co. (Dry Lake Valley) First Solar (Desert Spring) First Solar (Desert Jade) Solar Millenium, LLC (Amargosa Farm Road) Pacific Solar Investments, Inc. (Iberdrola) (Amargosa North) Pacific Solar Investments, Inc. (Amargosa South) Pacific Solar Investments, Inc. (Bowman) BrightSource Engy. Solar Ptnr. Navy Fac. Eng. Cmnd. SW (Fallon NAS Solar)

Application Received April 24, 2008 Aug. 11, 2008 Aug. 8, 2008 Nov. 18, 2008 Nov. 18, 2008 Sept. 16, 2009 March 10, 2008 Jan. 12, 2010 Feb. 6, 2008 March 25, 2008 July 3, 2008 Aug. 11, 2008 Jan. 18, 2007 Jan. 18, 2007 Feb. 14, 2007 Feb. 14, 2007 March 5, 2007 March 5, 2007 July 25, 2007 Aug. 14, 2007 Oct. 22, 2007 Oct. 22, 2007 Nov. 20, 2007 Dec. 7, 2007 Dec. 7, 2007 Dec. 7, 2007 Jan. 28, 2008 Jan. 25, 2008

MWb 100 400 550 Unknown Unknown 50 Unknown Unknown 600 1,500 Unknown 100 1,000 1,000 1,400 1,000 1,400 1,400 500 120 400 400 500 300 500 1000 1,200 4

Planned Technology CSP CSP CSP CSP CSP PV CSP CSP CSP/trough CSP/trough CSP CPS CSP CSP CSP CSP CSP CSP CSP CSP PV PV CSP/trough PV PV CSP/trough CSP PV

NOI Published

Field Office El Centro El Centro Palm SpringsSouthcoast Needles Needles El Centro Barstow El Centro Las Cruces Las Cruces Las Cruces Las Cruces Las Vegas Las Vegas Pahrump Las Vegas Pahrump Pahrump Las Vegas Las Vegas Las Vegas Las Vegas Pahrump Missing Pahrump Las Vegas Las Vegas Stillwater

July 13, 2009 Dec. 14, 2009

Draft Solar PEIS B-6 December 2010

TABLE B-1 (Cont.)

Total Case Acres 7,040 7,900 3,639 10,880 575 2,012 7,700 11,584 3,885 1,751 14,160 4,460 10,080 4,480 7,680 7,680 1,920 530

Serial Number NVN 084704 NVN 085077c NVN 085117 NVN 085201 NVN 085215 NVN 085612 NVN 085657 NVN 085773 NVN 086158 NVN 086159 NVN 086217 NVN 086246 NVN 086248 NVN 086249 NVN 086292c NVN 086350 NVN 086571 NVN 086782

Customer Name (Project Name and/or Geographic Area) Amargosa Flats Energy, LLC (Crystal/Johnnie) NextLight Renewable Power, LLC (Silver State [North and South]) Bull Frog Green Energy, LLC (South Keyhole Canyon) Ewindfarm, Inc. (Johnnie Pahrump) Luning (Luning Solar) Cogentrix Solar Services, LLC Cogentrix Solar Services, LLC (Amargosa South) Cogentrix Solar Services, LLC Power Partners Southwest, LLC Power Partners Southwest, LLC Nye County Solar I, LLC (Mercury) Ausra NV I, LLC (Skeleton Hills/Lathrop Wells) Ausra NV I, LLC (Highway 160) Ausra NV I, LLC (Spector Range) Solar Reserve/Tonopah Solar Energy, LLC (Crescent Dunes) Solar Reserve, LLC (Pahroc Solar) Abengoa Solar, Inc. (Lathrop Wells Solar) Southwest Solar Land Co., LLC (South Solar Ridge)

Application Received March 12, 2008 March 21, 2008 March 18, 2008 May 14, 2008 May 20, 2008 July 11, 2008 July 11, 2008 July 11, 2008 Sept. 18, 2008 Sept. 19, 2008 Sept. 29, 2008 Oct. 6, 2008 Oct. 6, 2008 Oct. 9, 2008 Nov. 5, 2008 Oct. 2, 2008 Dec. 12, 2008 Feb. 23, 2009

MWb 140 420 500 500 30 240 720 1,000 250 250 300 140 420 Unknown 180 180 500 138

Planned Technology CSP/CLFR PV PV PV PV CSP CSP/trough CSP CSP CSP CSP/trough CSP/trough CSP/trough CSP/trough CSP/tower CSP/tower CSP/trough PV

NOI Published

Field Office Pahrump Las Vegas Las Vegas Pahrump Stillwater Las Vegas Pahrump Las Vegas Las Vegas Las Vegas Las Vegas Pahrump Pahrump Pahrump Tonopah Caliente Pahrump Pahrump

June 30, 2009

Nov. 24, 2009

a

The applications received as of February 2010 were used to support analysis in the PEIS; however, as of December 1, 2010, the BLM had 104 active applications, including 30 in California, 35 in Nevada, 36 in Arizona, and 3 in New Mexico.

Total MW of all fast-track projects = 6,022. Serial numbers associated with fast-track solar projects.

b

c

Source: Resseguie (2010).

1

TABLE B-2 Summary Tablea

Active Applications (Serial Numbers) 34 55 0 4 34 0 127 Approximate Acreage 454,790 498,109 0 42,216 280,178 0 1,275,293 Estimated MW 19,565 34,422 0 2,200 18,032 0 74,219

State Arizona California Colorado New Mexico Nevada Utah Totals

a

Data current as of March 1, 2010.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Statement for Solar Energy Development in Six Southwestern States" (Solar PEIS) study area (Colorado and Utah) currently have no active applications. The total acreage of BLM-administered lands applied for is approximately 1.3 million acres (5,261 km2), while the estimated total capacity of the facilities is approximately 74,000 MW. These values equate to an average land use of 17 acres/MW for all of the active applications combined. This land use is greater than the land use requirements assumed in the Solar PEIS (i.e., 5 acres/MW for parabolic trough facilities; 9 acres/MW for all other facilities), reflecting the fact that applicants often request additional acreage to allow flexibility in project design or to avoid lands where resource conflicts might exist within the ROW. B.2 REFERENCES Note to Reader: This list of references identifies Web pages and associated URLs where reference data were obtained for the analyses presented in this PEIS. It is likely that at the time of publication of this PEIS, some of these Web pages may no longer be available or their URL addresses may have changed. The original information has been retained and is available through the Public Information Docket for this PEIS. BLM (U.S. Bureau of Land Management), 2010, Fast-Track Renewable Energy Projects. Available at http://www.blm.gov/wo/st/en/prog/energy/renewable_energy/fasttrack_renewable.html. Last updated May 7, 2010. Accessed July 10, 2010. Resseguie, L.J., 2010, "List of Active Solar Cases," personal communication from Resseguie (Realty Specialist, U.S. Bureau of Land Management, Wyo.) to H.M. Hartmann (Argonne National Laboratory, Ill.), March 3.

Draft Solar PEIS

B-7

December 2010

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

This page intentionally left blank.

Draft Solar PEIS

B-8

December 2010

Information

Microsoft Word - AppendiX_B.doc

10 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

1248539


You might also be interested in

BETA
Microsoft Word - AppendiX_B.doc
IV