CPF Power Plant

Block 7&3 Oil Fields Project

PS #3

First River Crossing

10 MW

Al-Jabalayn OBC

PS #2

PS #4 PS #5

Second River Crossing

Central Processing Facilities

Crude Oil Export Pipeline

Palouge FSF Palouge FPF

Palogue OBC PS #1

PS #6

AIRPORT

Palouge Power Plant Adar FPF Adar Pipeline 76km,)

RED SEA MOUNTAIN

40MW

PORT SUDAN Marine Terminal Adar existing Camp and airstrip

Adar FSF

Project Components Supplier European Countries

UNITED KINGDOM GERMANY NORWAY FINLAND BELGIUM BULGARIA SWITZERLAND

FRANCE HOLLAND ITALY TURKEY

SPAIN

Project Components Supplier Asian Countries

MIDDLE EAST(UAE) CHINA JAPAN

KOREA LEBANON MALAYSIA

INDIA

SINGAPORE INDONESIA

Project Components Supplier American Countries

VENEZUELA BRAZIL

Foreign Companies working in the Project

CANADA

UNITED KINGDOM FRANCE GERMANY FINLAND RUSSIA

ITALY

JAPAN

EYGPET CHINA

OMAN

INDIA

MALYSIA

SOUTH AERICA

Line Pipe Supply

Line pipes at storage yard in Port Sudan

Loading of pipes onto ship at Port in China

Export Pipeline Segment A1 ­ CPPE

Line Pipe Transport Welding

Welding

Construction Camps

Export Pipeline Segment A2 ­ STG/Troytransgaz

Transport

Office and accommodation for OWNER

Stringing

ADAR FSF

OGM 3 common manifold

Completed RMU building, wellhead & transformer @ Yale-1

Flowline inlet to common manifold.

Wellhead and sand-trap

RMU Building

ADAR FPF

Trunkline & Flowline @ receiver area

Crude Oil Storage Tank (2 nos). One is undergoing painting.

Overview of Train 1 (1st Stage Separators, 2nd Stage Separators and Heat Exchangers)

Sub station Building

Diesel storage & FW Tanks

Overview of Tank Area

ADAR PIPELINE

Fitting up riser at Receiver Palogue

Installation of pig into NPS 20 Pig Launcher at FPF

POWER PLANT - PALOGUE

PALOGUE FSF

Piping connected to Christmas Tree at wellhead

Flowline connected to piping at the wellhead.

The pigging flowline activity. The dust come out from receiver at OGM.

PALOGUE FPF

Sub station building

Heat Medium Package

From left: Tank A, B & C

INSTRUMENT AIR SYS

Piperack No 4

Installed 2nd stage separator

Piperack No 2 Piperack No 1

CPF AL JABALAYN

Pipe Spool & Cable Tray Cold vent Knock our drum TANK C & D

Surge Vessel Gas Boot

Instrument Air

Water Treatment Package

CHEMICAL INJECTION SKID & TANK

PIPELINE SEGMENT A1

Block Valve Installation

Block Valve Installation & Tie-in

PIPELINE SEGMENT A2

Blue Nile River crossing

Linepipe ready for tie-in at Blue Nile River crossing

Exit of ­ 28" Rimmer drill for HDD at Blue Nile

New HDD Rig

PIPELINE SEGMENT B1

Scraper Launcher installation at PS4 Scraper trap at PS4

Scraper Receiver installation at PS5

PIPELINE SEGMENT B2-1

Welding of incoming pipeline to MT

Scraper Receiver at MT

PUMP STATION1 (PS1) - Palogue

MCC Building

Air Cooler Pump & Drivers on its foundations with shelter

PUMP STATION 2 (PS2) ­ Al Jabaleen

Main Pump Area

Flanges

Crude oil treatment package

PUMP STATION 4 (PS4) ­ El Fon

Air Cooler

Overview of PS4- Main Pump, Air Cooler, MCC, Genset Areas

Main Pump Foundations

Pumps & Genset Foundations

Sump Pit

MCC Building

PUMP STATION 5 (PS5) ­ Jabal Umm Ali

Air Cooler Area

PUMP SHELTER

Crude Oil Treatment System

Crude Oil Treatment System

EXPORT MARINE TERMINAL ­ Port Sudan

HIEDYC ­ For soil improvement & compaction Rebars Works In Progress ­ Tank 30101B

Plate Bending - Tankage

Concreting [Truck Ready Mixer ] of the Ring Beam- Tank 30101C

Information

Slide 1

26 pages

Report File (DMCA)

Our content is added by our users. We aim to remove reported files within 1 working day. Please use this link to notify us:

Report this file as copyright or inappropriate

843804